GB 50295-2016: Code for design of cement plant
Status: Valid

GB 50295: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB 50295-2016English3099 Add to Cart 14 days [Need to translate] Code for design of cement plant Valid GB 50295-2016
GB 50295-2008EnglishRFQ ASK 3 days [Need to translate] Code for design of cement plant Obsolete GB 50295-2008
GB 50295-1999EnglishRFQ ASK 3 days [Need to translate] Code for design of cement plant Obsolete GB 50295-1999

PDF similar to GB 50295-2016


Standard similar to GB 50295-2016

GB 50156   GB 50174   GB 50309   GB/T 50530   GB 50161   

Basic data

Standard ID GB 50295-2016 (GB50295-2016)
Description (Translated English) Code for design of cement plant
Sector / Industry National Standard
Classification of Chinese Standard P34
Classification of International Standard 91.040.20
Word Count Estimation 244,266
Date of Issue 2016-08-18
Date of Implementation 2017-04-01
Older Standard (superseded by this standard) GB 50295-2008
Quoted Standard GB 50007; GB 50009; GB 50011; GB 50012; GB 50013; GB 50014; GB 50015; GB 50016; GB 50019; GBJ 22; GB 50025; GB 50029; GB 50034; GB 50041; GB 50050; GB 50054; GB 50055; GB 50057; GB 50058; GB 50060; GB 50062; GB 50063; GB/T 50065; GB 50067; GB/T 50087; GB/
Regulation (derived from) Ministry of Housing and Urban - Rural Development Notice No.1269 of 2016
Issuing agency(ies) Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Summary This standard applies to the design of new, alteration and expansion of cement plants.

GB 50295-2008: Code for design of cement plant

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
UDC NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA Code for Design of Cement Plant Issued on: SEPTEMBER 24, 2008 Implemented on: OCTOBER 1, 2009 Jointly Issued by. Ministry of Housing and Urban-Rural Development (MOHURD) and the General Administration of Quality Supervision, Inspection and Quarantine (GAQSIQ) of the People’s Republic of China GB National Standard of the People’s Republic of China Code for design of cement plant GB 50295—2008 Chief Drafting Origination. National Building Materials Industrial Standard Ration General Approval Department. the Ministry Of Housing and Urban-Rural Development of PRC Implementation date. October 1, 2009 China Planning Press Beijing, 2008 Announcement of the Ministry Of Housing and Urban-Rural Development of PRC No.120 Announcement on Issuing the National Standard "Code for Design of Cement Plant" "Code for design of cement plant" is approved as national standard with code GB 50295-2008, and it is implemented from the date January 1, 2009. In this standard, articles 1.0.6, 3.1.10, 5.1.1 (1), 5.4.2, 5.4.3, 5.4.4, 5.7.4 (1, 2, 3, 4, 8, 9), 7.6.9 (1, 2), 7.9.4 (2, 3), 7.11.2 (7), 8.6.9, 9.2.5 (2), 9.2.13, 9.4.6, 9.5.1, 9.5.6, 10.2.1 (5), 10.3.3 (7), 10.3.4, 10.4.3 (5), 11.4.6 (1) and 11.4.13 are compulsory provisions, and they must be implemented strictly. The former standard "Code for design of cement plant" GB 50295-1999 is abolished simultaneously. This standard is published by China Planning Press (organized by the standard ration institute under the Ministry). The Ministry of Housing and Urban-Rural Development of PRC September 24, 2008

Foreword

According to the requirements of the document Jian Biao Han [2005] No.124 - "announcement on printing and issuing the revision and preparation planning of engineering construction standard (batch 2) in 2005" issued by the Ministry of Construction, this standard is revised from the former standard "Code for design of cement plant" (GB 50295-1999) by Tianjin Cement Industry Design & Research Institute Co., Ltd., China Cement Association jointly with the companies like Sinoma International (Nanjing) Cement Industrial Design Institute, Chengdu Design and Research Institute of Building Materials Industry Co., Ltd., and Nanjing Kaisheng Cement Technology Engineering Co., Ltd.. This standard after revision are composed of 13 chapters and 9 annexes, and the contents it refers to are as general provisions, design scale and criteria, Site Selection and Overall Planning, raw material and fuel, production process, general layout and transportation, electricity and automation, building structure, water supply and drainage, heating, ventilation and air conditioning, mechanical equipment repair, waste-heat utilization. The main revisions are as. 1. Adjust the scale definition of cement plant. 2. Add the content land use planning. 3. Add the content waste material reuse and disposal. 4. Add the content management information system. 5. Cancel the content casting and wood model in machinery repair. 6. Add the maintenance and overhaul of automation instrument. 7. Cancel the content related to energy-saving. 8. Cancel the content related to mining area. 9. Cancel the content related to environmental protection in Annex B. 10. Add the content of waste heat utilization. The provisions printed in bold type are compulsory ones and must be enforced strictly. The ministry of housing and urban-rural development takes the charge of the explanation of the compulsory provisions, National Building Materials Industrial Standard Ration General take the charge of the routine management, and Tianjin Cement Industry Design & Research Institute Co., Ltd is in charge of the explanation of specific content. All relevant organizations are kindly requested to sum up and accumulate your experiences in actual practices during the process of implementing this code. The relevant opinions and advice, whenever necessary, can be posted or passed on toTianjin Cement Industry Design & Research Institute Co., Ltd. (Address. No.1, Yinheli Beidao, Beichen District, Tianjin 300400, China) Chief Drafting Origination. Tianjin Cement Industry Design & Research Institute Co., Ltd. and China Cement Association Particating Drafting organiztions. Sinoma International (Nanjing) Cement Industrial Design Institute, Nanjing Kaisheng Cement Technology Engineering Co., Ltd. and Chengdu Design and Research Institute of Building Materials Industry Co., Ltd. Chief drafting staffs. Zeng Xuemin, Wu Zuomin, Di Dongren, Fan Yulin, Guo Tiandai, Hu Zhijuan, Bai Bo, Yang Lulin, Wang Ziqing, Zhang Wanli, Li Yuguang, Yu Desheng, Yan Hongling, Han Jiuwei, Xuan Yiqun, Zhang Wanchang, Wang Zhaoming, Pan Yunhan, Li Huirong, Yu Guangkun, Dong lanqi, Wu Tao, Zhu Xiaobin, Fan Qiongzhang

Table of Contents

1. General provisions ...1 2. Design scale and criteria ...2 2.1 Design scale...2 2.2 Design considerations ...2 3. Site Selection and Overall Planning...4 3.1 Site Selection ...4 3.2 Overall Planning ...5 3.3 Land Use Planning ...6 4. Raw Material and Fuel ...7 4.1 General Rules ...7 4.2 Raw Material ...7 4.3 Coal for Incineration Use ...8 4.4 Adjustable Solidification Agent...9 4.5 Mixed Material ...9 4.6 Mix Design ... 10 4.7 Technological Performance Test of Raw and Fuel Materials... 10 4.8 Comprehensive Utilization of Raw and Fuel Materials ... 11 4.9 Utilization of Waste Material ... 11 5. Production Technology ... 12 5.1 General Rules ... 12 5.2 Material Crushing ... 16 5.3 Material/fuel Pre-homogenization and Storage ... 17 5.4 Waste Disposal ... 18 5.5 Raw Material Powder... 19 5.6 Homogeneization, Storage and In-kiln of Crude Materials ... 21 5.7 Pulverized Coal Preparation ... 22 5.8 Clinker Burning ... 23 5.9 Storage and Transportation of Clinker, Mixed Materials and Gypsum... 27 5.10 Cement Powder ... 28 5.11 Storage of Cement... 29 5.12 Cement Packaging, Finished Product Stockpiling and Cement Bulk Loading... 30 5.13 Drying of Materials ... 31 5.14 Compressed Air Station... 31 5.15 Laboratory ... 32 5.16 Fireproof Materials... 32 5.17 Technical Measurement, Measurement and Production Control ... 36 6. General Layout Transportation... 38 6.1 General Rules ... 38 6.2 Design of General Plan ... 39 6.3 Transportation... 43 6.4 Elevation Planning ... 45 6.5 Earth and Stone Works... 47 6.6 Rainwater Drainage... 47 6.7 Flood Control Project ... 48 6.8 Integrative Layout of Pipeline ... 49 6.9 Greening Design ... 50 7 Electricity and Automation... 52 7.1 General provisions ... 52 7.2 Power supply and distribution system... 52 7.3 35~ 110kV general step-down station... 53 7.4 6~10kV distribution station and substation ... 55 7.5 Plant site distribution lines ... 56 7.6 Workshop distribution and drag control... 56 7.7 Lighting ... 61 7.8 Protection against Lightning... 65 7.9 Electrical System Grounding... 65 7.10 Process Automation ... 66 7.11 Control Room ... 69 7.12 Instrument and Power / Air Supply... 70 7.13 Cable and Anti-Interference ... 71 7.14 Grounding of Automatic System ... 72 7.15 Communication and Broadcasting System... 72 7.16 Management Information System... 75 8. Building Structure... 77 8.1 General Rules ... 77 8.2 Production Department and Auxiliary Department ... 77 8.3 Auxiliary room, Production Control and Living Building ... 78 8.4 Design of Building Construction ... 78 8.5 Selection of the Main Structure ... 80 8.6 Structural Arrangement ... 80 8.7 Design Load... 81 8.8 Structural Calculation... 83 9. Water Supply and Drainage... 85 9.1 General Rules ... 85 9.2 Water Supply ... 85 9.3 Drainage ... 87 9.4 Water Supply and Drainage of Workshop... 88 9.5 Plant Fire-fighting and the Water Utilization ... 88 10. Heating, Ventilation and Air Conditioning ... 91 10.1 General Rules... 91 10.2 Heating ... 91 10.3 Ventilation ... 95 10.4 Air Conditioning ... 97 11. Mechanical Equipment Repair... 99 11.1 General Rules... 99 11.2 Composition and Equipment of the Section ... 99 11.3 Section Layout ... 101 11.4 Section Plant ... 102 12. Electrical Equipments and Instrument Repair ... 104 12.1 General Rules... 104 12.2 the Scale of the Electrical Equipment and Electric Instrument Repair Workshop 104 12.3 Electrical Equipment/Instrument Repair Content and Equipment Selection... 105 12.4 The Configuration of the Electrical Equipment and Electric Instrument Repair Workshop ... 105 12.5 Electric Instrument Maintenance ... 106 12.6 Automation Instrument Maintenance... 106 13. Waste-heat Utilization... 107 13.1 General Rules... 107 13.2 Power Generation By Waste-Heat ... 108 13.3 Waste-heat Heating and Cooling ... 109 Appendix A Fire Hazard Type, Fireproof and Fire Break Yielding by Buildings (structures) of the Cement Plant ... 110 Appendix B Major Technical Code of the Cement in-plant Road... 116 Appendix C Minimum Horizontal Clear Distance of the Underground Line ... 118 Appendix D Minimum Horizontal Clear Distance between The Underground Line or the Crossover Line and the Buildings (structures) ... 119 Appendix E the Minimum Vertical Clear Distance between the Underground Lines, or between the Underground Line and the Railway or the Road Crossing ... 121 Appendix F the Minimum Illumination Standard for the Production Department and Auxiliary Building of the Cement Plant... 122 Appendix G Physical Characteristic Parameters of the Bulk Material ... 124 Appendix H Ventilation Rate of the Buildings of the Cement Plant ... 125 Appendix J Calculation for the Temperature and Dampness of Air Conditioning Room in the Cement Plant Buildings ... 126 Explanations of Wording in This Code... 127 1. General provisions 1.0.1 This code is formulated to go through with national technical and economic policies during design of cement plant, so as to achieve safety and reliability, state-of-art technology, environment protection and energy conservation, economy and rationality. 1.0.2 This code is applicable to design of construction, extension and renovation of production line in cement plant (including clinker base, cement milling station and bulk loading station). 1.0.3 Design of cement plant shall be carried out on the base of analyzing the integrate benefits and market demand. Advanced, applicable, economical and reliable production process and equipment shall be adopted for cement plant so as to lower down the project investment, raising labor productivity and shorten construction period. 1.0.4 Design of cement plant shall be carried out according to local conditions and also based on the cooperation with town or neighboring industry and agriculture in terms of transportation, public power facilities, culture & education & health, complex utilization and domestic installation. 1.0.5 Extension and renovation projects of cement plant shall make use of existing facilities, fields and resources. 1.0.6 New dry process cement production shall be adopted for design of cement plant. Construction and extension of cement production lines prohibited by national industrial policies, such as wet process rotary kiln, lepol system and dry process hollow kiln, must not be carried. 1.0.7 Design of cement plant should utilize industrial waste and comprehensively utilize resource and energy. 1.0.8 Not only the requirements stipulated in this code, but also those in the current relevant ones of the nation shall be complied with for design of cement plant. 2. Design scale and criteria 2.1 Design scale 2.1.1 Design scale of production line in cement plant shall be determined by considering market trend of products and source of raw materials and fuel, and also shall be divided according to the following provisions. 1 Production line with 4000t and more daily cement clinker output in single line shall be determined as large scale. 2 Production lines with daily cement clinker output less than 4000t and more than 2000t in single line shall be determined as medium scale. 3 Production lines with daily cement clinker output less than 2000t in single line shall be determined as small scale. 2.2 Design considerations 2.2.1 Construction unit shall provide initial documents of design. Initial documents of design shall comprise the following primary contents. 1 As for construction project implementing examination & approval system, approved project proposal or report on project pre-feasibility study shall be prepared; Approved feasibility study report of the project shall be prepared at preliminary design stage (including report on site selection); Approved documents on preliminary design shall be prepared during the period of working drawing design. As for construction project implementing approve system, approved project application report shall be prepared at preliminary design and working drawing design period (including report on site selection) 2 Resource exploration report approved by state-level or province-level mineral resources (limestone and silica-alumina raw materials) administration

3 Report on technological performance test for raw materials and fuel

4 Exploration report on engineering geology and hydrological geology of plant site and

the field of limestone crushing plant out of the plant

5 Report on hydrological geology of water source area and engineering geological

prospection (attached with topographic drawing of water source area and water delivery lines. 1.2000 or 1.1000); intention letter or written agreement or feasibility study report on water supply.

6 Intention letter or written agreement or feasibility study report on power supply and

communication

7 Intention letter or written agreement on outsourcing raw materials and fuel supply

8 Intention letter or written agreement or feasibility study report on transportation and

communication (transportation capacity, rail junction scheme, water transportation and road transportation)

9 Written documents of the competent department for agreeing to requisition of the

construction land 10 The following topographic survey. 1) Regional topographic drawing 1.10000, 1.50000 or 1.5000 2) Topographic drawing of plant site and minefield. feasibility study and primary design stage 1. 2000 or 1 1000; At construction documents design stage 1.1000 or ∶ 1.500. 3) Topographic drawing of railway siding 1.2000 or 1.1000. 11 Weather and hydrologic data of the plant construction site (including flood information of plant site) 12 Survey report on earthquake intensity 13 Requirements of urban construction program for the plant site 14 Report of environmental impact assessment and requirements of environmental protection department on plant construction 15 Safety requirements 16 Intention letter or written agreement on sewage discharge 17 Price of local building materials, general estimate and budget estimate, technical and economic documents 18 Other written agreements and documents on regional cooperation 3. Site Selection and Overall Planning 3.1 Site Selection 3.1.1 The site selection shall not only meet the requirement of the industrial distribution and regional construction planning, but shall also comply with relevant regulations, laws and provisions of the previous work. 3.1.2 The site selection shall be determined according to the construction scale, raw material and fuel source, transportation and communication, power and water supply, engineering geology, environmental protection, enterprise cooperation conditions, site existing utilities and produce market flow direction through the technical and economic comparison. 3.1.3 The plant site should be set near the limestone mines, and it shall be provided with transportation and communication conditions which have economic feasibility. At the same time the site selection shall be conducive to the cooperation between the adjacent enterprises and towns. However, the site should not be set far away from the town or inaccessible areas. 3.1.4 The site shall supply enough power and water source required for the continuous production requirement and development planning, while its out-of-factory power transmission and water delivery lines shall be short, nimble and also facilitate the maintenance and management. 3.1.5 The plant site shall make full use of the topography, so as to shorten the interior transport distance and conserve land. 3.1.6 In satisfying with the short-term site area required and under the premise of saving capital investment, the site shall be reserved with developmental space according to the long-term planning requirements. 3.1.7 The site shall be selected to meet the engineering construction requirements in respect with the engineering geology and geohydrologic conditions, and it shall avoid the useful mineral deposit. 3.1.8 The site shall lie on the windward side in the town and residential area where the minimum frequency wind direction all the year around is present, but it shall be in the wind-haul district. 3.1.9 The site elevation should be higher than 0.5m plus the flood protection standard stage. In case of less than the above elevation, the plant site shall be equipped with flood control facilities, which shall be built in the initial project. When the site is located in water logging areas and draining water-logged facilities are available, the site elevation shall be designed to be 0.5m plus the water logging level. When the plant site is located in a mountainous area, torrent prevention and drainage facilities shall be set thereof. 3.1.10 The flood protection standards of the cement plant shall be in accordance with relevant regulations of current national standard "Flood Protection Standard" GB 50201. The new dry-process cement plant shall also be in accordance with those specified in Table 3.1.10. Table 3.1.10 Flood Protection Standard of New-process Dry Method Cement Plant Class Plant size Return period (year) Ⅰ Large-sized ≥100 Ⅱ Medium-sized ≥50~100 Ⅲ Small-sized ≥25~50 Note. The plant with multiple product line improves its flood protection standard accordingly. 3.1.11 Bridge culverts, tunnels, vehicles, terminals and other external conditions or transportation modes shall meet the requirements for transporting bulky or large pieces of equipment. 3.2 Overall Planning 3.2.1 The overall planning of the cement plant shall not only meet the requirements of the regional plan or town planning of the regions, but should also be cooperated with the urban residential area and the adjacent industrial enterprises in environmental protection, transportation, power utilities, repairs, storage, culture and education health, living facilities. 3.2.2 The overall planning of the cement plant shall not only arrange the plant site rationally, but shall also handle the relationship between the plant site and the limestone mine, silicon aluminum raw material mine, water source, water supply and water treatment fields, sewage treatment plant, total receiving substation, railway integration station, out-of-factory railway or water transportation terminals. 3.2.3 The overall planning of the cement plant shall correctly handle the short-term and long-term relationship. The short-term planning shall be laid rationally and concentrically, while the long-term planning shall allow development spaces, take over land in phases and shall not take over land for preservation. 3.2.4 The selection of the external transportation mode of the cement plant should meet the following requirements.

1 External transportation mode shall be determined according to local transportation

conditions When the plant is located near the natural water systems, better ports and navigation conditions are present, so water transportation shall dominate the plant; when land carriage is adopted, the railway and road transportation plans shall be determined according to the traffic, transport distance, convergence conditions through the comparison, in addition, the railway and highway traffic ratio shall be determined by the market supply conditions.

2 The cement bulk exportation facilities shall be configured according to the receptive

ability, transit storage and handling transportation conditions of the plant site to the bulk cement, and the proportion of the bulk cement in various forms of transport shall be improved. 3 The selection for the out-of-factory railway convergence point and plant-line-leading direction shall not only be closely cooperated with the plan layout and vertical design of the plant through the multi-determined technical and economic comparison, but also the positions of the facilities like enterprise station, railroad track scale and locomotive readiness scale production lines shall be planned. 4 The mounting of the enterprise station shall be determined according to the traffic size, operational requirements, management methods and integration point conditions, and shall take full advantage of the road net railway yard capability, but shall not be constructed repeatedly. When the connection line and leased railway locomotive are allowed to be mounted in addition on the convergence station, the goods transfer approach should be adopted, and the enterprise station may not be set. 5 The connection between the out-of-factory road and highway of town or residential area in the cement plant shall be smooth, short and fast. Moreover, convenient road connection shall be set between the plant si...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 50295-2016_English be delivered?

Answer: Upon your order, we will start to translate GB 50295-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 10 ~ 14 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 50295-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB 50295-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB 50295-2016?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 50295-2016 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.