HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB 19079.26-2013 English PDF

US$139.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB 19079.26-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 26: Aero-model and space model place
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB 19079.26-2013English139 Add to Cart 3 days [Need to translate] Operation conditions and technical requirements for gymnasium and playground -- Part 26: Aero-model and space model place Valid GB 19079.26-2013

PDF similar to GB 19079.26-2013


Standard similar to GB 19079.26-2013

GB/T 20394   GB 24429   GB 17498.6   GB/T 19079.32   GB 19079.21   GB 19079.22   

Basic data

Standard ID GB 19079.26-2013 (GB19079.26-2013)
Description (Translated English) Operation conditions and technical requirements for gymnasium and playground -- Part 26: Aero-model and space model place
Sector / Industry National Standard
Classification of Chinese Standard Y55
Classification of International Standard 97.220
Word Count Estimation 6,652
Quoted Standard GB/T 10001.1
Regulation (derived from) National Standards Bulletin 2013 No. 27
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the aerospace model open spaces should have the basic conditions and basic technical requirements. This standard applies to all types of community open spaces aerospace model.

GB 19079.26-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 26: Aero-model and space model place


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Operation conditions and technical requirements for gymnasium and playground.Part 26. Aeromodel and spacemodel place ICS 97.220 Y55 National Standards of People's Republic of China Sports venues open conditions and technical requirements Part 26. Model Aerospace place Part 26. Aeromodelandspacemodelplace Issued on. 2013-12-31 2014-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

All technical content in this Part of GB 19079 is mandatory. GB 19079 "sports venues open conditions and technical requirements" is divided into the following sections. --- Part 1. swimming places; --- Part 2. Karting place; --- Part 3. Bungee place; --- Part 4. rock climbing places; --- Part 5. Skating place; --- Part 6. skiing; --- Part 7. figure skating place; --- Part 8. Shooting place; --- Part 9. Archery place; --- Part 10. Dive sites; --- Part 11. rafting place; --- Part 12. gliding wing place; --- Part 13. Balloon and Airship place; --- Part 19. expansion spaces; --- Part 20. hockey place; --- Part 21. Boxing place; --- Part 22. Taekwondo place; --- Part 23. trampoline place; --- Part 24. Aircraft movement places; --- Part 25. skydiving place; --- Part 26. aerospace model places; --- Part 27. Directional, radio direction finding places; --- Part 28. Sanda place; --- Part 29. climbing places; --- Part 30. Mountain outdoor venues; --- Part 31. Alpine Adventure venues; This section of Part 26 GB 19079. This section drafted in accordance with GB/T 1.1-2009 given rules. This section is proposed and managed by the State Sports General Administration. This section is drafted. State Sports General Administration of Sports Management Center aeronautical radio model, the State Sports General Administration of Sports Science Institute. The main drafters of this section. Wang Lei, Liu Minggang, Wu Shulin, Li Renda, Luo Xiaoqing, Lu Zheng, Jiang Yun Yan, Tan Bin industry. Sports venues open conditions and technical requirements Part 26. Model Aerospace place

1 Scope

GB 19079 of the provisions of this part of the Aerospace Model open spaces should have the basic conditions and basic technical requirements. This section applies to all types of open society aerospace model sites.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 10001.1 Public information graphical symbols - Part 1. Common symbols

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Aerospace Model properties aeromodelandspacemodelplace Be able to meet people model aerospace training, competition, fitness and leisure activities, sports venues, including the central gathering activities, live Fixed relevant regional venues. 3.2 Model airplane aeromodel One heavy on the air, there is the size and weight limits, with or without power for competitions, sports, scientific or entertainment, can not be manned Aircraft. 3.3 Aerospace Model spacemodel Having a weight in the air, there are size and weight restrictions, by propulsion off for competitions, research or entertainment, can not manned aircraft. 3.4 Aerospace Model Movement aeromodelingandspacemodeling In flying, aerospace manipulate the model contest, sports, scientific or recreational flying activities. 3.5 Aerospace Model technical guidance personnel aeromodelandspacemodelinstructor Teach aerospace model kinetic theory and skills of staff. 3.6 Aerospace when competing projects aeromodelandspacemodeltime-competingdiscipline The adjusted or controlled by the program, complete autonomous flight under conditions without human control and to ensure a safe landing aerospace mold Type project, also known as free flight model project. 3.7 Control line item linecontroleddiscipline Compliance by one or more wires, directly controlled by the flight attitude aerospace model project. 3.8 Radio Control Project radiocontroleddiscipline Directly controlled by the aerospace model project model maneuvering by radio signals. 3.9 Venue eventvenue Participants from the model production, maintenance and flight activity area covered by the scope of the general venue contains.

4 Qualifying

Aerospace Model technical guidance personnel and operating personnel should hold the relevant national vocational qualification certificate before taking. 5 places, facilities and conditions 5.1 Site 5.1.1 There shall be established audience area and active area. 5.1.2 Site shall comply with the requirements of Table 1. Table 1 Aerospace Model sports site conditions Aerospace when competing projects It should have the length, width and 800m × 500m above the open, flat ground or greater than the predetermined area (non-elongated) does not Rules Site Control line item Aerobatics It should have the length, width 60m × 60m above the flat concrete (bitumen) or hardened soil site. Perimeter should be long, wide 25m × 15m fly zone and to be the audience area Racing Flight It should have the length, width 60m × 60m above the flat concrete (bitumen) or hardened soil site. Perimeter should be high 2m Metal fence and length, width 25m × 15m fly zone and to be the audience area Combat Flight It should have the length, width 60m × 60m above the flat shallow grass. Perimeter should be long and a width of 25m × 15m to fly Area and the audience area Radio-Controlled project Aerobatics It should have the length, width and 300m × 250m above the open, flat space. Response runways, airfield, operations on site Vertical area, maintenance area (to fly zone) and the audience area and indicate a clear distinction between Gliding flight Should have the length, width and 220m × 220m above the open, flat space, flight area response on the field, the maintenance area (ready to fly Area) and the audience area and indicate a clear distinction between Indoor Flying Should have the length, width and height 20m × 12m × 8m more indoor venues, the museum respond flight area, maintenance area (ready to fly zone) And the audience area and indicate a clear distinction. Indoor aerobatics, should be between flight zone and other regional and nylon weave Fence 5.1.3 should not affect the military or civil airports normal order of flight, flight activities may not have the military restricted area perimeter and endangering flight safety facility. 5.1.4 Events due ambulances parked position and channel. 5.1.5 indoor activity center should evacuation routes and gather boot flags. 5.2 Equipment Aerospace Model equipment shall comply with the provisions of the relevant technical standards. 5.3 Auxiliary Facilities 5.3.1 should be broadcast, communications equipment and the comprehensive range of power supply facilities. 5.3.2 should wind speed, wind measurement equipment. 5.3.3 Events to be provided drinking water station, ambulance point, public health and other facilities. 5.3.4 Public instructions should be consistent with the identification GB/T 10001.1 requirements.

6 Security

6.1 should establish and improve the safe production responsibility system for posts, rescue and safety management system, as well as equipment and facilities maintenance system system. 6.2 should develop security, fire, and emergency plans for severe weather emergencies. 6.3 should be "Secure Flight Information" and safety warning prominently. 6.4 Model Organization aerospace activities should be consistent with national laws and regulations. 6.5 in the active site of potentially hazardous areas should set up warning signs in the field. 6.6 should be equipped with at least two models of aerospace technical guidance personnel. 6.7 Events shall provide weather forecast recently. 6.8 built into, a database registration and management procedures, expert management. 6.9 oil and other hazardous materials storage, management should comply with fire safety regulations of the country.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 19079.26-2013_English be delivered?

Answer: Upon your order, we will start to translate GB 19079.26-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 19079.26-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB 19079.26-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.