|
US$719.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 15408-2011: Technical requirement of power-supply for security and protection system Status: Valid GB/T 15408: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 15408-2011 | English | 719 |
Add to Cart
|
6 days [Need to translate]
|
Technical requirement of power-supply for security and protection system
| Valid |
GB/T 15408-2011
|
| GB/T 15408-1994 | English | 239 |
Add to Cart
|
3 days [Need to translate]
|
Alarm system power unils, test methods and performance criteria
| Obsolete |
GB/T 15408-1994
|
PDF similar to GB/T 15408-2011
Basic data | Standard ID | GB/T 15408-2011 (GB/T15408-2011) | | Description (Translated English) | Technical requirement of power-supply for security and protection system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | A91 | | Classification of International Standard | 13.310 | | Word Count Estimation | 31,323 | | Date of Issue | 2011-06-16 | | Date of Implementation | 2011-12-01 | | Older Standard (superseded by this standard) | GB/T 15408-1994 | | Quoted Standard | GB 4208-2008; GB 4943-2001; GB 8702; GB/T 14549; GB/T 15211; GB 17625.1; GB/Z 17625.6; GB/T 17626.2-2006; GB/T 17626.3-2006; GB/T 17626.4-2008; GB/T 17626.5-2008; GB/T 17626.6-2008; GB/T 17626.11-2008; GB 50057; GB 50343; GBA/T 670; JGJ 16-2008; GB 50348 | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 9 of 2011 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the security system technical requirements of power supply is powered systems security system design, equipment selection, installation and construction, testing and acceptance of the fundamental basis. This standard applies to security (hereinafter referred to as security) system power supply design, installation, construction, testing and acceptance. |
GB/T 15408-2011: Technical requirement of power-supply for security and protection system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirement of power-supply for security
ICS 13.310
A91
National Standards of People's Republic of China
Replacing GB/T 15408-1994
Security system supply technical requirements
forsecurity
Issued on. 2011-06-16
2011-12-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms, Definitions and Abbreviations 1
3.1 Terms and definitions
3.2 Abbreviations 2
4 security system, power supply system constituted 2
4.1 overall composition 2
4.2 power supply system power mode 3
5 Power Supply System Requirements 4
5.1 Basic requirements 4
5.2 Main Power Requirements 5
5.3 Standby Power Requirements 5
5.4 power supply protection requirements 6
5.5 8 power distribution and transfer requirements
Power transmission requirements 8 5.6
5.7 Power Control Center configuration requirements 9
5.8 security systems equipment distribution requirements 9
Intrusion Alarm System 5.9 power requirements 9
5.10 video monitoring subsystem power requirements 9
5.11 access control subsystem power requirements 10
5.12 Other subsystem power requirements 10
6 power supply system security, reliability, electromagnetic compatibility and environmental adaptability requirements 11
Security System 6.1 power requirements 11
The reliability of the power supply system of claim 12 6.2
Electromagnetic Compatibility 12 6.3 Power Supply System Requirements
6.4 Power Supply System of claim 13 environmental adaptability
7 lightning protection and grounding requirements 13
8 power supply system identification, monitoring and control, energy efficiency and environmental management requirements 14
8.1 Marking Requirements 14
8.2 Operating instructions claim 14
8.3 monitor and control the power supply system management requirements 14
8.4 powered device energy efficiency and environmental requirements 15
8.5 Load Requirements 15
9 power supply equipment and power supply cable selection and installation requirements 16
9.1-powered equipment selection principles 16
9.2 Common Power Equipment Selection configuration requirements 16
9.3 Selection and installation of power cables requirements 17
9.4 power supply equipment installation requirements 18
Testing and acceptance requirements of the power supply system 10 18
Appendix A (informative) security system power consumption calculation method of example 19
Annex B (informative) Common AC-DC converter specifications, calculations lead safe current carrying capacity of 21
Annex C (informative) AC power supply, uninterruptible power supply (UPS) main technical indicators 22
Calculation Appendix D (informative) line drop 24
1 power supply system block diagram of Figure 3
Figure 2 a block diagram of centralized power supply mode 4
3 local utility grid power supply mode Box 4
4 independent power mode Typical Scheme 4
Table 1 common load power supply protection mode 6
Table 2 common main power supply and standby power supply mode combinations 7
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard is GB/T 15408-1994 "Alarm system power units, test methods and performance criteria," the revised and standard name
Changed to "security system power supply technology requirements."
This standard compared with GB/T 15408-1994, the main technical changes are as follows.
--- Alarm system power units to expand the power supply system for the security system, the power supply performance requirements, expand security
Performance of the system power supply system requirements, configuration requirements of the principle of comprehensive, system management, power supply equipment installation requirements (see
GB/T 15408-1994, Chapter 5, Chapter 6, Chapter 7, Chapter 8, Chapter 9);
--- Clear interface with the power supply system and the relationship between the city grid (see 5.2.3,5.2.4);
--- Clear security system power supply protection requirements (see 5.4);
--- Clear each subsystem power requirements (see 5.9,5.10,5.11,5.12);
--- Clearly safety, electromagnetic compatibility requirements (see 6.1, 6.3);
--- Increase energy efficiency, environmental protection and other requirements (see 8.4,8.5,6.4.2,6.3.2);
--- Increased interface with the relationship between the content supply device and the load (see 9.1.3,9.1.4);
--- Clear security systems powered equipment selection requirements (see Chapter 9);
--- Increase the number of informative annex (see Appendix A, Appendix B, Appendix C, Appendix D).
Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents.
The standard proposed by the People's Republic of China Ministry of Public Security.
This standard by the National Security Alarm System Standardization Technical Committee (SAC/TC100) centralized.
This standard was drafted. Beijing in the security shield technology development company, Beijing Univision Aegis Security Technology Co., Ltd., the Ministry of Public Security Police
Electronic Products Quality Inspection Center, Ministry of Public Security First Research Institute of China Building Standard Design and Research Institute, Guangdong Zhicheng Champion Group Co., Ltd.
The main drafters of this standard. Yang Guosheng, Li Xiulin, Jin Wei, Sun Lan, Li Minying.
This standard replaces the standards previously issued as follows.
--- GB/T 15408-1994.
Security system supply technical requirements
1 Scope
This standard specifies the security requirements of the system power supply technology, the security system power supply system design, equipment selection, installation
The fundamental basis for the construction, testing and acceptance.
This standard applies to security (hereinafter referred to as security) system power supply design, installation, testing and acceptance.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 4208-2008 shell protection (IP code)
GB 4943-2001 Safety of information technology equipment
GB 8702 electromagnetic radiation protection
GB/T 14549 Power quality utility grid harmonic
GB/T 15211 alarm system environmental testing
GB 17625.1 Electromagnetic Compatibility Limits for harmonic current emissions (equipment input current ≤16A)
GB /Z17625.6 harmonic electromagnetic compatibility limits rated current greater than 16A devices in low-voltage power supply systems
Limit flow
GB/T 17626.2-2006 Electromagnetic compatibility - Testing and measurement techniques - Electrostatic discharge immunity test
GB/T 17626.3-2006 Electromagnetic compatibility - Testing and measurement techniques RFEMS test
GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test
GB/T 17626.5-2008 Electromagnetic compatibility - Testing and measurement techniques - Surge (impact) immunity test
GB/T 17626.6-2008 Electromagnetic compatibility - Testing and measurement techniques Immunity to conducted disturbances induced field
GB/T 17626.11-2008 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity
test
GB 50057 Lightning in design
GB 50343 building electronic information system lightning protection technical specifications
GB 50348 security engineering and technical norms
GA/T 670 security systems, lightning surge protection Technical Requirements
JGJ16-2008 civil electrical design specifications
3 Terms, definitions and abbreviations
3.1 Terms and Definitions
JGJ16-2008 define the following terms and definitions apply to this document.
3.1.1
Main power mainpowersupply
Support security systems or equipment fully functioning power source.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 15408-2011_English be delivered?Answer: Upon your order, we will start to translate GB/T 15408-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 15408-2011_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 15408-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 15408-2011?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 15408-2011 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|