|
US$519.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 20319-2017: Wind turbine generator systems -- Specification for acceptance Status: Valid GB/T 20319: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 20319-2017 | English | 519 |
Add to Cart
|
5 days [Need to translate]
|
Wind turbine generator systems -- Specification for acceptance
| Valid |
GB/T 20319-2017
|
| GB/T 20319-2006 | English | 359 |
Add to Cart
|
3 days [Need to translate]
|
Code for acceptance of Wind turbines generator systems
| Obsolete |
GB/T 20319-2006
|
PDF similar to GB/T 20319-2017
Basic data | Standard ID | GB/T 20319-2017 (GB/T20319-2017) | | Description (Translated English) | Wind turbine generator systems -- Specification for acceptance | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F11 | | Classification of International Standard | 27.180 | | Word Count Estimation | 26,231 | | Date of Issue | 2017-07-12 | | Date of Implementation | 2018-02-01 | | Older Standard (superseded by this standard) | GB/T 20319-2006 | | Quoted Standard | GB/T 2900.53; GB/T 18451.2-2012; GB/T 19069; GB/T 22516; GB/T 23479.1-2009; GB/T 25387.1; GB/T 25388.1; GB/T 25389.1-2010; GB/T 25390; GB/T 33225; GB/T 33628; JGJ 82; IEC 61400-4-2012; IEC TS 61400-26-1; IEC TS 61400-26-2; VDI 3834 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the general principles, contents and methods for the installation and commissioning of wind turbines after power generation, pre-acceptance and final acceptance. This standard is applicable to horizontal shaft wind turbines (referred to as "units") where the wind turbine sweeps more than 200 m ^ (2). |
GB/T 20319-2017: Wind turbine generator systems -- Specification for acceptance---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Wind turbine generator systems. Specification for acceptance
ICS 27.180
F11
National Standards of People's Republic of China
Replacing GB/T 20319-2006
Wind turbine acceptance criteria
2017-07-12 Posted
2018-02-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Acceptance conditions 2
4.1 Pre-acceptance required information 2
4.2 final acceptance before the required information 2
4.3 instruments and personnel 3
4.4 Unit status 3
5 acceptance start 3
6 acceptance content 3
6.1 Pre-acceptance of content 3
6.2 final acceptance content 4
7 Acceptance of qualified conditions 4
7.1 pre-acceptance of qualified conditions 4
7.2 final acceptance of qualified conditions 4
8 Acceptance of documents required 5
Appendix A (informative) Pre-acceptance document example 6
Appendix B (informative) final acceptance document example 11
Appendix C (informative) power curve assessment methods 20
Appendix D (informative) operational data assessment methods and reference indicators 22
Appendix E (Informative) High-strength bolt inspection 23
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces GB/T 20319-2006 "Acceptance Specification for Wind Turbine Generator." Compared with GB/T 20319-2006 main change
As follows.
--- Modify the scope of the standard Chapter 1 (see Chapter 1,.2006 edition Chapter 1);
--- Added terms and definitions (see 3.1 ~ 3.7);
--- Increasing the conditions before acceptance (see 4.1, 4.2);
--- Added Chapter 5 acceptance started (see Chapter 5);
--- Revised the time required for trial operation and assessment indicators (see 6.1,.2006 Edition 4.3);
--- Modify the pre-acceptance inspection items and content (see 6.1,.2006 version 4.4);
--- Modify the final acceptance of the main contents (see 6.2,.2006 version 4.6);
--- Removed the measurement of grounding resistance (see.2006 version 5.3);
--- The provisions of the acceptance criteria based on the content of some of the acceptance method has been revised and moved into the appendix (see 6.1, 7.2, Appendix
A, Appendix C, Appendix D, Appendix E);
--- Modify the acceptance of qualified conditions (see 7.1, 7.2,.2006 Edition 4.4,4.6);
--- Modify the acceptance document, and gives the file format for reference (see Chapter 8 and Appendix A, Appendix B,.2006 edition Chapter 6).
This standard is proposed by the China Machinery Industry Federation.
This standard by the National Wind Machinery Standardization Technical Committee (SAC/TC50) centralized.
The main drafting units of this standard. China Agricultural Mechanization Research Institute Hohhot Branch, State Power United Technologies Co., Ltd., North
Jingjianheng Certification Center, Xinjiang Goldwind Technology Co., Ltd., Huadian Fuxin Energy Co., Ltd., China Datang Corporation of New Energy shares
Co., Ltd., China Agricultural Machinery Industry Association Wind Energy Equipment Branch, Shanghai Electric Wind Power Equipment Co., Ltd., China Classification Society Quality Certification
Secretary, China Shipbuilding Heavy Industries (Chongqing) Co., Ltd. sea-mounted wind power equipment, China Electric Power Research Institute, Guohua Energy Investment Co., Ltd., Longyuan Wind Power
Cheng Technology Co., Ltd., Guangdong Ming Yang Wind Power Industry Group Co., Ltd., energy-saving Wind Power Co., Ltd., Zhejiang Yunda Wind Power Co., Ltd.
Co., Ltd., Beijing Jun Tai Feng Energy Technology Co., Ltd., China Measurement New Energy Testing Technology Co., Ltd., Dongfang Electric Co., Ltd., Sinovel
Electric Technology (Group) Co., Ltd., Huaneng Renewable Energy Industry Holdings Limited, SGS Standard Technical Services Limited.
The main drafters of this standard. Wang Jianping, Feng Jian, Yang Hongyuan, Ning Qiaozhen, Zhang Wenzhong, Shi Wengang, Zhuang Yuexing, Liu Qi, Chen Zhenhua, Tang Wenbing,
Xue Yang, Zhou Weihua, Fan Xiaoxu, Zhang Qiying, Liang Zhijing, Zhou Minqiang, Chen Duanhui, Wang Guangguang, Wang Jiangang, Wu Lidong, Pang Jingyu, Liu Zuifu, Zhang Jie,
Zhang Wang.
Wind turbine acceptance criteria
1 Scope
This standard specifies the general principles, contents and methods of pre-acceptance and final acceptance after the wind turbine is installed and commissioned for grid-connected power generation.
This standard applies to wind turbine swept area of more than.200m2 horizontal axis wind turbine (referred to as "unit").
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2900.53 Electrotechnical terminology wind turbine
GB/T 18451.2-2012 wind turbine power characteristics test
GB/T 19069 wind turbine controller technical conditions
GB/T 22516 wind turbine noise measurement method
GB/T 23479.1-2009 Wind turbine double-fed asynchronous generator Part 1. Technical conditions
GB/T 25387.1 Full power converter for wind turbines - Part 1. Technical conditions
GB/T 25388.1 wind turbine generator doubly-fed converter Part 1. Technical conditions
GB/T 25389.1-2010 Wind power generators low speed permanent magnet synchronous generators Part 1. Technical conditions
GB/T 25390 wind turbine ductile iron parts
GB/T 33225 wind turbine power test based on cabin anemometer method
GB/T 33628 wind turbine high strength bolt connection deputy installation technical requirements
Technical code of JGJ82 steel high strength bolt connection
IEC 61400-4.2012 Wind Turbine Gearbox Design Requirements (Windturbines-Part 4.Design
requirementsforwindturbinegearboxes)
IEC TS61400-26-1 Wind Turbine Generators Part 26-1 Time-Based Wind Turbine Utilization (Wind
Turbines-Part 26-1.Timebasedavailabilityfor windturbines)
IEC TS61400-26-2 Wind Turbines - Part 26-2 - Wind Turbine Utilization Based on Power Generation (Wind
turbines-Part 26-2. Production-basedavailability for wind turbines)
VDI3834 non-direct-drive wind turbine and its components mechanical vibration measurement and evaluation [Blatt1/Part 1Measurementand
evaluationofthemechanicalvibrationofwindenergyturbinesandtheircomponents (windenergytur-
bineswithgearbox)]
3 Terms and definitions
GB/T 2900.53 defined and the following terms and definitions apply to this document.
3.1
Debugging commissioningtesting
Adjustment and test abbreviation. After the installation of the unit, according to the unit design documents and debugging outline regulation to adjust, set and a series of test workers
For the general term.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 20319-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 20319-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 20319-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 20319-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 20319-2017?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 20319-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|