|
US$149.00 ยท In stock Delivery: <= 2 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 19079.25-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 25: Parachuting place Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB 19079.25-2013 | English | 149 |
Add to Cart
|
2 days [Need to translate]
|
Operation conditions and technical requirements for gymnasium and playground -- Part 25: Parachuting place
| Valid |
GB 19079.25-2013
|
PDF similar to GB 19079.25-2013
Basic data | Standard ID | GB 19079.25-2013 (GB19079.25-2013) | | Description (Translated English) | Operation conditions and technical requirements for gymnasium and playground -- Part 25: Parachuting place | | Sector / Industry | National Standard | | Classification of Chinese Standard | Y55 | | Classification of International Standard | 97.220 | | Word Count Estimation | 5,591 | | Quoted Standard | GB/T 10001.1 | | Regulation (derived from) | National Standards Bulletin 2013 No. 27 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the parachute open spaces should have the basic conditions and basic technical requirements. This standard applies to all types of skydiving community open spaces. |
GB 19079.25-2013: Operation conditions and technical requirements for gymnasium and playground -- Part 25: Parachuting place ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Operation conditions and technical requirements for gymnasium and playground.Part 25. Parachuting place
ICS 97.220
Y55
National Standards of People's Republic of China
Sports venues open conditions and technical requirements
Part 25. skydiving place
Part 25. Parachutingplace
Issued on. 2013-12-31
2014-12-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
All technical content in this Part of GB 19079 is mandatory.
GB 19079 "sports venues open conditions and technical requirements" is divided into the following sections.
--- Part 1. swimming places;
--- Part 2. Karting place;
--- Part 3. Bungee place;
--- Part 4. rock climbing places;
--- Part 5. Skating place;
--- Part 6. skiing;
--- Part 7. figure skating place;
--- Part 8. Shooting place;
--- Part 9. Archery place;
--- Part 10. Dive sites;
--- Part 11. rafting place;
--- Part 12. gliding wing place;
--- Part 13. Balloon and Airship place;
--- Part 19. expansion spaces;
--- Part 20. hockey place;
--- Part 21. Boxing place;
--- Part 22. Taekwondo place;
--- Part 23. trampoline place;
--- Part 24. Aircraft movement places;
--- Part 25. skydiving place;
--- Part 26. aerospace model places;
--- Part 27. Directional, radio direction finding places;
--- Part 28. Sanda place;
--- Part 29. climbing places;
--- Part 30. Mountain outdoor venues;
--- Part 31. Alpine Adventure venues;
This section of Part 25 GB 19079.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This section is proposed and managed by the State Sports General Administration.
This section is drafted. State Sports General Administration of Sports Management Center aeronautical radio model, the State Sports General Administration of Sports Science Institute.
The main drafters of this section. Wang Yongli, Zhang Angang, Zhang Hesheng, Han Fang Zhao, Li Rongrong, high Miao, Chen En Fu, Zhao Zhigang, Ding Jianping,
For Pan.
Sports venues open conditions and technical requirements
Part 25. skydiving place
1 Scope
GB 19079 of the provisions of this part of the parachute open spaces should have the basic conditions and basic technical requirements.
This section applies to all types of parachute open to the public place.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 10001.1 Public information graphical symbols - Part 1. Common symbols
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Parachuting place parachutingplace
Able to meet the people to parachute training, competition venues, leisure and fitness activities.
3.2
Sport Parachute sportsparachute
By the main parachute and parachute composition, made of flexible fabric foldable, work expanded to counteract the force of gravity to mount people
Deceleration and return safely to the ground.
3.3
Parachutist parachutist
Participants Skydiving.
3.4
Skydiving parachuting
Parachutists jump from any aircraft using parachutes sports activities carried out in its entirety or in part, during the fall.
3.5
Skydiving technical guidance personnel parachutinginstructor
Skydiving teach theory and skills of the staff.
4 Qualifying
Skydiving technical guidance personnel should hold the relevant national vocational qualification certificate before taking.
5 places, facilities and conditions
5.1 Landing Site
5.1.1 The length should be not less than 150m, a width of not less than 100m.
5.1.2 shall be flat, open, free of obstacles, endanger the safety of the site from the obstacle should not be less than 300m.
5.1.3 should be set clear dividing line between the landing site and the audience area.
5.2 parachuting equipment
5.2.1 shall sports parachute, altimeter and automatic parachute and other skydiving equipment.
5.2.2 The product shall comply with the relevant technical standards.
5.3 Auxiliary Facilities
5.3.1 should be space radio communications equipment.
5.3.2 shall be identified in the 500m highly visible landing site.
5.3.3 should wind speed, wind direction and pointing device.
6 Security
6.1 should establish and improve the safe production responsibility system for posts, rescue and safety management system, as well as equipment and facilities maintenance system system.
6.2 should develop plans for severe weather and emergency incidents, and regular practice drills.
6.3 shall be provided "Skydiving Safety" and safety warning prominently.
6.4 implementation of the relevant regulations should be skydiving.
6.5 should be equipped with at least two parachute technical guidance personnel.
6.6 should specify the age of 18 skydivers parachuting technical guidance by the staff with jumps.
6.7 parachutists should provide the necessary meteorological information.
6.8 should rescue vehicles, and equipped with drugs and rescue equipment.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 19079.25-2013_English be delivered?Answer: Upon your order, we will start to translate GB 19079.25-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 2 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB 19079.25-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB 19079.25-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|