|
US$279.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 19115.2-2018: Wind-solar photovoltaic hybrid generate electricity system -- Part 2: Test methods Status: Valid GB/T 19115.2: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 19115.2-2018 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Wind-solar photovoltaic hybrid generate electricity system -- Part 2: Test methods
| Valid |
GB/T 19115.2-2018
|
| GB/T 19115.2-2003 | English | 439 |
Add to Cart
|
3 days [Need to translate]
|
Off-grid type wind-solar photovoltaic hybrid generate electricity system of household-use -- Part 2: Test methods
| Obsolete |
GB/T 19115.2-2003
|
PDF similar to GB/T 19115.2-2018
Basic data | Standard ID | GB/T 19115.2-2018 (GB/T19115.2-2018) | | Description (Translated English) | Wind-solar photovoltaic hybrid generate electricity system -- Part 2: Test methods | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F11 | | Classification of International Standard | 27.180 | | Word Count Estimation | 14,184 | | Date of Issue | 2018-09-17 | | Date of Implementation | 2019-04-01 | | Older Standard (superseded by this standard) | GB/T 19115.2-2003 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 19115.2-2018: Wind-solar photovoltaic hybrid generate electricity system -- Part 2: Test methods ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Wind-solar photovoltaic hybrid generate electricity system - Part 2. Test methods
ICS 27.180
F11
National Standards of People's Republic of China
Replace GB/T 19115.2-2003
Wind and solar hybrid power generation system
Part 2. Test methods
Part 2. Testmethods
Published on.2018-09-17
Implementation of.2019-04-01
State market supervision and administration
China National Standardization Administration issued
Content
Foreword III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Test purpose 1
5 Wind and solar hybrid power generation system test conditions 1
6 System main components test method 2
7 Wind and solar hybrid power generation system comprehensive performance test preparation 3
8 Wind and solar hybrid power generation system comprehensive performance test method 5
9 Reliability Test 7
10 Test report 7
Appendix A (informative) Wind and solar hybrid power generation system comprehensive performance test record table 8
Foreword
GB/T 19115 "Wind and Light Complementary Power Generation System" is divided into the following two parts.
--- Part 1. Technical conditions;
--- Part 2. Test methods.
This part is the second part of GB/T 19115.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part replaces GB/T 19115.2-2003 "Off-grid household wind and solar hybrid power generation system Part 2. Test method", and
Compared with GB/T 19115.2-2003, except for editorial changes, the main technical changes are as follows.
--- This section adds a test method for grid-connected wind-solar hybrid power generation systems (see Chapter 5);
--- Adjusted the scope of application (see Chapter 1);
--- Reference standard corresponding update (see Chapter 2);
--- Added test schematic and test method for grid-connected fan controller (see Figure 1, 6.3.1);
--- Added schematic diagram and test method for grid connection system test connection method (see Figure 5, 8.2);
--- Modified the schematic diagram of the wind turbine simulator (see Figure 3);
--- Modified the inverter test method (see 6.4);
---Modified the detection method of the battery (see 6.5);
--- Revised the comprehensive performance test record table of wind-solar hybrid power generation system (see Appendix A);
--- Removed the unloader test method (see.2003 edition 5.6).
This part was proposed by the China Machinery Industry Federation.
This part is under the jurisdiction of the National Wind Machinery Standardization Technical Committee (SAC/TC50).
This section is mainly drafted by. Guangzhou Hongying Energy Technology Co., Ltd., Hefei Weimin Power Co., Ltd., Shanghai Electric Distribution
Energy Technology Co., Ltd.
The main drafters of this section. Wu Yougang, Yu Hongying, Su Ning, Chen Chaoming, Chen Xian, Zhang Weimin, Zhu Fengtian.
The previous versions of the standards replaced by this section are.
---GB/T 19115.2-2003.
Wind and solar hybrid power generation system
Part 2. Test methods
1 Scope
This part of GB/T 19115 specifies the test objectives, test conditions, test preparation and wind-solar hybrid power generation system (hereinafter referred to as the system).
Test methods and test standards.
This section applies to off-grid and grid-connected systems for wind power and photovoltaic hybrids, and the sweeping area of the wind turbine is less than.200m2 and the output is electric.
A wind power generation system or a wind-solar hybrid power generation system with a voltage lower than 1000V AC or 1500V DC.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 9535 Ground Crystalline Silicon Photovoltaic Module Design Identification and Staging
GB/T 17646 small wind turbine
GB/T 19068.2 Small wind turbines - Part 2. Test methods
GB/T 19068.3 Small wind turbines - Part 3. Wind tunnel test method
GB/T 19115.1 Wind and solar hybrid power generation system Part 1. Technical conditions
GB/T 20321.2 Inverter for off-grid wind and solar power systems - Part 2. Test methods
GB/T 22473 lead storage battery for energy storage
GB/T 30427 grid-connected photovoltaic power generation special inverter technical requirements and test methods
GB/T 34521 controller for small wind turbines
3 Terms and definitions
The terms and definitions defined in GB/T 17646 and GB/T 19115.1 apply to this document.
4 Test purposes
Detect and verify main components such as wind turbines, photovoltaic arrays, wind and solar hybrid controllers, off-grid inverters, grid-connected inverters and batteries
The quality of the products that make up the wind-solar hybrid power generation system.
5 Wind and solar hybrid power generation system test conditions
The environmental conditions of the system test shall meet the following requirements.
a) the altitude does not exceed 1000m;
b) Ambient temperature. indoor temperature. 25 °C ± 5 °C; outdoor temperature. 0 °C ~ 40 °C;
c) The relative humidity is not more than 90%.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 19115.2-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 19115.2-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 19115.2-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19115.2-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 19115.2-2018?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 19115.2-2018 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|