|
US$2059.00 · In stock Delivery: <= 11 days. True-PDF full-copy in English will be manually translated and delivered via email. GA/T 1049.2-2024: Communication protocol for integrated traffic command platform for public security - Part 2: Traffic signal control system Status: Valid GA/T 1049.2: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GA/T 1049.2-2024 | English | 2059 |
Add to Cart
|
11 days [Need to translate]
|
Communication protocol for integrated traffic command platform for public security - Part 2: Traffic signal control system
| Valid |
GA/T 1049.2-2024
|
| GA/T 1049.2-2013 | English | 1479 |
Add to Cart
|
7 days [Need to translate]
|
Communication protocol for integrated road traffic command platform--Part 2: Traffic signal control system
| |
GA/T 1049.2-2013
|
Basic data | Standard ID | GA/T 1049.2-2024 (GA/T1049.2-2024) | | Description (Translated English) | Communication protocol for integrated traffic command platform for public security - Part 2: Traffic signal control system | | Sector / Industry | Public Security (Police) Industry Standard (Recommended) | | Classification of Chinese Standard | Q87 | | Classification of International Standard | 93.080.79 | | Word Count Estimation | 102,126 | | Date of Issue | 2024-09-13 | | Date of Implementation | 2025-01-01 | | Older Standard (superseded by this standard) | GA/T 1049.2-2013 | | Issuing agency(ies) | Ministry of Public Security |
GA/T 1049.2-2024: Communication protocol for integrated traffic command platform for public security - Part 2: Traffic signal control system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 93.080.79
CCSQ87
Public Security Industry Standard of the People's Republic of China
Replaces GA/T 1049.2-2013
Public Security Traffic Integrated Command Platform Communication Protocol
Part 2.Traffic signal control systems
Released on 2024-09-13
2025-01-01 Implementation
The Ministry of Public Security of the People’s Republic of China issued
Table of contents
Preface III
Introduction V
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General technical requirements 1
4.1 General requirements 1
4.2 Operation Requirements 2
5 Data Object 3
5.1 Configuration Parameters 3
5.2 Operation Information 12
5.3 Control Commands 16
Appendix A (Informative) XML Schema 20
Appendix B (Normative) Definition of data objects in the information control system 73
B.1 Configuration parameter data object 73
B.2 Operational information data object 85
B.3 Control Command Data Object 91
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document is part 2 of GA/T 1049 "Communication Protocol for Public Security Traffic Integrated Command Platform".
Lower part.
--- Part 1.General;
--- Part 2.Traffic signal control systems;
--- Part 3.Traffic video surveillance system;
--- Part 4.Traffic flow information collection system;
--- Part 5.Traffic violation monitoring and recording system;
--- Part 6.Traffic information release system;
--- Part 7.Police vehicles and single police positioning systems;
--- Part 8.Traffic facility management system;
--- Part 9.Traffic incident collection system;
--- Part 10.Motor vehicle detection and control system;
--- Part 11.Ministry, province and city three-level command platform.
This document replaces GA/T 1049.2-2013 "Communication Protocol for Public Security Traffic Integrated Command Platform Part 2.Traffic Signal Control System
Compared with GA/T 1049.2-2013, in addition to structural adjustments and editorial changes, the main technical changes are as follows.
a) Deleted the terms and definitions of “traffic signal control system”, “sub-area”, “area”, “phase”, “stage”, “cycle” and “equivalent car”
(See 3.1, 3.3~3.8 of the.2013 edition);
b) Changed the protocol version number in the general requirements (see 4.1.2, 4.2.1 of the.2013 edition);
c) The logical relationship structure has been changed (see Figure 1, Figure 1 of the.2013 edition);
d) Added line parameters (see 5.1.5);
e) The sub-area parameters have been changed (see 5.1.6, 5.1.4 of the.2013 edition);
f) The intersection parameters have been changed (see 5.1.7, 5.1.5 of the.2013 edition);
g) The signal parameters have been changed (see 5.1.8, 5.1.6 of the.2013 edition);
h) The control import direction of the signal light group parameters has been changed (see 5.1.9, 5.1.7 of the.2013 edition);
i) The detector parameters have been changed (see 5.1.10, 5.1.8 of the.2013 edition);
j) Lane parameters have been changed (see 5.1.11, 5.1.9 of the.2013 edition);
k) Added pedestrian crossing parameters and signal group parameters (see 5.1.12 and 5.1.13);
l) The phase parameters have been changed (see 5.1.14, 5.1.11 of the.2013 edition);
m) The timing scheme parameters have been changed (see 5.1.15, 5.1.12 of the.2013 edition);
n) Added daily planning parameters and scheduling parameters (see 5.1.16 and 5.1.17);
o) The system status has been changed (see 5.2.1, 5.2.1 of the.2013 edition);
p) Deleted the regional status (see 5.2.2 of the.2013 edition);
q) The intersection control scheme has been changed (see 5.2.4, 5.2.5 of the.2013 edition);
r) The intersection phase has been changed (see 5.2.6, 5.2.7 of the.2013 edition);
s) Changed the light color status of the intersection signal group (see 5.2.7, 5.2.8 of the.2013 edition);
t) The intersection control scheme has been deleted (see 5.2.9 of the.2013 edition);
u) Added stage traffic flow data, variable guide lane status, trunk line control mode, trunk line section recommended speed, signal cabinet door status
State (see 5.2.9~5.2.13);
v) The specified control method scheme has been changed (see 5.3.2, 5.3.2 of the.2013 edition);
w) Deleted the designated control plan (see 5.3.3 of the.2013 edition);
x) Changed the locking of traffic flow direction and added locking types (see 5.3.3, 5.3.4 of the.2013 edition);
y) Added the functions of issuing center plans, setting timing plan parameters, setting daily plan parameters, setting scheduling parameters, stage intervention, setting
Function of changing the guide lane and retransmitting operation information (see 5.3.6~5.3.12);
z) The description of signal group parameter elements has been changed (see B.1.11, B.1.9 of the.2013 edition);
aa) The description of the stage number in the stage parameters has been changed (see Table B.13, Table B.16 of the.2013 edition);
bb) The description of the elements of the intersection phase has been changed (see B.2.6, B.2.7 of the.2013 edition).
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document is proposed and coordinated by the National Technical Committee for Road Traffic Management Standardization (SAC/TC576).
This document was drafted by. Traffic Management Science Research Institute of the Ministry of Public Security, Beijing Municipal Public Security Bureau Traffic Management Bureau, Wuxi Municipal Public Security Bureau, Wuxi
Huatong Intelligent Transportation Technology Development Co., Ltd., Nanjing Rice Information Technology Co., Ltd., Qingdao Hisense Network Technology Co., Ltd.,
Lianyungang Jerry Electronics Co., Ltd.
The main drafters of this document are. Xu Leng, Liu Chengsheng, Liu Dongbo, He Guangjin, Shu Aibing, Shen Hui, Yang Hao, Cheng Jian, Ma Xiaolong, Liu Jianhua, Zhao Yongjin,
Zhang Ren.
The previous versions of this document and the documents it replaces are as follows.
---First published in.2013 as GA/T 1049.2-2013;
---This is the first revision.
Introduction
The public security traffic integrated command platform is positioned at the upper layer of the business application system of the public security traffic command system. It needs to be connected with various business applications.
System communication, integration and calling of its functions to realize its own specific business functions. GA/T 1049 "Communication Protocol of Public Security Traffic Integrated Command Platform"
The purpose of the proposal is to standardize the data communication between the public security traffic integrated command platform and various business application systems, and to support the platform to effectively
Integration and coordination. Considering that the functions and data of each business application system are relatively independent, it is necessary to target each type of system characteristics under the overall framework.
Develop corresponding specific communication protocols.
GA/T 1049 is divided into 11 parts.
--- Part 1.General. Provides the architecture, general provisions, data packets, communication procedures, common operations and data objects of the communication protocol.
The purpose of this standard is to put forward technical requirements and standardize the common and common contents in the communication protocol.
--- Part 2.Traffic signal control system. Configuration parameters, operation information and control commands of traffic signal control system
According to the objects and the operations they support, technical requirements are proposed, aiming to realize the business functions of traffic signal control on the platform.
--- Part 3.Traffic video surveillance system. Configuration parameters, operation information and control commands of the traffic video surveillance system
According to the object, and the technical requirements for the operations it supports, the platform aims to realize real-time viewing, PTZ control, historical
History playback and other functions.
--- Part 4.Traffic flow information collection system. Configuration parameters, collection data, control commands of the traffic flow information collection system
The three types of data objects and the operations they support propose technical requirements, aiming to enable the platform to monitor the status of traffic flow detection equipment and collect
Access to traffic flow data.
--- Part 5.Traffic violation monitoring and recording system. Configuration parameters, operation information, control commands, and other aspects of the traffic violation monitoring and recording system.
The three types of data objects and the operations they support are proposed to implement the operation and maintenance of traffic violation monitoring and recording equipment on the platform.
manage.
--- Part 6.Traffic information publishing system. Configuration parameters, operation information and control commands of the traffic information publishing system
The technical requirements are put forward according to the objects and the operations they support, aiming to realize the release of traffic information with variable information signs as the main body on the platform.
Equipment operation and maintenance management and information release.
--- Part 7.Police vehicle and single police positioning system. Configuration parameters, operation information, control
The three types of data objects and the technical requirements for the operations they support are proposed, aiming to realize the management and
Scheduling.
--- Part 8.Traffic facility management system. Configuration parameters, operation information data objects and their support for traffic facility management systems
The platform is designed to realize the operation and maintenance of road traffic safety facilities and road traffic technical monitoring equipment.
manage.
--- Part 9.Traffic incident collection system. Configuration parameters, operation information data objects, and their support for the traffic incident collection system
The technical requirements for supported operations are proposed, aiming to realize the operation and maintenance management of traffic event collection equipment and the access of traffic event information on the platform.
--- Part 10.Motor vehicle detection and control system. Configuration parameters, operation information, control commands and other aspects of the motor vehicle detection and control system
Class data objects and the technical requirements for the operations they support are designed to enable the operation and maintenance of the highway vehicle intelligent detection and recording system on the platform
Management and detection and control of motor vehicles.
--- Part 11.Ministry, province and city three-level command platform. Configuration parameters, operation information, control commands and other aspects of the ministry, province and city three-level command platform
Class data objects and the technical requirements for the operations they support are intended to achieve basic traffic information between the ministry, province and city command platforms.
Cross-platform exchange of data such as ledgers, road communication status, important police situations, and collaborative processing.
Since the release and implementation of GA/T 1049.2-2013, GB/T 31418 "Terms of Road Traffic Signal Control Systems", GB 25280 "Terms of Road Traffic Signal Control Systems" and GB/T 31418 "Terms of Road Traffic Signal Control Systems" have been updated.
Traffic signal control machine", GB/T 39900 "General technical requirements for road traffic signal control systems" and other national standards for traffic signal control have been successively
The relevant contents of this document shall be updated synchronously when it is released or revised.
The functions of road traffic signal control systems are constantly expanding and improving, with traffic signals such as variable guide lanes, trunk line coordination, and bus priority.
New application scenarios for control, unified management and control of multi-signal control systems, and other new application requirements continue to emerge.
GA/T 1049.2-2013 was revised and improved to continuously adapt to new application scenarios and application requirements, ensuring the in-depth support of traffic signal control systems.
Chemical application.
Communication protocol of public security traffic integrated command platform
Part 2.Traffic signal control systems
1 Scope
This document specifies the communication protocol between the public security traffic integrated command platform and the information layer of the traffic signal control system.
This document is applicable to the design and development of public security traffic integrated command platform and traffic signal control system software.
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB 25280-2016 Road traffic signal controller
GB/T 31418-2015 Terminology of road traffic signal control systems
GB/T 39900-2021 General technical requirements for road traffic signal control systems
GA/T 380-2012 Rules for the compilation of organization codes for public security organs nationwide
GA/T 543.6 Public Security Data Element (6)
GA/T 543.9 Public Security Data Element (9)
GA/T 543.10 Public Security Data Element (10)
GA/T 1049.1-2013 Public Security Traffic Integrated Command Platform Communication Protocol Part 1.General
3 Terms and definitions
The terms and definitions defined in GB/T 31418-2015, GA/T 1049.1-2013 and the following apply to this document.
3.1
A road intersection where traffic of vehicles and pedestrians is controlled by traffic lights.
3.2
The basic parameters that need to be set for the normal operation of the traffic signal control system.
Note. Configuration parameters mainly include road traffic signal controllers, areas, sub-areas, signal-controlled intersections, detectors, lanes, signal groups, stages and timing plans, etc.
4 General technical requirements
4.1 General requirements
4.1.1 The Public Security Traffic Integrated Command Platform (hereinafter referred to as the “Integrated Command Platform”) and the Traffic Signal Control System (hereinafter referred to as the “Signal Control System”) are connected to the
The letter should comply with the requirements of 5.1 to 5.3 of GA/T 1049.1-2013.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA/T 1049.2-2024_English be delivered?Answer: Upon your order, we will start to translate GA/T 1049.2-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 7 ~ 11 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA/T 1049.2-2024_English with my colleagues?Answer: Yes. The purchased PDF of GA/T 1049.2-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GA/T 1049.2-2024?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GA/T 1049.2-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|