Open-cut mine rotary blast hole drill -- Part 2: Industrial test method
| Valid |
GB/T 10598.2-2017
|
GB/T 10598.2-2005 | English | 479 |
Add to Cart
|
3 days [Need to translate]
|
Industrial test method of open-cut mine rotary blast hole drill
| Obsolete |
GB/T 10598.2-2005
|
GB/T 10598.2-1989 | English | 319 |
Add to Cart
|
3 days [Need to translate]
|
Method for industrial test of rotary blast hole drills
| Obsolete |
GB/T 10598.2-1989
|
PDF similar to GB/T 10598.2-2017
Basic data Standard ID | GB/T 10598.2-2017 (GB/T10598.2-2017) | Description (Translated English) | Open-cut mine rotary blast hole drill -- Part 2: Industrial test method | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | D92 | Classification of International Standard | 73.100.30 | Word Count Estimation | 14,143 | Date of Issue | 2017-07-12 | Date of Implementation | 2018-02-01 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 10598.2-2017: Open-cut mine rotary blast hole drill -- Part 2: Industrial test method---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Open-cut mine rotary blast hole drill - Part 2. Industrial test method
ICS 73.100.30
D92
National Standards of People's Republic of China
Replacing GB/T 10598.2-2005
Open pit drilling and rotary drilling rig
Part 2. Industrial test methods
Part 2. Industrialtestmethod
2017-07-12 released
2018-02-01 Implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People 's Republic of China
China National Standardization Management Committee released
Foreword
GB/T 10598 "open pit drilling and rotary drilling rig" is divided into two parts.
- Part 1. General technology;
Part 2. Industrial test methods.
This part is part 2 of GB/T 10598.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part of the replacement GB/T 10598.2-2005 "open-pit mine drilling and rotary drilling machine industrial test method." This part with
GB/T 10598.2-2005 compared to the editorial changes in the main technical content changes are as follows.
--- modified part of the term;
- modified the conditions under which the industrial test was completed (see 5.1,.2005 5.1);
- to modify the preparation of industrial tests (see Chapter 6, Chapter 6 of the.2005 edition);
- rewrite the contents of the "Industrial Test" and the corresponding "Industrial Test Method" section (see Chapter 7).
This part is made by the China Machinery Industry Federation.
This part of the National Mining Machinery Standardization Technical Committee (SAC/TC88) centralized.
This part of the drafting unit. Sinosteel Hengyang Heavy Machinery Co., Ltd., Luoyang Mining Machinery Engineering Design and Research Institute Co., Ltd., Nanchang
Kaima Limited.
The main drafters of this part. Huang Huiming, Zhang Luming, Cai Guohong, Liu Min, Li Ke, Wei Pingjin, Zhou Xiangheng.
This part of the previous version of the standard to replace the release of the situation.
GB/T 10598.2-1989, GB/T 10598.2-2005.
Open pit drilling and rotary drilling rig
Part 2. Industrial test methods
1 Scope
This part of GB/T 10598 specifies the contents and methods of industrial tests for open pit drilling and rotary drilling rigs.
This section applies to industrial tests of open pit drilling machines and rotary drilling rigs (hereinafter referred to as "rigs").
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 3768 Acoustic vocal pressure method for the determination of noise sources Sound power level Reflective surface above the use of envelope measurement of the surface of the simple method
Mining machinery - Part 1. Mining equipment GB/T
Laboratory Evaluation of Seat Vibration of GB/T 8419 Earthmoving Machinery Driver
Open - pit mine - and - rotary drilling rigs - Part 1. Generic technology GB/T
GB/T 13325 Radiation noise of machines and equipment Radiation operator Basic criteria for position noise measurement (engineering grade)
Performance requirements and test methods for earth - moving tracked brake systems
Safety requirements for mine borehole drilling rig GB 21009
3 terms and definitions
GB/T 7679.1 Definitions and the following terms and definitions apply to this document.
3.1
Repair and maintenance time
Consists of three parts.
a) downtime repair or commissioning time required for product design or manufacturing quality problems;
b) the downtime required for the normal replacement of wearing parts;
c) normal equipment maintenance check time.
3.2
Stop timeofexternalcause
Due to production organization or illegal operation and other non-machine causes their own downtime.
3.3
Average abundance averagedriledfootagepershift
During the trial period, the ratio of total footage to total number of classes.
3.4
Drilling time utilization usefactorofdrilingtime
The percentage of pure drilling time and drilling cycle time over a certain period of time.
|