HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 25122.5-2018 English PDF

US$168.00 ยท In stock
Delivery: <= 2 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 25122.5-2018: Railway applications -- Power converters installed on board rolling stock -- Part 5: Traction converter for urban rail vehicle
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 25122.5-2018English168 Add to Cart 2 days [Need to translate] Railway applications -- Power converters installed on board rolling stock -- Part 5: Traction converter for urban rail vehicle Valid GB/T 25122.5-2018

PDF similar to GB/T 25122.5-2018


Standard similar to GB/T 25122.5-2018

GB/T 25123.2   GB/T 25123.1   GB/T 25123.4   GB/T 25122.3   GB/T 25122.4   GB/T 25122.1   

Basic data

Standard ID GB/T 25122.5-2018 (GB/T25122.5-2018)
Description (Translated English) Railway applications -- Power converters installed on board rolling stock -- Part 5: Traction converter for urban rail vehicle
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard S35
Classification of International Standard 29.280
Word Count Estimation 10,113
Date of Issue 2018-12-28
Date of Implementation 2019-07-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 25122.5-2018: Railway applications -- Power converters installed on board rolling stock -- Part 5: Traction converter for urban rail vehicle


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Railway applications--Power converters installed on board rolling stock--Part 5. Traction converter for urban rail vehicle ICS 29.280 S35 National Standards of People's Republic of China Power converter for rail transit vehicles Part 5. Urban rail vehicle traction converter Part 5.Tractionconverterforurbanrailvehicle Published on.2018-12-28 2019-07-01 implementation State market supervision and administration China National Standardization Administration issued

Content

Foreword I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Conditions of use 1 5 System Composition 2 6 Technical requirements 2 7 Test Method 4 8 Inspection rules 5 9 Marking, packaging, transportation and storage 6

Foreword

GB/T 25122 "Power converter for rail transit vehicles" is divided into five parts. --- Part 1. Characteristics and test methods; --- Part 2. Supplementary technical information; --- Part 3. Locomotive traction converters; --- Part 4. Electric vehicle unit traction converter; --- Part 5. Urban rail vehicle traction converter. This part is the fifth part of GB/T 25122. This part is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This part is proposed by the National Railway Administration. This part is under the jurisdiction of the National Traction Electrical Equipment and Systems Standardization Technical Committee (SAC/TC278). This section is responsible for drafting the unit. CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd. Participated in the drafting of this section. CRRC Qingdao Sifang Vehicle Research Institute Co., Ltd., China Railway Science Research Institute, Locomotive and Rolling Stock Institute, CRRC Qingdao Sifang Locomotive & Rolling Stock Co., Ltd. and Xiangtan Electric Co., Ltd. The main drafters of this section. Feng Jianghua, Wan Weiwei. Participated in the drafting of this section. Liu Haitao, Xia Meng, Song Shuquan, Wu Donghua, Chen Hongwei. Power converter for rail transit vehicles Part 5. Urban rail vehicle traction converter

1 Scope

This part of GB/T 25122 stipulates the use conditions, system composition, technical requirements, inspection methods and inspection of the traction converter of urban rail vehicles. Rules, signs, packaging, transportation and storage. This section applies to urban rail vehicle traction converters (hereinafter referred to as converters).

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 1402 rail transit traction power supply system voltage GB/T 2423.1-2008 Environmental testing of electric and electronic products - Part 2. Test methods Test A. Low temperature GB/T 2423.2-2008 Environmental testing of electrical and electronic products - Part 2. Test methods Test B. High temperature GB/T 2900.32 Electrotechnical terminology power semiconductor device GB/T 2900.33 Electrotechnical terminology power electronics technology GB/T 4208-2017 enclosure protection grade (IP code) GB/T 21413.1-2008 Railway applications -- Electrical equipment for rolling stock -- Part 1 . General conditions and general rules GB/T 21414 Regulations for the protection of electrical hazards in railway applications GB/T 21563-2018 Impact and vibration test of rail transit locomotive equipment GB/T 24338.4-2018 Electromagnetic compatibility of rail transit - Part 3-2. Equipment for rolling stock GB/T 25119 rail transit rolling stock electronic device GB/T 25122.1-2018 Power converters for railway rolling stock -- Part 1 . Characteristics and test methods GB/T 25343.3 Railway applications - Welding of rail vehicles and their components - Part 3. Design requirements GB/T 32350.1-2015 Rail insulation insulation - Part 1. Basic requirements Electrical and electronic equipment clearance Creepage distance GB/T 34571 Rail Traffic Locomotive Vehicle Wiring Rules TB/T 1484.1 Rolling stock cables - Part 1. Power and control cables TB/T 1484.3 Rolling stock cables - Part 3. Communication cables TB/T 1508 locomotive electrical panel

3 Terms and definitions

The terms and definitions defined in GB/T 2900.32, GB/T 2900.33 and GB/T 25122.1-2018 apply to this document.

4 Conditions of use

4.1 Environmental conditions The converter should work properly under the following environmental conditions.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 25122.5-2018_English be delivered?

Answer: Upon your order, we will start to translate GB/T 25122.5-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 2 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 25122.5-2018_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 25122.5-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.