US$909.00 · In stock Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 19229.1-2008: Coal-fired flue gas desulphurization equipment -- Part 1: Coal-fired flue gas wet desulphurization equipment Status: Valid GB/T 19229.1: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 19229.1-2008 | English | 909 |
Add to Cart
|
7 days [Need to translate]
|
Coal-fired flue gas desulphurization equipment -- Part 1: Coal-fired flue gas wet desulphurization equipment
| Valid |
GB/T 19229.1-2008
|
| GB/T 19229-2003 | English | 359 |
Add to Cart
|
3 days [Need to translate]
|
Desulphurization equipment of coal burning flue gas
| Obsolete |
GB/T 19229-2003
|
PDF similar to GB/T 19229.1-2008
Basic data | Standard ID | GB/T 19229.1-2008 (GB/T19229.1-2008) | | Description (Translated English) | Coal-fired flue gas desulphurization equipment -- Part 1: Coal-fired flue gas wet desulphurization equipment | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J88 | | Classification of International Standard | 13.030.40 | | Word Count Estimation | 41,486 | | Date of Issue | 2008-03-12 | | Date of Implementation | 2008-09-01 | | Older Standard (superseded by this standard) | GB/T 19229-2003 | | Quoted Standard | GB/T 191; GB/T 6388; GB 8978-1996; GB 9969.1; GB/T 13306; GB/T 13384; GB 18241.1-2001; GB 50009; GB 50011; GB 50016; GB 50040; GB 50058; GB 50128-2005; GB 50140; GB 40191; GB 50205; GB 50217; GB 50222; GB 50229; GB 50243; GB 50254; GB 50255; GB 50256; GB 50257; GB 50258 | | Regulation (derived from) | National Standard Approval Announcement 2008 No.3 (Total No.116) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the definition of flue gas desulfurization equipment, scope, technical requirements, acceptance of surrender, operation and maintenance, signs, signs, packaging, transport and storage and so on. This section is applicable to coal- fired boilers, requires the use of limestone-gypsum wet flue gas desulfurization of flue gas desulphurization equipment measures. Fuel, biomass burning and metallurgical, refer to chemical and pharmaceutical industries to perform when the exhaust need to adopt measures in wet flue gas desulfurization. |
GB/T 19229.1-2008: Coal-fired flue gas desulphurization equipment -- Part 1: Coal-fired flue gas wet desulphurization equipment ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Coal-fired flue gas desulphurization equipment Part 1. Coal-fired flue gas wet desulphurization equipment
ICS 13.030.40
J88
National Standards of People's Republic of China
Replacing GB/T 19229-2003 (section)
Coal-fired flue gas desulphurization equipment
Part 1. Wet Flue Gas Desulfurization equipment
Posted 2008-03-12
2008-09-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 2
Requirement 3 4
5 commissioning, start-up and acceptance 9
6 Operation and Maintenance 10
7 signs, signs, packaging, transportation and storage 10
Appendix A (informative) Principle Systems 12
Fire Appendix B (normative) desulfurization equipment 13
Annex C (informative) Flue Gas Desulfurization equipment and materials selection 15
Heating, ventilation and air Appendix D (informative) desulfurization equipment regulation 18
Load combinations Appendix E (normative) desulphurization equipment construction (structures) 20
Labor safety and hygiene and ergonomics Annex F (informative) desulfurization equipment 22
Annex G (informative) limestone - gypsum wet desulphurization equipment named 26
Foreword
GB/T 19229 "coal-fired flue gas desulphurization equipment" is divided into four parts.
--- Part 1. Wet process for flue gas desulfurization equipment;
--- Part 2. Flue Gas dry/semi-dry desulfurization equipment;
--- Part 3. Seawater Flue Gas Desulfurization equipment;
--- Part 4. Ammonia Flue Gas Desulfurization equipment.
This section GB/T 19229 Part 1.
This standard compared with GB/T 19229-2003, the main technical differences are as follows.
--- The original single standard is divided into four parts;
--- Increased construction and inspection and the operation and maintenance section;
--- Delete the original standard test methods and inspection rules;
--- Increased its industrial automation and control, fire, construction, HVAC, and other auxiliary equipment and system requirements;
--- Increased mainstream desulfurization technology program selection criteria and the design, construction, operation, and maintenance requirements.
Appendix B to this part of the normative appendix, Appendix A, Appendix C ~ Appendix G is an informative annex.
This section is proposed and managed by the China Machinery Industry Federation.
This section is drafted. Mechanical Science Research Institute, Wuhan Kaidi Electric Power Environmental Protection Co., Zhejiang University Institute for Thermal Power Engineering, Zhejiang
Jiangsu Feida Environmental Science and Technology Co., Ltd., Beijing soldiers in Northern Environmental Technology Development Co., Ltd., Jiangsu Suyuan Environmental Protection Engineering Co. Shares
Company, Beijing Borg Power Technology Co., Ltd., Sinosteel Tiancheng Environmental Protection Technology Co., Ltd., CPI Yuanda Environmental Protection Engineering Co.
Division, the China Huadian Engineering (Group) Co., Ltd., Xi'an Thermal Power Research Institute Co., Ltd., Sichuan Hengtai Environmental Technology Co., Ltd., North Union
Co-Power Co., Ltd., Fujian Longking Company.
The main drafters of this section. Li Xionghao, Gao Xiang, Ge Jielong, Jinjian Yong, Sun Keqin, Bai Yunfeng, Huhan Fang, Du Yungui, Chenming Zhong,
Zhang Bin Wei, Ren Min, Wang from a wide, Yan Dong, tension, Long Hui.
This part replaces the standard of previous editions.
--- GB/T 19229-2003.
Coal-fired flue gas desulphurization equipment
Part 1. Wet Flue Gas Desulfurization equipment
1 Scope
This section provides the definition of coal-fired flue gas desulfurization equipment, scope, technical requirements, acceptance of the transfer, operation and maintenance, signs, flags,
Packaging, transport and storage and so on.
This section applies to coal-fired boilers, we need to use limestone - gypsum wet flue gas desulfurization of flue gas desulphurization equipment measures. Burn
Can refer executed oil, biomass combustion and metallurgical, chemical and pharmaceutical industries need to adopt exhaust wet flue gas desulfurization measures.
2 Normative references
The following documents contain provisions which, through GB/T 19229 in this part of the reference in terms of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 191 Packaging - Pictorial signs (GB/T 191-2000, eqv ISO 780.1997)
GB/T 6388 transport package shipping mark
GB 8978-1996 Integrated Wastewater Discharge Standard
GB/T 9969.1 General Industrial Product Manual
GB/T 13306 signs
GB/T 13384 mechanical and electrical products packaging General technical conditions
GB 18241.1-2001 rubber lining Part 1. anti-corrosion lining equipment
GB 50009 building structural load specifications
GB 50011 Seismic Design of Buildings
GB 50016 architectural design code for fire protection
GB 50040 dynamic machine foundation design specification
GB 50058 Explosion and fire hazard electrical equipment design specifications
GB 50128-2005 vertical cylindrical tank welded steel construction and acceptance
GB 50140 Building fire extinguishers configuration design specifications
GB 50191 Code for seismic design of structures
GB 50205 steel construction and acceptance
GB 50217 electrical engineering design of cables
GB 50222 interior decoration of buildings for fire protection design
GB 50229 fire protection design of power plant and substation
GB 50243 Construction Quality Acceptance of Ventilation and Air Conditioning Engineering
GB 50254 ~ 50259 electric equipment installation engineering construction and acceptance
GB 50260 Code for seismic design of power facilities
GB 50300 Construction Quality Acceptance of uniform standards
GB J87 Industrial Enterprise Noise Control Design Specification
Ground DL/T 621 AC electrical installations
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 19229.1-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 19229.1-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 19229.1-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19229.1-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 19229.1-2008?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 19229.1-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|