| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GA/T 1191-2014 | English | 359 |
Add to Cart
|
3 days [Need to translate]
|
Guidelines for fire fighting of high-rise buildings
| Obsolete |
GA/T 1191-2014
|
PDF similar to GA/T 1191-2014
Standard similar to GA/T 1191-2014 GB 4066 GA 578 GB 5135.3 GA/T 998
Basic data | Standard ID | GA/T 1191-2014 (GA/T1191-2014) | | Description (Translated English) | Guidelines for fire fighting of high-rise buildings | | Sector / Industry | Public Security (Police) Industry Standard (Recommended) | | Classification of Chinese Standard | C83 | | Classification of International Standard | 13.220.10 | | Word Count Estimation | 8,816 | | Quoted Standard | GB 5907; GB/T 11651; GB/T 18664; GA 621 | | Regulation (derived from) | Notice on Publication of Public Safety Industry Standard (Year of 2014); Industry Standard Record Announcement No. 4 of 2015 (No. 184) | | Issuing agency(ies) | Ministry of Public Security | | Summary | This standard specifies the terms and definitions, general rules, fire-extinguishing operations and operational safety of high-rise building fire-fighting operations. This standard applies to public security fire brigade high-rise building fire fighting o |
GA/T 1191-2014: Guidelines for fire fighting of high-rise buildings---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guidelines for fire fighting of high-rise buildings
ICS 13.220.10
C83
People's Republic of China Public Security Industry Standards
High-rise building fire fighting action guide
Issued on. 2014-09-28
2014-09-28 implementation
People's Republic of China Ministry of Public Security
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard was proposed by the Ministry of Public Security Fire Department.
This standard by the National Standardization Technical Committee fire fighting and rescue Technical Committee (SAC/TC113/SC10) centralized.
This standard is mainly drafted by. Chinese People's Armed Police Force Academy.
Participated in the drafting of this Standard. Ministry of Public Security Fire Bureau, the Shanghai Public Security Fire Department, Jiangsu Province Public Security Fire Corps.
The main drafters of this standard. Wang Changjiang, Xiadeng You, Jiang Lianrui, business fixed by Liu Hao, Xue Jiao Cai Wu determined, Ma Hong, Weihan Dong, Zhu Xiaoli,
Zhang Qingli, Wang Heming, Ma Zhifeng Zhang AUO, Zhou Jianzhong, Li Hai.
This standard is the first release.
High-rise building fire fighting action guide
1 Scope
This standard specifies the terms and definitions of the high-rise building fire fighting operations, general principles, fighting actions and the security.
This standard applies to firefighting force to be high-rise building fire fighting action, a full-time fire brigade can be implemented by reference.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 5907 Fire basic terms of the first part
GB/T 11651 Personal protective equipment selection specification
GB/T 18664 respirator selection, use and maintenance
GA 621 firefighters equipped with standard personal protective equipment
3 Terms and Definitions
GB 5907 and defined the following terms and definitions apply to this document.
3.1
High-rise building high-risebuilding
Building height greater than 27m residential buildings and building height greater than the non-single factories, warehouses and other civil construction of 24m.
3.2
Fire fighting plan firefightingplan
For fire fighting objects may occur, for fire fighting prearranged plan of action.
3.3
Tiered response gradedresponse
Fire fighting force deployed combat formation and action by fire and emergency rescue grading regulations.
3.4
Cooperative Engagement coordinatedfirefighting
According headquarters of the unified deployment of the parties responsible for the division of the power of war, combat operations complement each other.
4 General
4.1 high-rise building fire fighting operations adhere to the "save first, scientific rescue" the guiding ideology.
4.2 high-rise building fire fighting action should follow "scenario support, tiered response; a solid-based, fixed-mobile integration; within the main attack, attack and defense both"
in principle.
4.3 high-rise building fire fighting action should be established as appropriate fire headquarters, unified leadership by the local government, public security fire brigade specific organization
And command, other units together, unit technicians and experts to provide technical support.
4.4 high-rise building fire fighting action should work to strengthen the combat service support for climbing, water supply and other operational aspects.
|