US$279.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 18522.6-2007: General specification for hydrometric instrument -- Part 6: Inspection regulation, mark, package, transportation, storage and operation manual Status: Obsolete
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 18522.6-2007 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
General specification for hydrometric instrument -- Part 6: Inspection regulation, mark, package, transportation, storage and operation manual
| Obsolete |
GB/T 18522.6-2007
|
Standard similar to GB/T 18522.6-2007 GB/T 11828.4 GB/T 11828.2 GB/T 41184.1
Basic data Standard ID | GB/T 18522.6-2007 (GB/T18522.6-2007) | Description (Translated English) | General specification for hydrometric instrument -- Part 6: Inspection regulation, mark, package, transportation, storage and operation manual | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | N93 | Classification of International Standard | 07.060 | Word Count Estimation | 7,711 | Date of Issue | 2007-12-24 | Date of Implementation | 2008-03-01 | Older Standard (superseded by this standard) | GB/T 9359.8-1988 | Quoted Standard | GB 190; GB/T 191; GB/T 788; GB 9969.1 | Regulation (derived from) | China Announcement of Newly Approved National Standards No. 13 of 2007 (No. 113 overall) | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the inspection rules hydrological instruments and product labeling, packaging, transportation, storage, use manual basic requirements. This section applies to all types of hydrological instruments. |
GB/T 18522.6-2007: General specification for hydrometric instrument -- Part 6: Inspection regulation, mark, package, transportation, storage and operation manual ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General specification for hydrometric instrument Part 6. Inspection regulation, mark, package, transportation, storage and operation manual
ICS 07.060
N93
National Standards of People's Republic of China
Replacing GB/T 9359.8-1988
Hydrologic instruments - Part 6. Inspection Rules and
Signs, packaging, transportation, storage and operation manual
Posted 2007-12-24
2008-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
GB/T 18522 "Hydrologic General Instrument" is divided into six parts.
--- Part 1. General;
--- Part 2. Reference operating conditions;
--- Part 3. Basic performance and methods;
--- Part 4. Basic requirements of structure;
--- Part 5. Test methods and working conditions influence;
--- Part 6. inspection rules and signs, packaging, transportation, storage and operation manual.
This part of GB/T 18522 Part 6, is GB/T 9359.8-1988 "hydrologic instruments - Test regulation
Signs, packaging, transportation and storage, "the amendment. Compared with GB/T 9359.8-1988 main changes are as follows.
--- Increased product sampling requirements (4.2.3) in the inspection rules, making the standard more operational;
--- For product eligibility determination, complement the relevant provisions (4.2.4.2);
--- The product logo and packaging, according to the characteristics of hydrological instruments, increasing the packaging (5.2.1) and packaging (5.2.2) distinction;
--- The product logo, an increase of about random file on the product or packaging should indicate the product's license number that identifies the
Demand (5.3);
--- Increasing the product manual chapter about the content (Chapter 9).
This section proposed by the People's Republic of China Ministry of Water Resources.
This part of the National Technical Committee of Standardization Technical Committee Instruments Hydrology Hydrology focal point.
This part mainly drafted by. MWR hydrological instruments and geotechnical engineering Instrument Quality Supervision and Testing Center, Nanjing Auto Hydrological
The Institute.
Participated in the drafting of this section. Taiyuan Polytechnic Tiancheng Technology Co., Ltd., Beijing Science and Technology Co., Ltd. Micro Mart.
The main drafters of this section. Mr Namin, Lu Xu, Xu Haifeng, the former Kim Yong, Zhang Cheng, Jiangzhao Hong, Lu Weijia, Xue Yonghui.
The drafters of some of the participants. He Xiaogang, Zou Yongjun.
This part of the standard replaces the previous editions are.
--- GB/T 9359.8-1988.
Hydrologic instruments - Part 6. Inspection Rules and
Signs, packaging, transportation, storage and operation manual
1 Scope
This section GB/T 18522 specifies the hydrological instrument inspection rules (including the sampling method, qualified to determine the basic rules) and product
Signs, packaging, transportation, storage and use of the basic requirements of the specification.
This section applies to all types of hydrological instruments.
2 Normative references
The following documents contain provisions which, through reference GB/T 18522 in this section constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB 190 packaging and marking of dangerous goods
GB/T 191 Packaging - Pictorial signs
GB/T 788 books and magazine format size and format
GB 9969.1 Instructions General Industrial Products
GB/T 13264 percent nonconforming small lot sampling inspection procedures and sample forms
GB/T 15464 instrumentation packaging technology
GB/T 18185-2000 hydrological instruments reliability technical requirements
GB/T 19677 Terms and symbols for hydrological Instruments
3 Terms and Definitions
Terms and definitions GB/T 19677 apply to established GB/T 18522 in this section.
4 test rules
4.1 factory inspection
4.1.1 General by the production units of product quality inspection department of factory inspection, factory inspection should be individually tested passed the test product
And after the issuance of the certificate, the factory side to allow sales.
4.1.2 factory inspection items generally have the appearance of quality, safety inspection and assessment of the major technical indicators, the basic function tests, complete sets of products
Inspection.
4.1.3 Specific technical standards for each category of products in the factory inspection, factory inspection should be developed in accordance with this standard project, requirements and methods, and
The corresponding provisions of decision rules.
4.1.4 Where there are factory inspection failure, should be reworked until the inspection.
4.2 Type inspection
4.2.1 Type test is the product of the entire performance testing, test items should cover their product standards all technical terms.
4.2.2 When one of the following conditions, type of inspection should be carried out.
a) a new product technologies (amorphous) product identification or technological achievements (project) identified before;
b) After the trial production of new products or old products to the plant;
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18522.6-2007_English be delivered?Answer: Upon your order, we will start to translate GB/T 18522.6-2007_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 18522.6-2007_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18522.6-2007_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|