US$139.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 19079.9-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 9: Archery place Status: Valid GB 19079.9: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB 19079.9-2013 | English | 139 |
Add to Cart
|
3 days [Need to translate]
|
Operation conditions and technical requirements for gymnasium and playground -- Part 9: Archery place
| Valid |
GB 19079.9-2013
|
| GB 19079.9-2005 | English | 239 |
Add to Cart
|
2 days [Need to translate]
|
Operation conditions and technical requirements for gymnasium and playground -- Part 9: Archery Place
| Obsolete |
GB 19079.9-2005
|
PDF similar to GB 19079.9-2013
Basic data | Standard ID | GB 19079.9-2013 (GB19079.9-2013) | | Description (Translated English) | Operation conditions and technical requirements for gymnasium and playground -- Part 9: Archery place | | Sector / Industry | National Standard | | Classification of Chinese Standard | Y55 | | Classification of International Standard | 97.220 | | Word Count Estimation | 6,691 | | Older Standard (superseded by this standard) | GB 19079.9-2005 | | Quoted Standard | GB/T 10001.1 | | Regulation (derived from) | National Standards Bulletin 2013 No. 27 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the archery open spaces should have the basic conditions and basic technical requirements. This standard applies to all types of archery to the community open spaces. |
GB 19079.9-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 9: Archery place ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Operation conditions and technical requirements for gymnasium and playground.Part 9. Archery place
ICS 97.220
Y55
National Standards of People's Republic of China
Replacing GB 19079.9-2005
Sports venues open conditions and technical requirements
Part 9. Archery place
Part 9. Archeryplace
Issued on. 2013-12-31
2014-12-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
All technical content in this Part of GB 19079 is mandatory.
GB 19079 "sports venues open conditions and technical requirements" is divided into the following sections.
--- Part 1. swimming places;
--- Part 2. Karting place;
--- Part 3. Bungee place;
--- Part 4. rock climbing places;
--- Part 5. Skating place;
--- Part 6. skiing;
--- Part 7. figure skating place;
--- Part 8. Shooting place;
--- Part 9. Archery place;
--- Part 10. Dive sites;
--- Part 11. rafting place;
--- Part 12. gliding wing place;
--- Part 13. Balloon and Airship place;
--- Part 19. expansion spaces;
--- Part 20. hockey place;
--- Part 21. Boxing place;
--- Part 22. Taekwondo place;
--- Part 23. trampoline place;
--- Part 24. Aircraft movement places;
--- Part 25. skydiving place;
--- Part 26. aerospace model places;
--- Part 27. Directional, radio direction finding places;
--- Part 28. Sanda place;
--- Part 29. climbing places;
--- Part 30. Mountain outdoor venues;
--- Part 31. Alpine Adventure venues;
This is Part 9 GB 19079's.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This Part replaces GB 19079.9-2005 "sports venues open conditions and technical requirements - Part 9. Archery place", and
GB 19079.9-2005 compared to the main technical content changes are as follows.
--- Delete references "GB/T 17903 total number of bacteria in indoor air health standards" (see the 2005 edition of Chapter 2);
--- Delete "1m line" terms and definitions (see the 2005 edition 3.4);
--- Edit "archery technical guidance personnel" terms and definitions (see 32, 2005 version 3.2.);
--- Increase the "firing position" terms and definitions (see 3.4);
--- Modify range requirements (see 511, 2005 edition of 5.1.1.);
--- Edit "two adjacent outdoor archery target distance of at least 1m" to "outdoor archery venue adjacent outside edge between two flak
Distance should not be less than 1m "(see 513, 2005 edition of 5.1.3.);
--- Edit "from the rays, 1m line clearly identified" as "from the ray emitting position clearly identified, and the corresponding target number" (see
. 514, 2005 5.1.4);
--- Edit 'indoor target archery museum wall and both sides should target wall or barrier is closed and a penetration-resistant facility "as" indoor target archery shop
After both sides of the wall and the upper and lower target should be a wall or barrier blocking other anti arrow penetrated rebound facility "(see 5.1 .. 5, 2005 edition
5.1.5);
--- Edit "outer space and the most marginalized outdoor archery target after target shall be provided clearly marked, and there are protective measures" for the "outdoor shot
After the arrow target site should be located not less than 1 times the range of the outer most edge of the flak should be located a safe distance of not less than 20m or equivalent safety
Protective measures, and a safety warning logo "(see 516, 2005 edition of 5.1.6.);
--- Increase "indoor archery hall horizontal illumination of not less than 100lx" (see 5.1.7);
--- Edit "Each bow should be provided with the support of arrows, quiver, finger guard, armband and other equipment" to "provide appropriate protective gear and equipment bows
(Such as Finger, armband, etc.) "(see 521, 2005 5.2.1.);
--- Edit "bow and arrow should obtain professional organization meets the legal requirements issued by the inspection product certification" to "bow and arrow should be taken
Obtain product quality inspection certificate "(see 522, 2005 5.2.3.);
--- Delete "There are male and female toilets" (see 2005 5.3.2);
--- Delete the original standard of health, air requirements (see the 2005 version of the 6.1, 6.2);
--- Increase "indoor archery hall ventilation shall be provided to keep the air circulation" (see 6.1);
--- Add "Archer equipment should be disinfected on a regular basis" (see 62, 2005 6.2.);
--- Archery equipment requirements increase technical guidance personnel (see 7.5);
--- Modify the security system and measures (see Chapter 7)
This section is proposed and managed by the State Sports General Administration.
This section is drafted. State General Administration of Sport Shooting and Archery Sports Management Center, the State Sports General Administration of Sports Science Institute.
The main drafters of this section. Victoria Lang, Chi Li Zhong, Dong Wenjin, Su Baosheng, Zhang Kai, Jinzong Jiang, Wang Ting, Wang Ji, a Li, Yang Kaiyuan,
Xiao-Di.
This part of the standard replaces the previous editions are.
--- GB 19079.9-2005.
Sports venues open conditions and technical requirements
Part 9. Archery place
1 Scope
GB 19079 of the provisions of this part of the archery open spaces should have the basic conditions and the basic technical requirements.
This section applies to all types of archery places open to the public.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 10001.1 Public information graphical symbols - Part 1. Common symbols
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Archery place archeryplace
Place to meet people to archery training, competition, fitness and leisure activities, including indoor and outdoor archery archery shop
site.
3.2
Archery instructors archeryinstructor
Archery impart knowledge, skills and staff to protect the safety of archery.
3.3
From Ray shootingline
Archery, archery personnel feet astride, or straight with feet tread, also known starting line or transmission line.
3.4
Launch position shootingposition
When field archery, archery personnel in the emission region emission standard, the rear side of the pile 1m prescribed position when the archery station.
3.5
Range shootingdistance
From the vertical point flak yellow rays from the heart to the ground to the outer edge (including width) distance.
4 Qualifying
Archery instructors should hold the relevant national vocational qualification certificate before taking.
5 places, facilities and conditions
5.1 Site
5.1.1 The range of not less than 8m.
5.1.2 indoor archery hall from the ray path of the arrow width should not be less than 0.8m.
5.1.3 Outdoor Archery Field flak adjacent two outer edges of the spacing should not be less than 1m.
5.1.4 from the ray emission location identification is obvious, and there is the corresponding target number.
5.1.5 After the indoor archery hall flak, targets upper and lower sides of the wall should be a wall or barrier blocking other anti arrow penetrated rebound facilities.
5.1.6 After outdoor archery archery target should be located not less than 1 times the range of the outer most edge of the flak should be located a safe distance of not less than 20m or the like
Efficient security measures, and a safety warning signs.
5.1.7 indoor archery hall illumination level should not be less than 100lx.
5.2 Equipment
5.2.1 provide appropriate equipment and protective gear bows (such as finger guard, armband, etc).
5.2.2 Each flak target should be fixed in the wall or with the support of the target frame, and the corresponding target plate. Bow and arrow should obtain product quality
Certificates of inspection.
5.3 Auxiliary Facilities
5.3.1 archery has specialized depository.
5.3.2 Public instructions should be consistent with the identification GB/T 10001.1 requirements.
6 health, environmental management
6.1 indoor archery hall ventilation shall be provided to keep the air circulating.
6.2 archers equipment should be regularly disinfected.
7 Security
7.1 should establish and improve the safe production responsibility system for posts, rescue and safety management system, equipment and facilities maintenance system, environmental management and health
And other systems.
7.2 should develop emergency response plans.
7.3 shall be provided "archery INSTRUCTIONS" prominently on matters related to safety and special requirements to make real and clear instructions
Warning.
7.4 deal with various security facilities regular inspection and maintenance.
Shall be not less than 7.5 archery place an archery instructor, instructor and public directory, and photo prominently.
7.6 archery places employees induction should wear clearly marked.
7.7 emergency exit and evacuation routes should be identified and kept clear.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 19079.9-2013_English be delivered?Answer: Upon your order, we will start to translate GB 19079.9-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB 19079.9-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB 19079.9-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB 19079.9-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 19079.9-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|