GB/T 19115.2-2018: Wind-solar photovoltaic hybrid generate electricity system -- Part 2: Test methods
Status: Valid

GB/T 19115.2: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 19115.2-2018English279 Add to Cart 3 days [Need to translate] Wind-solar photovoltaic hybrid generate electricity system -- Part 2: Test methods Valid GB/T 19115.2-2018
GB/T 19115.2-2003English439 Add to Cart 3 days [Need to translate] Off-grid type wind-solar photovoltaic hybrid generate electricity system of household-use -- Part 2: Test methods Obsolete GB/T 19115.2-2003

PDF similar to GB/T 19115.2-2018


Standard similar to GB/T 19115.2-2018

GB/T 19072   GB/T 19071.1   GB/T 19070   GB/T 25383   GB/T 32077   GB/T 19115.1   

Basic data

Standard ID GB/T 19115.2-2018 (GB/T19115.2-2018)
Description (Translated English) Wind-solar photovoltaic hybrid generate electricity system -- Part 2: Test methods
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F11
Classification of International Standard 27.180
Word Count Estimation 14,184
Date of Issue 2018-09-17
Date of Implementation 2019-04-01
Older Standard (superseded by this standard) GB/T 19115.2-2003
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 19115.2-2018: Wind-solar photovoltaic hybrid generate electricity system -- Part 2: Test methods


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Wind-solar photovoltaic hybrid generate electricity system - Part 2. Test methods ICS 27.180 F11 National Standards of People's Republic of China Replace GB/T 19115.2-2003 Wind and solar hybrid power generation system Part 2. Test methods Part 2. Testmethods Published on.2018-09-17 Implementation of.2019-04-01 State market supervision and administration China National Standardization Administration issued

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Test purpose 1 5 Wind and solar hybrid power generation system test conditions 1 6 System main components test method 2 7 Wind and solar hybrid power generation system comprehensive performance test preparation 3 8 Wind and solar hybrid power generation system comprehensive performance test method 5 9 Reliability Test 7 10 Test report 7 Appendix A (informative) Wind and solar hybrid power generation system comprehensive performance test record table 8

Foreword

GB/T 19115 "Wind and Light Complementary Power Generation System" is divided into the following two parts. --- Part 1. Technical conditions; --- Part 2. Test methods. This part is the second part of GB/T 19115. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part replaces GB/T 19115.2-2003 "Off-grid household wind and solar hybrid power generation system Part 2. Test method", and Compared with GB/T 19115.2-2003, except for editorial changes, the main technical changes are as follows. --- This section adds a test method for grid-connected wind-solar hybrid power generation systems (see Chapter 5); --- Adjusted the scope of application (see Chapter 1); --- Reference standard corresponding update (see Chapter 2); --- Added test schematic and test method for grid-connected fan controller (see Figure 1, 6.3.1); --- Added schematic diagram and test method for grid connection system test connection method (see Figure 5, 8.2); --- Modified the schematic diagram of the wind turbine simulator (see Figure 3); --- Modified the inverter test method (see 6.4); ---Modified the detection method of the battery (see 6.5); --- Revised the comprehensive performance test record table of wind-solar hybrid power generation system (see Appendix A); --- Removed the unloader test method (see.2003 edition 5.6). This part was proposed by the China Machinery Industry Federation. This part is under the jurisdiction of the National Wind Machinery Standardization Technical Committee (SAC/TC50). This section is mainly drafted by. Guangzhou Hongying Energy Technology Co., Ltd., Hefei Weimin Power Co., Ltd., Shanghai Electric Distribution Energy Technology Co., Ltd. The main drafters of this section. Wu Yougang, Yu Hongying, Su Ning, Chen Chaoming, Chen Xian, Zhang Weimin, Zhu Fengtian. The previous versions of the standards replaced by this section are. ---GB/T 19115.2-2003. Wind and solar hybrid power generation system Part 2. Test methods

1 Scope

This part of GB/T 19115 specifies the test objectives, test conditions, test preparation and wind-solar hybrid power generation system (hereinafter referred to as the system). Test methods and test standards. This section applies to off-grid and grid-connected systems for wind power and photovoltaic hybrids, and the sweeping area of the wind turbine is less than.200m2 and the output is electric. A wind power generation system or a wind-solar hybrid power generation system with a voltage lower than 1000V AC or 1500V DC.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 9535 Ground Crystalline Silicon Photovoltaic Module Design Identification and Staging GB/T 17646 small wind turbine GB/T 19068.2 Small wind turbines - Part 2. Test methods GB/T 19068.3 Small wind turbines - Part 3. Wind tunnel test method GB/T 19115.1 Wind and solar hybrid power generation system Part 1. Technical conditions GB/T 20321.2 Inverter for off-grid wind and solar power systems - Part 2. Test methods GB/T 22473 lead storage battery for energy storage GB/T 30427 grid-connected photovoltaic power generation special inverter technical requirements and test methods GB/T 34521 controller for small wind turbines

3 Terms and definitions

The terms and definitions defined in GB/T 17646 and GB/T 19115.1 apply to this document.

4 Test purposes

Detect and verify main components such as wind turbines, photovoltaic arrays, wind and solar hybrid controllers, off-grid inverters, grid-connected inverters and batteries The quality of the products that make up the wind-solar hybrid power generation system.

5 Wind and solar hybrid power generation system test conditions

The environmental conditions of the system test shall meet the following requirements. a) the altitude does not exceed 1000m; b) Ambient temperature. indoor temperature. 25 °C ± 5 °C; outdoor temperature. 0 °C ~ 40 °C; c) The relative humidity is not more than 90%.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 19115.2-2018_English be delivered?

Answer: Upon your order, we will start to translate GB/T 19115.2-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 19115.2-2018_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 19115.2-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 19115.2-2018?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 19115.2-2018 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.