HOME   Cart(7)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB 19079.25-2013 English PDF

US$149.00 ยท In stock
Delivery: <= 2 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB 19079.25-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 25: Parachuting place
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB 19079.25-2013English149 Add to Cart 2 days [Need to translate] Operation conditions and technical requirements for gymnasium and playground -- Part 25: Parachuting place Valid GB 19079.25-2013

PDF similar to GB 19079.25-2013


Standard similar to GB 19079.25-2013

GB/T 20394   GB 24429   GB 17498.6   GB/T 19079.32   GB 19079.21   GB 19079.22   

Basic data

Standard ID GB 19079.25-2013 (GB19079.25-2013)
Description (Translated English) Operation conditions and technical requirements for gymnasium and playground -- Part 25: Parachuting place
Sector / Industry National Standard
Classification of Chinese Standard Y55
Classification of International Standard 97.220
Word Count Estimation 5,591
Quoted Standard GB/T 10001.1
Regulation (derived from) National Standards Bulletin 2013 No. 27
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the parachute open spaces should have the basic conditions and basic technical requirements. This standard applies to all types of skydiving community open spaces.

GB 19079.25-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 25: Parachuting place


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Operation conditions and technical requirements for gymnasium and playground.Part 25. Parachuting place ICS 97.220 Y55 National Standards of People's Republic of China Sports venues open conditions and technical requirements Part 25. skydiving place Part 25. Parachutingplace Issued on. 2013-12-31 2014-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

All technical content in this Part of GB 19079 is mandatory. GB 19079 "sports venues open conditions and technical requirements" is divided into the following sections. --- Part 1. swimming places; --- Part 2. Karting place; --- Part 3. Bungee place; --- Part 4. rock climbing places; --- Part 5. Skating place; --- Part 6. skiing; --- Part 7. figure skating place; --- Part 8. Shooting place; --- Part 9. Archery place; --- Part 10. Dive sites; --- Part 11. rafting place; --- Part 12. gliding wing place; --- Part 13. Balloon and Airship place; --- Part 19. expansion spaces; --- Part 20. hockey place; --- Part 21. Boxing place; --- Part 22. Taekwondo place; --- Part 23. trampoline place; --- Part 24. Aircraft movement places; --- Part 25. skydiving place; --- Part 26. aerospace model places; --- Part 27. Directional, radio direction finding places; --- Part 28. Sanda place; --- Part 29. climbing places; --- Part 30. Mountain outdoor venues; --- Part 31. Alpine Adventure venues; This section of Part 25 GB 19079. This section drafted in accordance with GB/T 1.1-2009 given rules. This section is proposed and managed by the State Sports General Administration. This section is drafted. State Sports General Administration of Sports Management Center aeronautical radio model, the State Sports General Administration of Sports Science Institute. The main drafters of this section. Wang Yongli, Zhang Angang, Zhang Hesheng, Han Fang Zhao, Li Rongrong, high Miao, Chen En Fu, Zhao Zhigang, Ding Jianping, For Pan. Sports venues open conditions and technical requirements Part 25. skydiving place

1 Scope

GB 19079 of the provisions of this part of the parachute open spaces should have the basic conditions and basic technical requirements. This section applies to all types of parachute open to the public place.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 10001.1 Public information graphical symbols - Part 1. Common symbols

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Parachuting place parachutingplace Able to meet the people to parachute training, competition venues, leisure and fitness activities. 3.2 Sport Parachute sportsparachute By the main parachute and parachute composition, made of flexible fabric foldable, work expanded to counteract the force of gravity to mount people Deceleration and return safely to the ground. 3.3 Parachutist parachutist Participants Skydiving. 3.4 Skydiving parachuting Parachutists jump from any aircraft using parachutes sports activities carried out in its entirety or in part, during the fall. 3.5 Skydiving technical guidance personnel parachutinginstructor Skydiving teach theory and skills of the staff.

4 Qualifying

Skydiving technical guidance personnel should hold the relevant national vocational qualification certificate before taking. 5 places, facilities and conditions 5.1 Landing Site 5.1.1 The length should be not less than 150m, a width of not less than 100m. 5.1.2 shall be flat, open, free of obstacles, endanger the safety of the site from the obstacle should not be less than 300m. 5.1.3 should be set clear dividing line between the landing site and the audience area. 5.2 parachuting equipment 5.2.1 shall sports parachute, altimeter and automatic parachute and other skydiving equipment. 5.2.2 The product shall comply with the relevant technical standards. 5.3 Auxiliary Facilities 5.3.1 should be space radio communications equipment. 5.3.2 shall be identified in the 500m highly visible landing site. 5.3.3 should wind speed, wind direction and pointing device.

6 Security

6.1 should establish and improve the safe production responsibility system for posts, rescue and safety management system, as well as equipment and facilities maintenance system system. 6.2 should develop plans for severe weather and emergency incidents, and regular practice drills. 6.3 shall be provided "Skydiving Safety" and safety warning prominently. 6.4 implementation of the relevant regulations should be skydiving. 6.5 should be equipped with at least two parachute technical guidance personnel. 6.6 should specify the age of 18 skydivers parachuting technical guidance by the staff with jumps. 6.7 parachutists should provide the necessary meteorological information. 6.8 should rescue vehicles, and equipped with drugs and rescue equipment.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 19079.25-2013_English be delivered?

Answer: Upon your order, we will start to translate GB 19079.25-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 2 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 19079.25-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB 19079.25-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.