HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 10760.2-2017 English PDF

US$119.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 10760.2-2017: Generator of small wind turbines -- Part 2: Testing methods
Status: Valid

GB/T 10760.2: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 10760.2-2017English119 Add to Cart 3 days [Need to translate] Generator of small wind turbines -- Part 2: Testing methods Valid GB/T 10760.2-2017
GB/T 10760.2-2003English359 Add to Cart 3 days [Need to translate] Generator of off-grid wind turbines generator system -- Part 2: Testing method Obsolete GB/T 10760.2-2003

PDF similar to GB/T 10760.2-2017


Standard similar to GB/T 10760.2-2017

GB/T 19071.1   GB/T 19070   GB/T 17646   GB/T 25383   GB/T 32077   GB/T 10760.1   

Basic data

Standard ID GB/T 10760.2-2017 (GB/T10760.2-2017)
Description (Translated English) Generator of small wind turbines -- Part 2: Testing methods
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F11
Classification of International Standard 27.180
Word Count Estimation 6,633
Date of Issue 2017-10-14
Date of Implementation 2018-05-01
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 10760.2-2017: Generator of small wind turbines -- Part 2: Testing methods

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Generator of small wind turbines - Part 2. Testing methods ICS 27.180 F11 National Standards of People's Republic of China Replacing GB/T 10760.2-2003 Small wind turbine generator Part 2. Test methods Generatorofsmalwindturbines-Part 2.Testingmethods 2017-10-14 Published 2018-05-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released

Foreword

GB/T 10760 "small wind turbine generator" is divided into the following two parts. --- Part 1. Technical conditions; --- Part 2. Test methods. This section GB/T 10760 Part 2. This section drafted in accordance with GB/T 1.1-2009 given rules. This Part replaces GB/T 10760.2-2003 "Off-grid wind turbine generator Part 2. Test Method." versus GB/T 10760.2-2003 compared to editorial changes in addition to the main technical changes are as follows. --- Modify the scope of this section; --- Standardized reference documents and made a readjustment; --- Expand the test instrumentation; --- Modify the overload test method; --- Modify the bearing temperature measurement methods and content; --- Fixed the formula for calculating the efficiency of the error correction and increase non-copper material parameters change; --- Expanded the load curve of the measurement content; --- Expanded start resistance torque measurement method; --- Remove the low-temperature test and electromagnetic interference measurement content; --- Increased vibration test method; --- Increased noise test method; --- Removed the test report format and content. This part is proposed by China Machinery Industry Federation. This part of the National Wind Machinery Standardization Technical Committee (SAC/TC50) centralized. This part of the drafting unit.Ningbo Jinlang New Energy Technology Co., Ltd., China Agricultural Mechanization Research Institute Hohhot Branch, Hefei People Power Co., Ltd., Guangzhou Red Eagle Energy Technology Co., Ltd., Hohhot Boyang Renewable Energy Co., Ltd., Shanghai Zhiyuan Green Energy Co., Ltd., Aohuang Detection Technology Services (Shanghai) Co., Ltd., State Grid Zhejiang Xiangshan County Power Company. The main drafters of this section. Wang Yiming, Zhang Tianci, Dong Wenbin, Zhang Weimin, Wu Yougang, Yang Bin, Yu Wei, Huang Fei, Wang Weifu. This section was first released in April.2003, this is the first revision. Small wind turbine generator Part 2. Test methods

1 Scope

GB/T 10760 provisions of this part of a small wind turbine generator (hereinafter referred to as "generator") test method. This section applies to 0.1kW ~ 100kW small wind turbine generator.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all revisions) applies to this document. GB/T 755 Rotating motor quotas and performance GB/T 1029 three-phase synchronous motor test method GB/T 4942.1 rotary motor overall structure of the protection level (IP code) classification GB/T 10068 Shaft center height of 56mm and above the motor vibration and vibration measurement, assessment and limits GB/T 10069.1 rotary motor noise measurement methods and limits - Part 1. Rotor electrical noise measurement method GB/T 12665 motor under normal conditions of use damp heat test requirements GB/T 17646 small wind turbine GB/T 22719.1 alternating current low-voltage motors interspersed winding inter-turn insulation Part 1. Test methods Test methods and limits for turn - to - turn insulation of molded low - voltage windings of JB/T 5811

3 Terms and definitions

GB/T 755, GB/T 17646 defined terms and definitions apply to this document.

4 test requirements and preparation

4.1 Test prototype 4.1.1 The test prototype shall be accompanied by relevant technical data, drawings and installation instructions. 4.1.2 Test prototype should be accompanied by product certification. 4.2 measuring instruments Instruments used in measurement should meet the following requirements. a) The measuring instruments, meters and sensors used in the test shall be qualified by the metrological department and shall be valid within the validity period; b) the accuracy of the electrical measuring instruments used in the test should not be less than 0.5 (except megohmmeter), the accuracy of the power sensor should Not less than 0.2, the accuracy of the power transmitter should not be less than 0.5, tachometer accuracy should not be less than 1.0, dynamometer Accuracy should not be less than 1.0 (except hanging spring scale), thermometer error should be ± 1 ℃. c) When the inverter is used as the test power supply, the input and output terminals of the converter should adopt the wide-band digital measuring instrument, and in the measured frequency range

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 10760.2-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 10760.2-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 10760.2-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 10760.2-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 10760.2-2017?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 10760.2-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.