HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 18993.2-2020 English PDF

US$359.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 18993.2-2020: (Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Hot and Cold Water - Part 2: Pipes)
Status: Valid

GB/T 18993.2: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 18993.2-2020English359 Add to Cart 4 days [Need to translate] (Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Hot and Cold Water - Part 2: Pipes) Valid GB/T 18993.2-2020
GB/T 18993.2-2003English439 Add to Cart 3 days [Need to translate] Chlorinated poly (vinyl chloride) piping systems for hot and cold-water installations -- Part 2: Pipes Obsolete GB/T 18993.2-2003

PDF similar to GB/T 18993.2-2020


Standard similar to GB/T 18993.2-2020

GB/T 19472.1   GB/T 19472.2   GB/T 21302   GB/T 18998.1   GB/T 18993.5   GB/T 18993.1   

Basic data

Standard ID GB/T 18993.2-2020 (GB/T18993.2-2020)
Description (Translated English) (Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Hot and Cold Water - Part 2: Pipes)
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard G33
Word Count Estimation 19,157
Date of Issue 2020-11-19
Date of Implementation 2021-06-01
Older Standard (superseded by this standard) GB/T 18993.2-2003
Regulation (derived from) National Standard Announcement No. 26 of 2020
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 18993.2-2020: (Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Hot and Cold Water - Part 2: Pipes)


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Hot and Cold Water Part 2.Pipes) ICS 83.140.30 G33 National Standards of People's Republic of China Replace GB/T 18993.2-2003 Chlorinated polyvinyl chloride (PVC-C) piping system for hot and cold water Part 2.Tubing Released on 2020-11-19 Implemented on 2021-06-01 State Administration for Market Regulation Issued by the National Standardization Management Committee

Foreword

GB/T 18993 "Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Hot and Cold Water" is divided into 5 parts. ---Part 1.General Provisions; ---Part 2.Pipes; ---Part 3.Pipe fittings; ---Part 4.Valve; ---Part 5.System applicability. This part is Part 2 of GB/T 18993. This section was drafted in accordance with the rules given in GB/T 1.1-2009. This part replaces GB/T 18993.2-2003 "Chlorinated polyvinyl chloride (PVC-C) piping system for cold and hot water Part 2.Pipes", Compared with GB/T 18993.2-2003, the main technical content changes are as follows. ---Modified the scope (see Chapter 1, Chapter 1 of the.2003 edition); ---Updated normative references (see Chapter 2, Chapter 2 of the.2003 edition); ---Modified terms and definitions, symbols and abbreviations (see Chapter 3, Chapter 3 of the.2003 edition); ---Added the requirements for adhesives (see 4.3); --- Deleted the product classification (see Chapter 5 of the.2003 edition); ---Added the method of calculating the design stress σD and tube series S under other temperature-time combined conditions (see Chapter 5); ---Modified the color requirements (see 6.1, 7.1 of the.2003 edition); ---Modified the requirements of appearance (see 6.2, 7.2 of the.2003 edition); --- Deleted the minimum wall thickness with "*" in dn20 and dn25 (see 7.4.1 of the.2003 edition); --- Deleted the requirement of the wall thickness deviation of the same section (see 7.4.4 of the.2003 edition); ---Added the requirement of curvature (see 6.3.5); ---Modified the requirements of opacity (see 6.5, 7.3 of the.2003 edition); --- Deleted the specific content of the system suitability test (see 7.8 in the.2003 edition); ---Inspection classification has been added (see 9.1); --- Modify "Qualified Quality Level 6.5 Inspection" to "Acceptance Quality Limit (AQL) 4.0" (see 9.4.2, 9.4.2 of the.2003 edition); --- Modified the requirements for type inspection (see 9.5, 9.5 in the.2003 edition); ---Modified the judgment rules (see 9.6, 9.6 in the.2003 edition); ---Modified the content of the logo (see 10.1, 10.1 in the.2003 edition); ---Modified the content of the package (see 10.2, 10.2 in the.2003 edition); ---Added an informative appendix "The derivation of the maximum calculated value Scalc, max and wall thickness of the pipe series" (see Appendix C). This part uses the redrafting method to modify and adopt ISO 15877-2.2009 "Plastic piping system for cold and hot water. Chlorinated polyvinyl chloride (PVC-C) Part 2.Pipes". Compared with ISO 15877-2.2009, this part has more structural adjustments. Appendix A lists this part and ISO 15877- 2..2009 chapter number comparison list. Compared with ISO 15877-2.2009, this part has technical differences, and the clauses related to these differences have been passed on the outer margins. The vertical single line (|) of the position is marked, and a list of the corresponding technical differences and their reasons is given in Appendix B. This section has made the following editorial changes. --- Amend the standard name to "Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Cold and Hot Water Part 2.Pipes". Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents. This part was proposed by the China National Light Industry Council. This part is under the jurisdiction of the National Plastic Products Standardization Technical Committee (SAC/TC48). Drafting organizations of this section. Guangdong Liansu Technology Industrial Co., Ltd., Zhongshan Huanyu Industrial Co., Ltd., Yonggao Co., Ltd., Youli Control Group Co., Ltd., Fujian Yatong New Material Technology Co., Ltd., Nansu Building Materials and Plastic Products (Shenzhen) Co., Ltd., Fujian Jiyou Plastic Materials Co., Ltd., Zhejiang Zhongcai Pipeline Technology Co., Ltd., Kangtai Plastic Technology Group Co., Ltd., Xinjiang Tianye (Group) Co., Ltd., Shandong Xiangsheng New Material Technology Co., Ltd. The main drafters of this section. Li Tongyi, Zeng Zhenguo, Huang Jian, Xiao Yugang, Chen Xiaomei, Wang Wenbi, Lin Zhanghong, Wang Baiti, Zhang Shuangquan, Song Xiaoling, Guo Tao. The previous versions of the standards replaced by this part are as follows. ---GB/T 18993.2-2003. Chlorinated polyvinyl chloride (PVC-C) piping system for hot and cold water Part 2.Tubing

1 Scope

This part of GB/T 18993 stipulates that chlorinated polyvinyl chloride (PVC-C) resin is used as the main raw material and used for hot and cold water after extrusion. Chlorinated polyvinyl chloride pipes (hereinafter referred to as pipes) terms, definitions, symbols and abbreviations, materials, selection, requirements, and systems of S value of pipe series Applicability test, test methods, inspection rules and signs, packaging, transportation and storage. This part and other parts of GB/T 18993 are applicable to chlorinated polyvinyl chloride (PVC-C) piping systems for building hot and cold water. Note. It is the responsibility of the purchaser to select this product appropriately according to its specific application requirements, combined with relevant regulations, standards or specifications.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 1033.1 Determination of the density of plastic non-foam plastics Part 1.Immersion method, liquid pycnometer method and titration method (GB/T 1033.1-2008, ISO 1183-1.2004, IDT) GB/T 2828.1 Sampling inspection procedure by attributes Part 1.Batch inspection sampling plan retrieved by acceptance quality limit (AQL) (GB/T 2828.1-2012, ISO 2859-1.1999, IDT) GB/T 2918 Standard environment for condition adjustment and testing of plastic specimens (GB/T 2918-2018, ISO 291.2008, MOD) GB/T 6111-2018 Determination of internal pressure resistance of thermoplastic piping systems for fluid transportation (ISO 1167-1.2006; ISO 1167-2..2006; ISO 1167-3..2007; ISO 1167-4;.2007, NEQ) GB/T 6671 Thermoplastic pipe longitudinal shrinkage determination (GB/T 6671-2001, eqvISO 2505.1994) Determination of the Vicat softening temperature of GB/T 8802 thermoplastic pipes and fittings (GB/T 8802-2001, eqvISO 2507.1995) GB/T 8804.1 Determination of the tensile properties of thermoplastic pipes Part 1.General test methods (GB/T 8804.1-2003, ISO 6295-1.1997, IDT) GB/T 8804.2 Determination of tensile properties of thermoplastic pipes Part 2.Unplasticized polyvinyl chloride (PVC-U), chlorinated polyvinyl chloride (PVC-C) and high impact polyvinyl chloride (PVC.HI) pipes (GB/T 8804.2-2003, ISO 6295-2.1997, IDT) GB/T 8806 Plastic piping system plastic parts size determination (GB/T 8806-2008, ISO 3126.2005, IDT) GB/T 14152 Thermoplastic pipe resistance test method for external impact resistance. Hour hand rotation method (GB/T 14152-2001, eqv ISO 3127.1994) GB/T 17219 Safety evaluation standard for drinking water distribution equipment and protective materials GB/T 18252 Plastic piping systems use extrapolation to determine the long-term hydrostatic strength of thermoplastic materials in the form of pipes (GB/T 18252-2020, ISO 9080.2012, IDT) GB/T 18993.1-2020 Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Hot and Cold Water Part 1.General (ISO 15877-1.2009, MOD) GB/T 18993.3-2020 Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Hot and Cold Water Part 3.Pipe Fittings (ISO 15877-3.2009, MOD) GB/T 18993.5-2020 Chlorinated Polyvinyl Chloride (PVC-C) Piping System for Hot and Cold Water Part 5.System Applicability

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 18993.2-2020_English be delivered?

Answer: Upon your order, we will start to translate GB/T 18993.2-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 18993.2-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 18993.2-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 18993.2-2020?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 18993.2-2020 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.