HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 25217.6-2019 English PDF

US$199.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 25217.6-2019: Methods for test, monitoring and prevention of rock burst -- Part 6: Monitoring method of drilling bits
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 25217.6-2019English199 Add to Cart 3 days [Need to translate] Methods for test, monitoring and prevention of rock burst -- Part 6: Monitoring method of drilling bits Valid GB/T 25217.6-2019

PDF similar to GB/T 25217.6-2019


Standard similar to GB/T 25217.6-2019

GB/T 26127   GB/T 25211   GB/T 25210   GB/T 25217.8   GB/T 25217.9   GB/T 25217.14   

Basic data

Standard ID GB/T 25217.6-2019 (GB/T25217.6-2019)
Description (Translated English) Methods for test, monitoring and prevention of rock burst -- Part 6: Monitoring method of drilling bits
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard D20
Classification of International Standard 73.010
Word Count Estimation 10,155
Date of Issue 2019-10-18
Date of Implementation 2020-05-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 25217.6-2019: Methods for test, monitoring and prevention of rock burst -- Part 6: Monitoring method of drilling bits


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Methods for test, monitoring and prevention of rock burst--Part 6. Monitoring method of drilling bits ICS 73.010 D20 National Standards of People's Republic of China Impact ground pressure measurement, monitoring and prevention methods Part 6. Drill cuttings monitoring method Methodsfortest, monitoringandpreventionofrockburst- Part 6. Monitoringmethodofdrilingbits Published on.2019-10-18 2020-05-01 implementation State market supervision and administration China National Standardization Administration issued

Foreword

GB/T 25217 "Method for measuring, monitoring and controlling impact ground pressure" is divided into 14 parts. --- Part 1. Determination of impact tendency classification and index of roof rock formation; --- Part 2. Determination of the impact tendency of coal and the method of determining the index; --- Part 3. Determination of the impact tendency classification and index of coal and rock composite test pieces; --- Part 4. Microseismic monitoring methods; --- Part 5. Geophone monitoring methods; ---Part 6. Drill cuttings monitoring method; ---Part 7. Mining stress monitoring method; --- Part 8. Electromagnetic radiation monitoring methods; ---Part 9. Coal seam water injection prevention methods; --- Part 10. Coal seam drilling pressure relief method; --- Part 11. Coal seam pressure relief blasting prevention methods; --- Part 12. Prevention and control methods for mining protective layers; --- Part 13. Prevention and treatment of roof deep hole blasting; --- Part 14. Roof hydraulic pressure cracking prevention methods. This part is part 6 of GB/T 25217. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part is proposed and managed by the China Coal Industry Association. This section drafted by. Coal Science and Technology Research Institute Co., Ltd., Shandong Energy Group Co., Ltd., China Coal Energy Group Co., Ltd. Company, Henan Dayou Energy Co., Ltd., Liaoning University. The main drafters of this section. Zhao Shankun, Yan Minghua, Pan Yishan, Yan Hegang, Qi Qingxin, Guo Xinshan, Liu Jun, Ding Chuanhong, Li Haitao. Impact ground pressure measurement, monitoring and prevention methods Part 6. Drill cuttings monitoring method

1 Scope

This part of GB/T 25217 specifies the terms and definitions, instruments and equipment, construction workers involved in the monitoring method of coal mine impact ground cuttings. Arts and impact hazard identification methods. This section is applicable to the monitoring of drill cuttings in coal mines. This section does not apply to coal seam moisture content is too high or coal seams are too soft.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 16414 Coal Mine Science and Technology Terms Rock Mechanics

3 Terms and definitions

The following terms and definitions as defined in GB/T 16414 apply to this document. 3.1 Drill cutting method Drilling holes in the coal seam, according to the amount of coal powder discharged per meter and its variation law and the related dynamic phenomena during the drilling process A method of danger. 3.2 Pulverized coal volume drilingpowder The weight of coal powder discharged per meter of borehole length. 3.3 Drilling depth drilingdepth The length of the hole from the coal wall to the position of the measured coal powder. 3.4 Dynamic effect dynamiceffects Card drilling, suction drilling, top drilling, abnormal sound and impact in the hole during the drilling process. 3.5 Normal pulverized coal volume normaldrilingpowder The amount of coal powder measured in areas where there is no mining and geological structure. 3.6 Actual pulverized coal volume actualdrilingpowder The amount of coal powder measured in the monitoring area.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 25217.6-2019_English be delivered?

Answer: Upon your order, we will start to translate GB/T 25217.6-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 25217.6-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 25217.6-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.