Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GA 942-2011English519 Add to Cart 3 days [Need to translate] Technical requirements for the smoke-heat training facility with mesh fence Obsolete GA 942-2011

PDF similar to GA 942-2011


Standard similar to GA 942-2011

GB 4066   GA 578   GB 5135.3   GA/T 998   

Basic data

Standard ID GA 942-2011 (GA942-2011)
Description (Translated English) Technical requirements for the smoke-heat training facility with mesh fence
Sector / Industry Public Security (Police) Industry Standard
Classification of Chinese Standard C83
Classification of International Standard 13.220.10
Word Count Estimation 12,127
Date of Issue 2011-06-13
Date of Implementation 2011-07-01
Quoted Standard GA/T 623; GB/T 20028
Regulation (derived from) Chemical plant fire accident handling training facilities, technical requirements and other three industry standards; industry standard filing notice No. 4 in 2012 (total 148)
Issuing agency(ies) Ministry of Public Security
Summary This standard specifies the terminology and definition, system composition, technical requirements, safety requirements and acceptance of the grid-partitioned smoke and heat training room. This standard is applicable to the design, construction and acceptance of grid-cut smoke and heat training room.

GA 942-2011: Technical requirements for the smoke-heat training facility with mesh fence

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements for the smoke-heat training facility with mesh fence ICS 13.220.10 C83 People's Republic of China Public Security Industry Standards Grid shut-off smoke and heat training room Technical Requirements Issued on. 2011-06-13 2011-07-01 implementation People's Republic of China Ministry of Public Security

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 system consisting of 2 5 2 Technical Requirements 7 6 Safety requirements 7 7 Acceptance Appendix A (normative) grid shut-off smoke and heat training room table 9 final acceptance report

Foreword

Chapter 6 of this standard are mandatory, the rest are recommended. This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard was proposed by the Ministry of Public Security Fire Department. This standard by the National Standardization Technical Committee fire fighting and rescue Technical Committee (SAC/TC113/SC10) centralized. This standard is drafted by. Chinese People's Armed Police Force Academy. Participated in the drafting of this standard. Fushun Fu Yun-meter Lifesaving Equipment Co., Ltd. The main drafters. Zhang Xuekui, Yang Xing, Zhang Fudong, Lu Lihong, Wang Dongwu, flowers Zhang Ying, Yue Geng Ji, Ji-wei, the Soviet camp, Zhou Zhizhong. This standard is the first release. Grid shut-off smoke and heat training room Technical Requirements

1 Scope

This standard specifies the terms and definitions grid on isolated smoke and heat training room, system components, technical requirements, safety requirements and acceptance. This standard applies to grid shut-off smoke and heat training room design, construction and acceptance.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GA/T 623 Fire Training Base training facility construction standards GB/T 20028 vulcanized rubber or thermoplastic rubber applications A tired Nieuwpoort Stuttgart projected life expectancy and the highest temperature

3 Terms and Definitions

GA/T 623 as well as to determine the following terms and definitions apply to this document. 3.1 Grid shut-off smoke and heat training room smoke-heattrainingfacilitywithmeshfence Utilization grid off in the limited space of a certain size channel training enables trainees in smoke, heat, noise and other analog fire Under health conditions, according to pre-set procedures, the proper use of equipment to complete, through a variety of obstacles, set up a temporary danger, perform any rescue Personal service and stable breathing gas consumption measurement training facilities and the room in general. 3.2 Channel grid system channelsystemwithmeshfence Combination of modular grid made of two or three sturdy cage, which offers training channel formed by a variety of barriers to travel, is the training department EC carrier. 3.3 Synchronous tracking system synchronoustrackingsystem Using the corresponding sensing device can be simultaneously displayed in the centralized control system trainee position for real-time monitoring, tracking the whereabouts of trainees Subsystem. 3.4 Smoke thermal simulation system smoke-heatsimulatingsystem By the smoke, heat, smoke Drainage equipment and the corresponding control device consisting of smoke and heat condition simulated fire environment subsystems. 3.5 Sound and light simulation system sound-lightsimulatingsystem Sound effects can be simulated disaster site and luminous scene subsystems. 3.6 Centralized control system centralizedcontrolsystem The control room of the main console, electrical control box, computer and monitor equipment components, centralized control can training facilities, command and monitoring Training subsystems.