HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 25217.7-2019 English PDF

US$119.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 25217.7-2019: Methods for test, monitoring and prevention of rock burst -- Part 7: Monitoring method of mining-induced stress
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 25217.7-2019English119 Add to Cart 3 days [Need to translate] Methods for test, monitoring and prevention of rock burst -- Part 7: Monitoring method of mining-induced stress Valid GB/T 25217.7-2019

PDF similar to GB/T 25217.7-2019


Standard similar to GB/T 25217.7-2019

GB/T 26127   GB/T 25211   GB/T 25210   GB/T 25217.8   GB/T 25217.9   GB/T 25217.14   

Basic data

Standard ID GB/T 25217.7-2019 (GB/T25217.7-2019)
Description (Translated English) Methods for test, monitoring and prevention of rock burst -- Part 7: Monitoring method of mining-induced stress
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard D20
Classification of International Standard 73.040
Word Count Estimation 6,643
Date of Issue 2019-08-30
Date of Implementation 2020-03-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 25217.7-2019: Methods for test, monitoring and prevention of rock burst -- Part 7: Monitoring method of mining-induced stress


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Methods for test, monitoring and prevention of rock burst - Part 7. Monitoring method of mining-induced stress ICS 73.040 D20 National Standards of People's Republic of China Impact ground pressure measurement, monitoring and prevention methods Part 7. Mining stress monitoring method Methodsfortest, monitoringandpreventionofrockburst- Part 7. Monitoringmethodofmining-inducedstress Published on.2019-08-30 2020-03-01 implementation State market supervision and administration China National Standardization Administration issued

Foreword

GB/T 25217 "Method for measuring, monitoring and controlling impact ground pressure" is divided into 14 parts. --- Part 1. Determination of impact tendency classification and index of roof rock formation; --- Part 2. Determination of the impact tendency of coal and the method of determining the index; --- Part 3. Determination of the impact tendency classification and index of coal and rock composite test pieces; --- Part 4. Microseismic monitoring methods; --- Part 5. Geophone monitoring methods; ---Part 6. Drill cuttings monitoring method; ---Part 7. Mining stress monitoring method; --- Part 8. Electromagnetic radiation monitoring methods; ---Part 9. Coal seam water injection prevention methods; --- Part 10. Coal seam drilling pressure relief method; --- Part 11. Coal seam pressure relief blasting prevention methods; --- Part 12. Prevention and control methods for mining protective layers; --- Part 13. Prevention and treatment of roof deep hole blasting; --- Part 14. Roof hydraulic pressure cracking prevention methods. This part is part 7 of GB/T 25217. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part is proposed and managed by the China Coal Industry Association. This section drafted by. Tiandi Technology Co., Ltd., Coal Science and Technology Research Institute Co., Ltd., Yankuang Group Co., Ltd., Beijing University of Science and Technology, Liaoning University of Engineering and Technology, China University of Mining and Technology. The main drafters of this section. Qi Qingxin, Pan Junfeng, Zhang Xiufeng, Jiang Fuxing, Wang Shuwen, Zhang Hongwei, Dou Linming, Liu Shaohong, Zhao Shankun, Qin Zikai. Impact ground pressure measurement, monitoring and prevention methods Part 7. Mining stress monitoring method

1 Scope

This part of GB/T 25217 specifies the terms and definitions, monitoring schemes and impacts involved in mine ground pressure mining stress monitoring. The determination of the danger. This part is applicable to the monitoring of mining ground pressure and mining stress.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 7665-2005 sensor general terminology GB/T 16414-2008 coal mine science and technology term rock mechanics

3 Terms and definitions

The following terms and definitions as defined in GB/T 7665-2005 and GB/T 16414-2008 apply to this document. 3.1 Mining stress-induced stress The mining project affects the stress in the rock mass. [GB/T 16414-2008, definition 2.27] 3.2 Stress sensor stresstransducer A sensor capable of measuring the stress of coal rock, usually composed of a stress sensitive component and a conversion component. 3.3 Monitoring point stress-monitoringpoint The location where the sensitive components of the stress sensor are buried in the coal and rock mass. 3.4 Monitoring point depth stress-monitoringpointdepth The vertical distance between the buried position of the sensitive component of the stress sensor and the surface of the alley. 3.5 Monitoring group stress-monitoringpointset A collection of several monitoring points that are close in distance. 3.6 Stress change rate The amount of change in stress at the monitoring point per unit time.

4 mining stress monitoring program

4.1 Main functions and technical parameters of mining stress monitoring system 4.1.1 The stress of coal and rock can be monitored online, and the stress data is automatically uploaded to the ground server and stored in time series.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 25217.7-2019_English be delivered?

Answer: Upon your order, we will start to translate GB/T 25217.7-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 25217.7-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 25217.7-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.