Model acceptance tests of hydraulic turbines, storage pumps and pump-turbine -- Part 3: Additional performance test
| Obsolete |
GB/T 15613.3-2008
|
PDF similar to GB/T 15613.3-2008
Basic data | Standard ID | GB/T 15613.3-2008 (GB/T15613.3-2008) | | Description (Translated English) | Model acceptance tests of hydraulic turbines, storage pumps and pump-turbine -- Part 3: Additional performance test | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K55 | | Classification of International Standard | 27.140 | | Word Count Estimation | 47,423 | | Date of Issue | 2008-06-30 | | Date of Implementation | 2009-04-01 | | Quoted Standard | GB/T 15613.1; GB/T 15613.2; GB/T 2900.45-2006; GB/T 20043-2005; GB/T 17189-2007; ISO 31-3-1992 | | Adopted Standard | IEC 60193-1999, NEQ | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 11 of 2008 (No. 124 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard applies to the laboratory tests under the conditions of the various types of impact and counter -type turbines, storage pumps or pump turbine. This section applies to the unit power is greater than 10MW or greater than the nominal diameter of 3. 3m corresponding to a prototype model. If this part of the steps required to completely power applied to the unit or smaller diameter turbine, in general, is not appropriate, but if the agreement between the recognition of this section may be used. In this section, the term " turbine " includes means for operating the turbine pump turbine, the term " pump " includes pump means for running pump turbine. |
GB/T 15613.3-2008: Model acceptance tests of hydraulic turbines, storage pumps and pump-turbine -- Part 3: Additional performance test ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Model acceptance tests of hydraulic turbines, storage pumps and pump-turbine Part 3. Additional performance test
ICS 27.140
K55
National Standards of People's Republic of China
Turbines, storage pumps and pump turbine model
Acceptance tests Part III. Additional performance test
(IEC 60193.1999, NEQ)
Posted 2008-06-30
2009-04-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
1.1 Scope 1
1.2 Objective 1
2 Normative references 1
3 Terms, definitions, symbols and units 1
3.1 General 1
Unit 2 3.2
3.3 Terms, definitions, symbols and units Table 2
Example 4 Test 2
4.1 Test Data Measurements 2
4.2 pulsation measurement data acquisition and data processing 4
5 Measurement methods and results 6
5.1 pressure pulsation 6
5.2 spindle torque ripple 16
5.3 Axial and radial forces 17
5.4 hydraulic loading control mechanism part 23
33 5.5 Test run within the scope of expansion carried out
Index about 5.6 prototype test differential pressure measurement 37
The natural frequency of Appendix A (informative) tail pipe body of water 39
Annex B (informative) References 41
Annex C (informative) of this section with IEC 60193.1999 technical differences and their reasons 42
Foreword
GB/T 15613 "turbines, storage pumps and pump turbine model acceptance tests" is divided into three parts.
GB/T 15613.1 Part 1. General requirements;
GB/T 15613.2 Part II. conventional hydraulic performance tests;
GB/T 15613.3 Part III. Additional performance test.
This section series of standards GB/T Part 315 613, which corresponds to IEC 60193.1999 "turbines, storage pumps and pump turbine
Machine Model Acceptance Test "in Chapter IV. This part of IEC 60193.1999 is not equivalent degree of consistency, the main differences are as follows.
--- According to GB/T 1.1-2000 requirements, and for writing the format has been modified;
. "" --- With a decimal point instead of a comma as the decimal point;
--- The Normative contents of the file have been adjusted, and the original IEC standard has a corresponding national standards herein are replaced;
Introductory phrase --- Chapter 3 of GB/T 1.1-2000 requirements had been revised;
--- In order to ensure the integrity of the standard IEC 60193 are summarized in Chapter 1 General Provisions related content, regulate the formation of Chapter 1, "scope", 2nd
Chapter "Normative references", Chapter 3, "Terms, definitions, symbols and units."
--- For reg structure has been appropriately adjusted, 4.1 and 4.2 content will be merged into Chapter 4, "conduct of the trial", together content from 4.3 to 4.8
Chapter 5, "Measurement methods and results."
--- Reason for power plant units in the actual operation of tail water level changes, increasing the pressure pulsation becomes empty coefficient of correlation test
content.
--- Draft Tube natural frequency of physical theories related complex, currently under investigation, it will be 5.1.7.4 "tail pipe water
The natural frequency of "out from the body, as Appendix A, as an information appendix.
For technical differences in terms of which they are involved in the margin of a single vertical line identified by. These techniques are given in Appendix C
List of differences and the reasons for the reference.
This section in Appendix A, Appendix B and Appendix C are informative appendix.
This part is proposed by the China Electrical Equipment Industrial Association.
This part of the National Standardization Technical Committee turbine (SAC/TC175) centralized.
This section drafted by. China Institute of Water Resources and Hydropower, Dongfang Electrical Machinery Co., Ltd., Harbin Institute of Electronics
The main drafters of this section. Pan Luoping, Wen Guozhen, Zhao Yue, Tan Daqing, Meng Chao, Hu Jiang Yi
Turbines, storage pumps and pump turbine model
Acceptance tests Part III. Additional performance test
1 Scope
1.1 Scope
This section applies to all types of impact and counter-turbine under laboratory conditions tested, storage pumps or water pumps
Turbines.
This section applies to the unit power greater than 10MW or greater than the nominal diameter of 3.3m corresponding to the prototype model. As will this section
Step provisions fully applicable to the unit power or smaller diameter turbine, in general, is not appropriate, but if the agreement between the recognition,
This section can also be used.
In this section, the term "turbine" includes for Turbines run the pump turbine, the term "pump" includes to a pump run
Pump turbine.
In addition to matters related to the trial must be outside, this section does not include matters purely commercial interests 1.
As long as structural or mechanical components does not affect the performance or the relationship model between model and prototype, this section involves neither mechanical details
Fine structure, does not involve the mechanical properties of the mechanical parts.
1.2 Purpose
The main purpose of this section is to assist performance data obtained through model-assisted performance tests can be used as a prototype design or prototype operation prediction
Guide lines.
This section also applies to the other purpose of the model tests, such as testing and comparison of research and development work.
If the model has been completed acceptance tests, field trials may be limited to index test (see GB/T 20043, Chapter 8)
2 Normative references
The following documents contain provisions which, through GB/T 15613 reference in this text, constitute provisions of this part. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 15613.1 turbines, storage pumps and pump turbine model acceptance tests Part 1. General provisions (GB/T 15613.1-
2008, IEC 60193.1999, NEQ)
GB/T 15613.2 turbines, storage pumps and pump turbine model acceptance tests Part II. General hydraulic performance
(GB/T 15613.2-2008, IEC 60193.1999, NEQ)
GB/T 2900.45-2006 Electrotechnical terminology Hydropower Plant Equipment (IEC /T R61364.1999, MOD)
GB/T 20043-2005 turbines, storage pumps and pump turbine hydraulic performance site acceptance test procedures (IEC 60041.1991,
MOD)
GB/T 17189-2007 hydraulic machines (turbines, storage pumps and pump turbines) and pulsating vibration field test procedures
ISO 31-3.1992 Quantities and Units - Part 3. Mechanical
3 Terms, definitions, symbols and units
3.1 General
This section uses GB/T 15613.1 in general terms, definitions, symbols and units, special terms will be given in the event of the interpretation.
|