GA 587-2005: Maintenance for fire equipment in building
Status: Obsolete
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GA 587-2005English599 Add to Cart 3 days [Need to translate] Maintenance for fire equipment in building Obsolete GA 587-2005

PDF similar to GA 587-2005


Standard similar to GA 587-2005

GB/T 9978.1   GB/T 7633   GA/T 537   

Basic data

Standard ID GA 587-2005 (GA587-2005)
Description (Translated English) Maintenance for fire equipment in building
Sector / Industry Public Security (Police) Industry Standard
Classification of Chinese Standard C82
Classification of International Standard 13.220.20
Word Count Estimation 15,142
Date of Issue 2005-12-26
Date of Implementation 2006-05-01
Regulation (derived from) Industry Standards Bulletin 2006 No. 2 (No. 74)
Summary This standard stipulates the technical requirements for the maintenance and management of fire-fighting facilities in buildings and provides methods. This standard is applicable to the maintenance management of building fire facilities.

GA 587-2005: Maintenance for fire equipment in building

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Maintenance for fire equipment in building ICS 13.220.20 C82 People's Republic of China Public Safety Industry Standard Maintenance management of building fire protection facilities Released on December 12,.2005 2006-05-01 implementation Ministry of Public Security

Content

Foreword I Introduction II 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General 1 5 Fire Control Room 2 6 inspection 2 7 single item inspection 3 8 linkage check 3 9 Checking test tools and equipment 4 10 Maintenance and Troubleshooting 4 11 file 4 Appendix A (Normative Appendix) Construction Fire Protection Facilities Maintenance Management Record Table 5

Foreword

4.1, 4.3, 4.4, 5, 6.1, 7.1, 8.1, 10, and 11 of this standard are mandatory provisions, and the rest are recommended. Article. Appendix A of this standard is a normative appendix. This standard was proposed by the Fire Department of the Ministry of Public Security. This standard is under the jurisdiction of the Ninth Technical Committee of the National Fire Protection Standardization Committee (SAC/TC113/SC9). This standard was drafted. Fire Department of the Ministry of Public Security, Fire Department of the Jiangsu Provincial Public Security Department. The main drafters of this standard. Li Shuhui, Liu Jiyang, Ding Yuping.

Introduction

Building fire protection facilities set up in accordance with relevant national laws and regulations and national engineering construction fire protection technical standards are fire prevention and timely rescue Effective measures to start a fire. Implement maintenance and management of building fire protection facilities to ensure their integrity and effectiveness, and is the property rights, management and use list of buildings. Statutory duties. In order to guide and standardize the maintenance and management of building fire protection facilities, ensure that the building fire protection facilities are in good condition, according to the country. This standard is formulated in accordance with the technical standards for fire protection. Maintenance management of building fire protection facilities

1 Scope

This standard specifies the technical requirements for the maintenance and management of building fire protection facilities and provides methods. This standard applies to the maintenance and management of building fire protection facilities.

2 Normative references

The terms in the following documents become the terms of this standard by reference to this standard. All dated references, followed by all Modifications (not including errata content) or revisions do not apply to this standard, however, parties to agreements based on this standard are encouraged to study Is it possible to use the latest version of these files? For undated references, the latest edition applies to this standard. GB/T 14107 Basic Terms of Fire Fighting Part II GA 502 fire supervision technical equipment GA 503 Building Fire Protection Facilities Testing Technical Regulations

3 Terms and definitions

The following terms and definitions as defined in GB/T 14107 apply to this standard. 3.1 Inspection of the visual properties of building fire protection facilities. 3.2 Conduct technical testing of individual functions of various types of building fire protection facilities in accordance with relevant standards. 3.3 According to the relevant standards, the joint function test and comprehensive technical evaluation of all types of fire protection facilities in the whole building shall be carried out.

4 General

4.1 The management of building fire protection facilities should clarify the responsibilities of the competent departments and relevant personnel and establish a sound management system. 4.2 Building fire protection facilities inspection is divided into three methods. inspection, single inspection and linkage inspection. 4.3 The technical requirements and inspection methods for inspection, single inspection and linkage inspection of building fire protection facilities shall comply with the relevant provisions of GA 503. 4.4 Management requirements. a) The inspection of building fire protection facilities can be carried out by the department that manages the fire protection facilities, or according to the actual situation of work, production and operation. In this case, the duties of the inspection will be carried out to relevant jobs. b) Technical personnel engaged in single inspection and linkage inspection of construction fire protection facilities shall pass the fire safety examination and be certified to work. The unit has professional technicians and testing equipment for single inspection and linkage inspection of building fire protection facilities, which can be in accordance with this standard. It may be implemented on its own, or it may entrust a unit with the qualification of fire detection agency service or have the qualification for installation of the corresponding fire protection facilities. The unit is implemented in accordance with this standard. c) The joint inspection record of the building fire protection facilities and the linkage inspection record of the building fire protection facilities shall be signed by the inspection personnel and the inspection unit. chapter. The inspection and inspection records of the building fire protection facilities and the linkage inspection of the building fire protection facilities issued by the testing personnel and the testing unit Record (see Appendix A) is responsible.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GA 587-2005_English be delivered?

Answer: Upon your order, we will start to translate GA 587-2005_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GA 587-2005_English with my colleagues?

Answer: Yes. The purchased PDF of GA 587-2005_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.