HOME   Cart(1)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GB/T 11805-2019 English PDF

US$519.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 11805-2019: General specifications of automatic control components (devices) and their related system for hydro-turbine generating sets
Status: Valid

GB/T 11805: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 11805-2019English519 Add to Cart 5 days [Need to translate] General specifications of automatic control components (devices) and their related system for hydro-turbine generating sets Valid GB/T 11805-2019
GB/T 11805-2008English919 Add to Cart 4 days [Need to translate] Basic specifications of automatic control components (devices) and their related system for hydro turbine-generating sets Obsolete GB/T 11805-2008
GB/T 11805-1999English959 Add to Cart 6 days [Need to translate] Basic specifications of automatic control components (devices) and their related system for hydroturbine-generating sets Obsolete GB/T 11805-1999
GB/T 11805-1989EnglishRFQ ASK 3 days [Need to translate] Basic technical requirements for automatic control components and their related systems for large and medium hydrogenerating sets Obsolete GB/T 11805-1989

PDF similar to GB/T 11805-2019


Standard similar to GB/T 11805-2019

GB/T 14478   GB/T 15468   GB/T 14478   GB/T 28572   

Basic data

Standard ID GB/T 11805-2019 (GB/T11805-2019)
Description (Translated English) General specifications of automatic control components (devices) and their related system for hydro-turbine generating sets
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K55
Classification of International Standard 27.140
Word Count Estimation 26,299
Date of Issue 2019-06-04
Date of Implementation 2020-01-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 11805-2019: General specifications of automatic control components (devices) and their related system for hydro-turbine generating sets


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General specifications of automatic control components (devices) and their related system for hydroturbine-generating sets ICS 27.140 K55 National Standards of People's Republic of China Replace GB/T 11805-2008 Hydrogenerator set automation components (devices) Basic technical conditions of its system Published on.2019-06-04 2020-01-01 implementation State market supervision and administration China National Standardization Administration issued

Content

Foreword I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Applicable conditions 3 5 Requirements 4 6 sampling 10 7 Test method 11 8 Inspection and acceptance rules 19 9 Marking, packaging, transportation and storage 20 Appendix A (Normative Appendix) Approximate conversion of internal oil leakage of different oil temperature and oil quality slide valves 22

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard replaces GB/T 11805-2008 "Hydraulic generating units automation components (devices) and their systems basic technical conditions", and Compared with GB/T 11805-2008, the main technical changes are as follows. --- Added "terms and definitions" (see 3.2, 3.3, 3.11); --- Increased the principle of speed setting for pumped storage reversible units or special cases, and modified the electrical of "secondary overspeed contacts" Fixed value (see 3.6, 3.4 of the.2008 edition); ---Modified the electrical output requirements of components (see 5.1.1.12, 5.1.1.12 of the.2008 edition); --- Increased the frequency measurement resolution requirements of the residual voltage measurement method of the electrical speed signal device (see 5.1.2.7,.2008 edition) 5.1.2.7); --- Increased the level requirements for different measurement positions of temperature measuring resistors (RTD) (see 5.1.2.14, 5.1.2.14 of.2008 edition); --- Revised the relevant requirements for electric valves (see 5.1.2.23, 5.1.2.23 of the.2008 version); --- Revised the relevant requirements of the vibration (swing) monitoring device (see 5.1.2.25, 5.1.2.25 of the.2008 edition); --- Revised the relevant requirements of the generator air gap monitoring device (see 5.1.2.26, 5.1.2.26 of the.2008 edition); --- Revised the relevant requirements of the generator partial discharge monitoring device (see 5.1.2.27, 5.1.2.27 of the.2008 edition); --- Revised the relevant requirements for the large axis axial displacement monitoring device (see 5.1.2.28, 5.1.2.28 of the.2008 edition); --- Increased requirements for early smoke detection systems for air sampling (see 5.1.2.37, 5.1.2.37 of the.2008 edition); ---Modified the output accuracy level of the transmitter (see 5.1.2.41, 5.1.2.41 of the.2008 version); --- Increased the relevant requirements for the unit's bearing external circulation cooling device (see 5.2.2,.2008 version 5.2.2); --- Removed the relevant requirements for phase-modulation operation in the accident shutdown condition (see 5.2.7, 5.2.7 of the.2008 edition); --- Increased the accident shutdown signal and alarm signal of low oil pressure and low pressure position of hydraulic tank accident (see 5.2.7,.2008) Version 5.2.7); ---Modified emergency shutdown signal and alarm signal (see 5.2.8, 5.2.8 of.2008 edition); ---Modified the description of the gas fire extinguishing system in the field test of the fire alarm system and automatic fire extinguishing system (see 7.8.6,.2008 edition) 7.8.6); --- Added description of the field test of the shaft insulation monitoring device (see 7.8.13). This standard was proposed by the China Electrical Equipment Industry Association. This standard is under the jurisdiction of the National Turbine Standardization Technical Committee (SAC/TC175). This standard was drafted. Harbin Electric Machinery Research Institute, Harbin Electric Machinery Co., Ltd., Dongfang Motor Control Equipment Co., Ltd. China Institute of Water Resources and Hydropower Research Institute of Automation, China Hydropower Consulting Group East China Survey and Design Institute, Yalong River Basin Hydropower Development Jinping Hydropower Plant Co., Ltd., China Datang Group Science and Technology Research Institute Co., Ltd. Hydropower Research Institute. The main drafters of this standard. Park Xiu Ri, Wang Lixian, Hou Renjie, Liu Tongan, Tan Zhongmei, Zhang Xinhua, Li Hua, Zhou Jie. The previous versions of the standards replaced by this standard are. ---GB/T 11805-1989, GB/T 11805-1999, GB/T 11805-2008. Hydrogenerator set automation components (devices) Basic technical conditions of its system

1 Scope

This standard specifies the basic technical requirements for the automation components (devices) used in hydroelectric generating units, water inlet valves and speed control systems. Seek and system configuration requirements, and specify the corresponding test methods and acceptance rules, signs, packaging and other content. This standard applies to the manufacture of products for hydropower station automation components (devices) and the automation of hydroelectric generating units that meet one of the following conditions. System configuration and handover acceptance of components (devices). a) single unit capacity is 10MW and above; b) Impact type units with a nominal diameter of 1.5 m and above; c) Francis turbines with a nominal diameter of 2.5 m and above; d) Axial flow, diagonal flow, tubular flow units with a nominal diameter of 3.3 m and above. System configuration of automation components (devices) of hydroelectric generating units, pumped-storage reversible units, and tidal generating units of less than the above range Placement and handover acceptance can be referred to.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. Definition and selection of GB/T 1048 pipe component PN (nominal pressure) GB/T 2423.4 Environmental testing of electric and electronic products - Part 2. Test method test Db alternating heat (12h 12h cycle) GB/T 3452.1 O-ring rubber seals for hydraulics - Part 1 . Dimension series and tolerances GB/T 3452.2 O-ring rubber seals for hydraulics - Part 2. Appearance quality inspection standard GB/T 8564 Hydrogenerator Set Installation Technical Specifications GB 11120 turbine oil GB/T 12244 pressure reducing valve general requirements General technical conditions for GB/T 13384 mechanical and electrical product packaging GB/T 14048.1-2012 Low-voltage switchgear and control equipment - Part 1. General GB/T 14048.16 Low-voltage switchgear and controlgear - Part 8. Loaded thermal protection (PTC) control for rotating electrical machines unit GB 16280 linear heat detector GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test Technical guide for GB/T 28570 hydroelectric generating set status online monitoring system HG/T 2579 O-ring rubber ring material - Part 1. For general hydraulic systems JB/T 834 Tropical Low Voltage Electrical Specifications JB/T 4159-2013 General technical requirements for tropical electrical products JB/T 8528 ordinary valve electric device technical conditions

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 11805-2019_English be delivered?

Answer: Upon your order, we will start to translate GB/T 11805-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 11805-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 11805-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 11805-2019?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 11805-2019 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.