|
US$739.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17386-2009: Sizing and selection of electric submersible pump installations Status: Valid GB/T 17386: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 17386-2009 | English | 739 |
Add to Cart
|
6 days [Need to translate]
|
Sizing and selection of electric submersible pump installations
| Valid |
GB/T 17386-2009
|
| GB/T 17386-1998 | English | RFQ |
ASK
|
11 days [Need to translate]
|
Recommended practice for sizing and selection of electric submersible pump installations
| Obsolete |
GB/T 17386-1998
|
PDF similar to GB/T 17386-2009
Basic data | Standard ID | GB/T 17386-2009 (GB/T17386-2009) | | Description (Translated English) | Sizing and selection of electric submersible pump installations | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | E92 | | Classification of International Standard | 75.180.10 | | Word Count Estimation | 32,356 | | Date of Issue | 2009-04-02 | | Date of Implementation | 2010-01-01 | | Older Standard (superseded by this standard) | GB/T 17386-1998 | | Adopted Standard | API RP 11S4-2002, MOD | | Regulation (derived from) | National Standard Approval Announcement 2009 No.4 (Total No.144) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard provides detailed steps submersible pump specifications optional. And the basic design process. This standard applies to oil and (or) means water production wells, the equipment installed in the bottom of the tubing. |
GB/T 17386-2009: Sizing and selection of electric submersible pump installations---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Sizing and selection of electric submersible pump installations
ICS 75.180.10
E92
National Standards of People's Republic of China
Replacing GB/T 17386-1998
Specifications submersible pump unit selection
Posted 2009-04-02
2010-01-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 symbols, abbreviations and terms of 1
4 Basic Design Flow 2
5 to collect basic data 3
6 Select the pump and the suction port 4
7 Select motor 5
8 Select Protector 6
9 Select Cable 8
10 Select Control cabinet/inverter and transformer 9
Auxiliary equipment 11 12
12 selected pump Example 13
Appendix A (informative) This standard reg number and APIRP11S4.2002 reg control number 15
Annex B (informative) submersible pump design information card 17
Annex C (informative) Data Card Note 19
Annex D (normative appendix) API tubing friction losses 23
Compare Appendix E (normative) submersible motor and the motor ground 24
Annex F (informative) variable transmission similar to Law 25
Foreword
This revised standard adopts APIRP11S4.2002 "submersible pump device specification and selection of recommended practices" (third edition) (English).
This standard is based on APIRP11S4. redrafted 2002. Listed in Appendix A of this standard and APIRP11S4.2002 reg
Control list numbered.
Taking into account China's national conditions, the use APIRP11S4.2002, the standard of this made some changes, the relevant technical differences have been incorporated into the present
Standard text, the main technical differences are as follows.
--- According to APIRP11S4.2002 were applied to the content of the normative references were deleted;
--- APIRP11S4. foreign standards referenced in 2002, has been adopted as the country with the national standards or industry standard in place of the corresponding
Foreign standards;
--- In the symbols and abbreviations, increasing the volume of surface water, ground oil volume, the rated motor voltage, motor rated current, cable voltage drop
Loss of Content;
--- "ESP" to "submersible pump", "control panel" to "control panel", "External extension of cable" to "connection cable";
--- An increase in pump selection metric calculation example;
--- Increase the informative appendix "The standard reg number and APIRP11S4.2002 reg number control" (see Appendix A).
For ease of use, this standard APIRP11S4.2002 also made the following editorial changes.
The term --- the "recommended practices" to "this standard";
--- According to Chinese customary for some formatting has been modified;
--- Removed APIRP11S4.2002 "special statement" and "Introduction";
--- APIRP11S4.2002's 3.2 "1kPa (g) = 6.894757psi (g)" conversion is wrong, so change it
"1kPa (g) = 0.145038psi (g)".
This standard replaces GB/T 17386-1998 "submersible pump equipment specifications and selection", compared with the GB/T 17386-1998, the main
Changes are as follows.
--- Increasing system design process more accurate and efficient computer selected pump;
--- Reduced, for example, increasing the recital;
--- Each member adds "proofreading List";
--- Increase the informative appendix "The standard reg number and APIRP11S4.2002 reg number control" (see Appendix A), Information
Appendix "submersible pump design profile card" (see Appendix B), informative annex "Information note cards" (see Appendix C), informative
Appendix "submersible motor and the motor ground contrast" (see Appendix E) and information appendix "variable transmission similar rule" (see Appendix
F);
--- Deleted "submersible pump member Notes" section;
--- Remove the "cable drop loss", "liquid flow rate through the motor surface" and other projects a graph;
--- Deleted "Well Data Sheet";
--- Remove the "pump and system size selection";
--- Delete the original standard in Appendix A "graph using the unit of measure conversion table";
--- Increasing the accessories, such as. shields, centralizer, Y-type tools, cables and other devices through;
--- Modify the application limits and influencing factors of individual components.
Appendix D of this standard is a normative appendix, Appendix A, Appendix B, Appendix C, Annex E and Annex F are informative appendices.
This standard by the national oil drilling equipment and tools for Standardization Technical Committee (SAC/TC96) and focal points.
This standard was drafted. Daqing Oilfield Lishen Pump Co., Ltd., Shengli pump limited liability company, Dagang oil Tian Zhongcheng Machine
Mechanical Manufacturing Co., Ltd.
The main drafters of this standard. Shao real, Mengxian Jun, Wang Wei, Yan Hongwen, Zhang Lixin, Wu Jihua, Ganyu Tao, Wang Weijun, Chen Hong.
This standard replaces the standards previously issued as follows.
--- GB/T 17386-1998.
Specifications submersible pump unit selection
1 Scope
This standard specifies the output at a predetermined and well conditions, detailed steps submersible pump selection specifications, as well as the basic design process.
This standard applies to oil and (or) means water production wells, the equipment installed in the bottom of the tubing.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 17388 installation of electric submersible pump unit (GB/T 17388-1998, idtAPIRP11S3.1993)
GB/T 17389 submersible pump cable system application (GB/T 17389-1998, idtAPIRP11S5.1993)
GB/T 18050 submersible pump cable test methods (GB/T 18050-2000, idtAPIRP11S6.1995)
SY/T 6599 centrifugal submersible pump test method (SY/T 6599-2004, APIRP11S2.1997, IDT)
3 Symbols, Abbreviations and Conversions
3.1 Symbols and abbreviations
The following symbols and abbreviations apply to this standard.
B capacity transformer, kVA
Bo crude oil formation volume factor, m3/m3 (bbl/STB)
Bw water formation volume factor, m3/m3 (bbl/STB)
HD from the wellhead to the (underground) fluid level measured vertical hydraulic head, m (ft)
HF pipe friction loss, m (ft)
HT hydraulic pressure head, m (ft)
Rated motor current I, A
J Production Index, (m3/d)/MPa ((bbl/d)/psi)
Found MDpump pump setting depth (measured at the entrance to the pumping installation depth), m (ft)
PIP pump suction port pressure, MPa (psi)
Pbhs bottomhole static pressure, MPa (psi)
Pwf wellbore flowing pressure, MPa (psi)
Pwh wellhead flowing pressure, MPa (psi)
Q well fluids into the wellbore a predetermined flow rate, m3/d (bbl/d)
Q intake pump suction flow, m3/d (bbl/d)
SCF Standard cubic feet, ft3
SSU Saybolt Seconds Universal viscosity
STB tank volume, m3 (bbl)
TDH pump the liquid at a certain ratio desired total dynamic head, m (ft)
U rated motor voltage, V
ΔU cable drop loss, V
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17386-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 17386-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 17386-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17386-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 17386-2009?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 17386-2009 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|