HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 24963-2019 English PDF

US$919.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 24963-2019: Installation and equipment for liquefied natural gas - Ship to shore interface
Status: Valid

GB/T 24963: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 24963-2019English919 Add to Cart 7 days [Need to translate] Installation and equipment for liquefied natural gas - Ship to shore interface Valid GB/T 24963-2019
GB/T 24963-2010EnglishRFQ ASK 6 days [Need to translate] Installation and equipment for liquefied natural gas -- Ship to shore interface Obsolete GB/T 24963-2010

PDF similar to GB/T 24963-2019


Standard similar to GB/T 24963-2019

GB/T 22724   GB/T 20368   GB/T 26978   GB/T 24964   GB/T 24959   

Basic data

Standard ID GB/T 24963-2019 (GB/T24963-2019)
Description (Translated English) Installation and equipment for liquefied natural gas - Ship to shore interface
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard E24
Classification of International Standard 75.060
Word Count Estimation 46,472
Date of Issue 2019-06-04
Date of Implementation 2020-01-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 24963-2019: Installation and equipment for liquefied natural gas - Ship to shore interface

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Installation and equipment for liquefied natural gas--Ship to shore interface ICS 75.060 E24 National Standards of People's Republic of China Replace GB/T 24963-2010 LNG equipment and installation ship-shore interface (ISO 28460.2010, Petroleum and naturalgasindustries- Ship-to-shoreinterfaceandportoperations, MOD) Published on.2019-06-04 2020-01-01 implementation State market supervision and administration China National Standardization Administration issued

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 LNG characteristics and related risk factors 3 5 Electrical safety in hazardous areas and terminals 4 6 Security 4 7 Shipping operations 9 8 Port Service 10 9 Maritime interface 10 10 Ship equipment 12 11 Ship/shore transmission equipment 14 12 LNG transmission program 17 13 Security Management 19 14 Cargo measurement 20 15 personnel training 20 16 Communication Mechanism 20 Appendix A (informative) Structural changes in this standard compared to ISO 28460.2010 21 Appendix B (informative appendix) Shipshore Safety Checklist 23 Appendix C (informative) LNG transmission operation stop safe operation procedure 27 Appendix D (informative) Ship-shore compatibility table 28 Reference 41

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard replaces GB/T 24963-2010 "LNG equipment and installation ship-shore interface", compared with GB/T 24963-2010, The main technical changes except editorial changes are as follows. --- Revised the scope of the content (see Chapter 1, Chapter 1 of the.2010 edition); --- Added some normative references and replaced some of the converted international standards with national standards (see Chapter 2); --- Removed the acronym section (see 3.2 of the.2010 edition); --- Increased risk identification during LNG interface, terminal operations and transmission (see 4.2, 4.3); --- Increased the dangerous area of the dock, the electrical safety of the terminal and the insulation flange (see Chapter 5); --- Increased the relevant content of the evaporation gas return system (see 6.2.16); --- Increased the contents of shipping operations, port services and maritime interfaces (see Chapter 7, Chapter 8, Chapter 9); --- Added LNG transmission procedures, pre-transmission meetings, information exchange and post-transmission meetings (see 12.3, 12.4, 12.11); --- Increased security management, cargo measurement, personnel training and communication mechanisms (see Chapter 13 ~ Chapter 16). This standard uses the redrafting method to modify the use of ISO 28460.2010 "oil and gas industry LNG equipment and installation vessels Shore interface and port operations. This standard has more structural adjustments than ISO 28460.2010. This standard and ISO 28460.2010 are listed in Appendix A. The chapter number is compared to the list. The technical differences between this standard and ISO 28460.2010 and their reasons are as follows. ---About the normative reference documents, this standard has made technical adjustments to adapt to China's technical conditions, adjustments The situation is reflected in Chapter 2, “Regulatory Citations”, and the specific adjustments are as follows. ● Added references to GB/T 19204, GB/T 22724, GB 50116, GB 50058, GB 50183, GB 51156, JTS165-5-2016, SY/T 6986.1, ISO 5620-1, ISO 5620-2 and ISO 10497. --- Chapter 3 added the terminology and definition of "shipping restricted zone", "mobile security zone", "ship compatibility study", and deleted "safety failure" "Dock", "LNG ship bottom gas", "shore power supply", "ship transportation service system", "audit" terminology and definition, unified industry terminology. --- Deleted the original standard "3.2 abbreviations", the domestic LNG industry has developed over the years, acronyms have formed a consensus, and in other specifications There are specific instructions. ---4.2 "LNG risk description and potential risk factors in the transmission process" increased the "main potential wind in LNG transmission operations" "", "including ship mooring failure" "wrong cooling or heating procedures, including cooling/heating of the loading/unloading arms and pipes, setting, "Change and vent" "Leakage of flanges and valves, including quick connect/disconnect devices" "Storage tank overfill" "Emergency disconnect device" ""The tank pressure is too high or too low (onboard and on the shore)" "water hammer in the transfer line" is targeted to improve the operation process The risk of strengthening the safety instructions for the operation process. ---4.3 "Relevant factors affecting ship-to-shore interface and terminal operations" added "possible siltation of ballast tanks, icing to pilotage, ports and “The impact of terminal operations” “Tropical storms, high latitude factors, the impact of currents on berthing”; “other factors to be considered” Added "collapse of LNG carrier and dock during docking and berthing, stranding or other navigational errors during inbound and outbound navigation, LNG The ship loses power, tug cable or engine failure, toxic and flammable gases released at the receiving station or around it. Other dangers, perfect Risk identification and enhanced safety guidance for the operation process. --- Chapter 5 "Hazardous Areas and Terminal Electrical Safety" in the "Dangerous Area" was changed to "Explosive Gas Environmental Hazardous Area" and GB 50058-2014 Explosion hazard environment power device design specification to define the definition of explosive gas environmental danger zone, increase Explosion-proof tools and flammable materials control requirements, strict reference to the terms used in the standard, and improve the operational requirements. ---6.2.11 "Fire protection" requirements have been added to the "fire water cannon height, the requirements of the two-purpose ship and emergency plan", improve the elimination Prevention and emergency aspects. ---6.2.12 "LNG Leakage and Overflow Protection" added requirements for adding gas detection equipment and closed-circuit monitoring systems, and increased skills requirement. --- Added "6.2.13 LNG transmission operation to stop safe operation procedures" to strengthen the guidance on the shutdown operation. --- Added "6.2.16 Evaporative Gas Return System" to the requirements of the return arm operating principle of the ship-shore interface. --- Added the contents of Chapter 7 "Marine operations", proposed for the port area navigation plan, mobile safety zone, operating environment restrictions and anchorage Specific requirements, supplement the content not covered in the original standard. --- Added Chapter 8 "Port Service" content, and put forward specific requirements for ship transportation service system, tugboat, and pilotage. --- Added Chapter 9 "Marine Interface" content, for berth areas, restricted areas near berths, berthing and mooring aids, fenders, The mooring arrangement and the quick disconnecting system put forward specific requirements. ---11.7 "Crew and Ship Shore Channel" added "visitor management", "emergency escape", "auxiliary passage" and "rescue boat" related content, Complement and improve the shipyard interface management and operation content. --- Added "12.3 pre-transmission meeting" "12.4 information exchange" "12.11 post-transmission meeting" related LNG transmission program requirements, ISO 28460.2010 does not cover content to supplement. --- Added Chapter 13 "Security Management", Chapter 14 "Cargo Measurement", Chapter 16, "Communication Mechanism", for ISO 28460. 2010 does not cover the content to be supplemented. This standard also made the following editorial changes. --- Modified the standard name; --- Removed the appendix A (informative appendix) of ISO 28460.2010 "ship equipment"; --- Removed ISO 28460..2010 Appendix B (informative appendix) "Typical cargo transfer flow chart"; --- Removed ISO 28460..2010 Appendix C (informative appendix) "conventional LNG shutdown operation security strategy"; --- Removed ISO 28460..2010 Appendix D (informative appendix) "Recommended configuration of ship-shore signal and electrical connection"; --- Added Appendix B (informative appendix) "Shipside Safety Checklist"; --- Added Appendix C (informative appendix) "LNG transmission operation to stop safe operation procedures"; --- Added Appendix D (informative appendix) "ship compatibility table". This standard is proposed and managed by the National Oil and Gas Standardization Technical Committee (SAC/TC355). This standard is drafted by. Zhonghai Zhejiang Ningbo LNG Co., Ltd. Participated in the drafting of this standard. Zhonghai Petroleum Gas and Electricity Group Co., Ltd., Sinopec Qingdao LNG Co., Ltd., Zhongshi Oil Dalian LNG Co., Ltd. The main drafters of this standard. Sun Junmin, Zhao Hongqiang, Liu Wanshan, Wang Chengshuo, Wang Liang, Zhang Bingbing. The previous versions of the standards replaced by this standard are. ---GB/T 24963-2010. LNG equipment and installation ship-shore interface

1 Scope

This standard specifies the safe navigation of LNG carriers in the port area and the safe and efficient transmission of LNG at the receiving station. Cheng Zhong, the requirements for receiving stations, LNG carriers and ports as service providers. include. a) Pilotage and Vessel Traffic Service System (VTS); b) tugboats and tethers, unwinding operators; c) receiving station; d) LNG carrier; e) Suppliers of fuels, lubricants, spare parts and other service providers during the berthing of LNG carriers. This standard contains the following provisions. --- Safe navigation, berthing, mooring and departure from the dock; --- goods transfer; --- Ship channel; --- Ship-to-shore communication; --- all instrumentation, data and electrical connections at the ship's shore interface; ---Liquid nitrogen connection; --- Ballast water. This standard applies to port operations of LNG ships and Chinese LNG receiving stations in international LNG trade.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 19204 General characteristics of liquefied natural gas (GB/T 19204-2003, CENBSEN1160..1997, IDT) GB/T 22724 LNG equipment and installation of onshore equipment design GB 50058 Explosion Hazardous Environment Power Equipment Design Specification GB 50116 Fire Automatic Alarm System Design Specification GB 50183 Oil and gas engineering design fire protection specification GB 51156 LNG receiving station engineering design specification JTS165-5-2016 LNG Terminal Design Code SY/T 6986.1 Design and testing of liquefied natural gas equipment and installations - Part 1 . Design And testing Shipbuilding and shipbuilding - Filling joints for drinking water tanks - Part 1. General requirements (Shipbuildingand marinestructures-Filingconnectionfordrinkingwatertanks-Part 1.Generalrequirements) ISO 5620-2 Shipbuilding and ship structures - Filling joints for drinking water tanks Part 2. Components (Shipbuildingandmarine structures-Filingconnectionfordrinkingwatertanks-Part 2.Components) ISO 10497 Valve Test Fireproof Setting Requirements (Testingofvalves-Firetypesettingrequirements) International Maritime Organization International Ship and Port Facility Security Code [IMO, Internationalshipandportfacilitysecurity

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 24963-2019_English be delivered?

Answer: Upon your order, we will start to translate GB/T 24963-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 24963-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 24963-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 24963-2019?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 24963-2019 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.