|
US$209.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 24444-2009: Electroslag remelting mould Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 24444-2009 | English | 209 |
Add to Cart
|
3 days [Need to translate]
|
Electroslag remelting mould
| Valid |
GB/T 24444-2009
|
PDF similar to GB/T 24444-2009
Basic data | Standard ID | GB/T 24444-2009 (GB/T24444-2009) | | Description (Translated English) | Electroslag remelting mould | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | H93 | | Classification of International Standard | 77.180 | | Word Count Estimation | 9,966 | | Date of Issue | 2009-10-15 | | Date of Implementation | 2010-03-01 | | Quoted Standard | GB/T 700; GB/T 2040-2008; GB/T 4237; GB/T 6060.2; GB/T 9460; JB/T 9218; HG/T 2009-1991; HG/T 3362-2003 | | Regulation (derived from) | National Standard Approval Announcement 2009 No.11 (Total No.151) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the ESR mold terminology and definitions, classification and code, requirements, test methods, inspection rules, signs, packaging, transport pick up and storage and so on. This standard applies to 0. 03t ~ 240 t fixed -cooled ESR mold (hereinafter referred to as mold). |
GB/T 24444-2009: Electroslag remelting mould---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electroslag remelting mould
ICS 77.180
H93
National Standards of People's Republic of China
ESR mold
Posted 2009-10-15
2010-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
Appendix A of this standard is an informative annex.
The standard proposed by China Iron and Steel Association.
This standard by the National Metallurgical Equipment Standardization Technical Committee (SAC/TC409) centralized.
This standard was drafted. Inner Mongolia North Heavy Industries Group Co., Ltd., Weifang Oriental Metallurgical Equipment Co., Ltd., Taiyuan Metallurgical machines
Mechanical plant.
The main drafters of this standard. white Gun Qing, Gao Yun hi, Zhangpei Rong, Lu Ting Court at King Run, Ming-Zhong Li, Wang Yue, Chai Xiaoping, Huang Yan, Sunxue Bin.
ESR mold
1 Scope
This standard specifies the ESR mold terms and definitions, classification and code, requirements, test methods, inspection rules, marking, packaging, transportation
Transport and storage and so on.
This standard applies to 0.03t ~ 240t ESR stationary water-cooled mold (hereinafter referred to as mold).
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 700 carbon structural steel (GB/T 700-2006, ISO 630.1995, NEQ)
GB/T 2040-2008 Copper and copper alloy sheet
GB/T 4237 hot-rolled stainless steel sheet and strip
GB/T 6060.2 Roughness comparison specimens - Ground, turned, bored, milled, shaped and planed (GB/T 6060.2-2006,
ISO 2632/1. 1985, MOD)
GB/T 9460 copper and copper alloy wire
JB/T 9218 Non-destructive testing - Penetrant testing (JB/T 9218-2007, EN571-1.1997, MOD)
HG/T 2009-1991 C06-1 iron red alkyd primer
HG/T 3362-2003 aluminum silicone baking heat-resistant paint (two component)
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
When the ESR for the crystallization of molten steel refining and forming a cooling container.
3.2
ESR ingot maximum weight (in t).
3.3
When two or more pores in a straight line and adjacent to a plurality of spaced not more than a small pore diameter of pores equivalent.
3.4
Big mouth and small mouth diameter and the average diameter of the mold lining.
3.5
Big mouth and small mouth width of the average width of the mold lining.
3.6
The average length of mold lined with big mouth and small mouth length.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 24444-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 24444-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 24444-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 24444-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|