HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GA/T 2128-2024 English PDF

US$359.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GA/T 2128-2024: Evaluation index system for urban road network traffic operation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GA/T 2128-2024English359 Add to Cart 4 days [Need to translate] Evaluation index system for urban road network traffic operation Valid GA/T 2128-2024

PDF similar to GA/T 2128-2024


Standard similar to GA/T 2128-2024

GB/T 37471   GB/T 33577   GB/T 26773   GA/T 2099   GA/T 2014   GA/T 1202   

Basic data

Standard ID GA/T 2128-2024 (GA/T2128-2024)
Description (Translated English) Evaluation index system for urban road network traffic operation
Sector / Industry Public Security (Police) Industry Standard (Recommended)
Classification of Chinese Standard R87
Classification of International Standard 93.080.30
Word Count Estimation 18,142
Date of Issue 2024-02-20
Date of Implementation 2024-06-01
Issuing agency(ies) Ministry of Public Security

GA/T 2128-2024: Evaluation index system for urban road network traffic operation

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
GA/T 2128-2024 English version. Evaluation index system for urban road network traffic operation ICS 93.080.30 CCSR87 Public Security Industry Standard of the People's Republic of China Evaluation Index System of Traffic Operation Situation of Urban Road Network Released on 2024-02-20 2024-06-01 Implementation The Ministry of Public Security of the People's Republic of China issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Indicator system 2 5 Indicator Description 2 6 Analysis of the selection of evaluation indicators 4 7 Data requirements 5 Appendix A (Normative) Calculation of urban road network traffic operation status evaluation indicators 6 Reference 10

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the National Technical Committee for Road Traffic Management Standardization (SAC/TC576). This document was drafted by. Traffic Management Science Research Institute of the Ministry of Public Security, Beijing Baidu Netcom Technology Co., Ltd., and AutoNavi Software Co., Ltd. The main drafters of this document are. Hua Jingyi, Liu Dongbo, Gu Jingang, Fu Qiang, Si Yuqi, Li Ya, Li Xiangmin, and Su Yuelong. Evaluation Index System of Traffic Operation Situation of Urban Road Network

1 Scope

This document specifies the indicator system, indicator description, analysis theme, evaluation indicator selection, data and other aspects of the urban road network traffic operation situation assessment. Require. This document is applicable to the assessment of traffic operation status of urban road networks.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 29107 Road traffic information service traffic condition description GB/T 33171 Specification for evaluation of urban traffic operation status

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 urban built-up area Areas within the urban administrative area that have actually been developed and constructed and have basic municipal utilities and public facilities. [Source. GB/T 50280-1998, 3.0.6] 3.2 Urban road network urbanroadnetwork The roads of different functions, grades and locations within the urban built-up area or local road network are composed of a certain density and appropriate form. Network structure. [Source. GB/T 50280-1998, 4.6.5, modified] 3.3 peak hour peakhour In the morning or afternoon, the traffic volume on the urban road network is the highest for 60 consecutive minutes due to commuting and going to school. 3.4 Free flow speed free-flow speed The average travel speed of motor vehicles through a road section under low traffic volume and low density conditions. [Source. GB/T 33171-2016, 3.6] 3.5 vehicle kilometers travelled The cumulative mileage of all motor vehicles in a certain area. [Source. GB/T 33171-2016, 3.13]

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GA/T 2128-2024_English be delivered?

Answer: Upon your order, we will start to translate GA/T 2128-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GA/T 2128-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GA/T 2128-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.