|
US$349.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 13467-2013: Measurement and calculation methods of electric energy balance for fan system Status: Valid GB/T 13467: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 13467-2013 | English | 349 |
Add to Cart
|
3 days [Need to translate]
|
Measurement and calculation methods of electric energy balance for fan system
| Valid |
GB/T 13467-2013
|
| GB/T 13467-1992 | English | 479 |
Add to Cart
|
4 days [Need to translate]
|
The methods of electric power balance test and calculation in fan system
| Obsolete |
GB/T 13467-1992
|
PDF similar to GB/T 13467-2013
Basic data | Standard ID | GB/T 13467-2013 (GB/T13467-2013) | | Description (Translated English) | Measurement and calculation methods of electric energy balance for fan system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F01 | | Classification of International Standard | 27.010 | | Word Count Estimation | 15,132 | | Older Standard (superseded by this standard) | GB/T 13467-1992 | | Quoted Standard | GB/T 1032; GB/T 8222; GB/T 10178-2006; GB/T 12497; GB/T 13466; GB/T 15913-2009 | | Regulation (derived from) | National Standards Bulletin No. 26 of 2013 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the fan system power balance test and calculation related terms, definitions and symbols, determine the system boundaries, testing requirements, computing power utilization, operational efficiency is determined, and the input power |
GB/T 13467-2013: Measurement and calculation methods of electric energy balance for fan system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Measurement and calculation methods of electric energy balance for fan system
ICS 27.010
F01
National Standards of People's Republic of China
Replacing GB/T 13467-1992
Fan system power balance test and calculation methods
forfansystem
Issued on. 2013-12-18
2014-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms, definitions and symbols 1
4 to determine the system boundary 2
5 3 Test Requirements
6 Energy efficiency calculation 4
7 operating efficiency determined 6
8 fan power system input power and determination 7
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
/ T 13467-1992 "Fan system power balance test and calculation methods" This standard replaces GB , and GB/T 13467-1992 phase
Ratio, in addition to editorial changes outside the main technical changes are as follows.
--- Modify the scope of the standard;
--- Remove the normative references GB 1236, GB 2624, GB 8916, JB2977, new normative references
GB/T 15913, GB/T 1032, GB/T 12497;
--- Delete "effective takeover point", "normal system operating conditions," "common operating conditions", "efficient fan zone" terms, an increase of
"Ventilation system operating efficiency" term;
--- Original Chapter 4, "test site conditions and requirements," Chapter 5, "Measurement items and content" to Chapter 4, "System Boundary indeed
Fixed "and Chapter 5," Testing Requirements ";
--- Original Chapter 6, "Test Method", Chapter 7, "the calculation of energy balance" to Chapter 6, "Calculation of Energy utilization", 7
Chapter "to determine the operating efficiency" and Chapter 8, "ventilation system input power and power is determined."
This standard by the National Standardization Technical Committee for Energy and Management (SAC/TC20) and focal points.
This standard drafting units. China National Institute of Standardization, Shanghai Energy Efficiency Center, Shanghai University of Technology, Guangzhou Zhiguang energy Ltd., Zhejiang
Jiang Elite Fan Co., Ltd., Nantong City Product Quality Supervision, Inspection.
The main drafters of this standard. Xiayu Juan, Li Pengcheng Chen Haihong, Lin Ling, Zhao Yuejin, Pan Chong Chao, Qin Hongbo, Zhao, Tian Jianwei, Zhang Qi-zhong,
Liu Meng Peng Yanyan, Wang Weihong, Qiang to the sword, Bowie, Chen Jianhua.
Fan system power balance test and calculation methods
1 Scope
This standard specifies the ventilation system to determine the power balance test and calculation related terms, definitions and symbols, the system boundary, to test
Requirements, calculate the energy utilization, operating efficiency is determined, as well as to determine the input power and power and so on.
This standard applies to AC electrical drag centrifugal, mixed flow and axial fan system.
This standard does not apply to transportation of materials ventilator system.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 1032 Test Methods for Three-phase asynchronous motor
GB/T 8222 General electrical equipment, energy balance
GB/T 10178-2006 Industrial fans field performance test
GB/T 12497 three-phase asynchronous motor economy
GB/T 13466 AC electric drive fans (pumps, compressors) system principles of economical operation
GB/T 15913-2009 fan unit and distribution tube system energy monitoring
3 Terms, definitions and symbols
3.1 Terms and Definitions
GB/T 13466 and GB/T 10178-2006 define the following terms and definitions apply to this document.
3.1.1
Effective ventilation pressure effectiveventilationpressure
Energy output full ventilation system pressure boundary.
3.1.2
Fan system efficiency efficiencyoffansystem
Output power and input power ratio ventilation system is running.
3.2 Symbol
The following symbols apply to this document.
HJ fan unit power utilization
Kp fan outlet side of the gas compressibility correction factor
KpY ventilation system outlet side of the gas compressibility correction factor
HY Fan system power utilization
PSCK output frequency control device power kW
PSR fan system input power kW
PSRj j-station unit fan input power kW
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 13467-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 13467-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 13467-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 13467-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 13467-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 13467-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|