HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

DZ/T 0148-2014 English PDF

US$2189.00 ยท In stock
Delivery: <= 13 days. True-PDF full-copy in English will be manually translated and delivered via email.
DZ/T 0148-2014: The specification for hydrogeological well drilling
Status: Valid

DZ/T 0148: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
DZ/T 0148-2014English2189 Add to Cart 13 days [Need to translate] The specification for hydrogeological well drilling Valid DZ/T 0148-2014
DZ/T 0148-1994EnglishRFQ ASK 11 days [Need to translate] Specification for hydrological geology drilling Obsolete DZ/T 0148-1994

PDF similar to DZ/T 0148-2014


Standard similar to DZ/T 0148-2014

YS/T 514.1   MT/T 1091   DZ/T 0206   DZ/T 0425   DZ/T 0426   DZ/T 0307   

Basic data

Standard ID DZ/T 0148-2014 (DZ/T0148-2014)
Description (Translated English) The specification for hydrogeological well drilling
Sector / Industry Geological Industry Standard (Recommended)
Classification of Chinese Standard D14
Classification of International Standard 73.100.30
Word Count Estimation 89,862
Date of Implementation 12/1/2014
Older Standard (superseded by this standard) DZ/T 0148-1994
Quoted Standard GB/T 5005; GB 6722; GB 15848; GB/T 18376.2; GB 50202; AQ 2004-2005; DZ/T 0055; DZ/T 0056; DZ/T 0106; DZ/T 0227
Regulation (derived from) Ministry of Land & Resources Notice 2014 No. 14
Issuing agency(ies) Ministry of Land and Resources
Summary This Standard specifies the operational requirements of the Water Well gist of the technical work of geological drilling and production activities related processes. This Standard applies to the hydrogeological survey, hydrological and geological explorat

DZ/T 0148-2014: The specification for hydrogeological well drilling

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
The specification for hydrogeological well drilling ICS 73.100.30 D14 People's Republic of China geological mineral industry standard Replacing DZ/T 0148-1994 Hydrological well drilling geological drilling procedures Published on.2014-09-22 2014-12-01 implementation Ministry of Land and Resources of the People's Republic of China

Content

Foreword V 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Basic requirements 3 4.1 Basic Principles 3 4.2 Drilling type and drilling depth division 4 4.3 Drilling caliber series 4 4.4 Drilling (well) structure 5 4.5 Drilling Method Classification 6 4.6 Drilling method selection 6 5 Drilling construction design 6 5.1 Preparation and Change Requirements 6 5.2 Drilling construction design main content 6 6 equipment, instruments 9 6.1 Equipment selection 9 6.2 Instrument Selection 11 6.3 Equipment Installation, Disassembly and Removal 11 6.4 Equipment and instrument use 12 7 Construction preparation and openings 16 7.1 Construction Preparation 16 7.2 Opening 16 8 core drilling 17 8.1 Ordinary Carbide Drilling 17 8.2 Needle Carbide Drilling 18 8.3 Diamond composite drilled 19 8.4 Diamond Drilling 19 8.5 Hydraulic Impact Rotary Drill 20 8.6 Pneumatic DTH Hammer Core Drilling 21 9 full drilling 22 9.1 Wire rope impact drilling 22 9.2 Drill bit drill 23 9.3 Roller bit drilling 24 9.4 Pneumatic DTH Hammer Drilling 26 9.5 Gas lift reverse circulation drilling 29 9.6 Pumping Reverse Circulation Drilling 30 9.7 Pneumatic DTH Hammer Synchronous with Pipe Drilling 31 10 reaming drilling 32 10.1 Alloy drill bit reaming drilling 32 10.2 Roller drill bit reaming drilling 33 10.3 Pneumatic DTH Hammer Reaming Drilling 33 11 Core, Sampling and Geological Cataloging 34 11.1 Geotechnical Coring, Sampling and Geological Cataloging 34 11.2 Groundwater sampling 36 12 flushing fluid 36 12.1 Types and Choices 36 12.2 Common Materials and Chemical Treatments 37 12.3 Main Performance Indicators and Test Methods for Flushing Fluids 37 12.4 Preparation and management of rinses 37 13 Chengjing Process 38 13.1 Logging 38 13.2 Lower tube preparation and basic requirements 39 13.3 Well pipe selection 39 13.4 Lower tube method selection 41 13.5 Lower tube operation requirements 42 13.6 Gravel 43 13.7 Water stop and closure 45 13.8 Washing Well 46 13.9 Pumping test 49 14 Water Enhancement Method 50 14.1 Blasting in the hole, cracking and increasing water 50 14.2 Fracturing water increase 50 14.3 Hydrochloric acid washing wells increased water 51 15 Special water intake method 52 15.1 Large well-radiation well water withdrawal 52 15.2 Horizontal well water intake 53 15.3 Seepage wells take water 55 16 Accident prevention and treatment in the hole 57 16.1 Accident classification in the hole 57 16.2 Basic principles for preventing accidents in the hole 57 16.3 Prevention and Treatment of Drilling Loss Accidents 57 16.4 Cards, Collapse, Buried, Burning Drill Accident Prevention and Treatment 58 16.5 Prevention and treatment of drill breakage, shedding and running accidents 59 16.6 sets of (well) tube accident prevention and treatment 60 16.7 Holes fall into the tool object processing 61 16.8 Logging Accident Prevention and Treatment 61 16.9 Gravel Blockage Accident Treatment 61 16.10 Accident Handling Safety Regulations 61 17 tube well repair 62 17.1 Basic Requirements 62 17.2 Common Tube Well Damage Forms 62 17.3 Tube Well Detection 62 17.4 Tube Well Repair 62 18 Project Quality 64 18.1 Basic requirements for project quality 64 18.2 Engineering Quality Assurance Measures 66 18.3 Project Quality Acceptance and Assessment 68 19 Health, Safety, and Environmental Protection (HSE) Management 69 19.1 Health Management 69 19.2 Security Management 69 19.3 Environmental Protection Management 70 20 Construction Technology Report and Drilling Technical File 71 20.1 Construction Technology Report 71 20.2 Drilling Technical File 72 Appendix A (Normative Appendix) Table for Hydrogeological Well Drilling References 83

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. Compared with DZ/T 0148-1994, this standard is subject to the following technical changes as follows. --- Added terms and definitions; --- Increased diamond drilling and diamond composite drilling; --- Increased the core, sampling and geological cataloging conditions of geotechnical; ---Adding special water extraction methods to chapters, including horizontal wells and seepage wells and other water intake engineering techniques; --- Increased technical parameters of the gravel filter and filter filter filter technical parameters; --- Increased water well fracturing technology; --- Added chapter on tube well detection and repair; --- Added some new materials and new equipment operating regulations; --- Added a common form format for drilling water wells such as drilling construction design books and drilling class reports; --- Removed drill bit drilling, alloy drilling and particle mixing drilling, jet reverse circulation drilling, special drilling technology and drilling process, etc.; --- The order of the chapters was partially adjusted according to the hydrological drilling procedure. This standard was proposed by the Ministry of Land and Resources of the People's Republic of China. This standard is under the jurisdiction of the National Land Resources Standardization Technical Committee (SAC/TC93). This standard was drafted. Hydrogeological Environmental Geological Survey Center of China Geological Survey. The main drafters of this standard. Zheng Jitian, Li Bingping, Wu Kangcheng, Chen Xingqing, Tang Songran, Ye Chengming, Li Xiaojie, Liu Yingjuan, Guan Xiaolin. The previous versions of the standards replaced by this standard are. ---DZ/T 0148-1994. Hydrological well drilling geological drilling procedures

1 Scope

This standard stipulates the technical work requirements for the various production activities of geological drilling of hydrological wells and the operational points of the relevant processes. This standard applies to hydrogeological surveys, hydrogeological surveys and wells (without geothermal wells) drilling projects.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 5005 drilling fluid material specification GB 6722 blasting safety regulations GB 15848 uranium mine geological exploration radiation protection and environmental protection regulations GB/T 18376.2 Carbide grades Part 2. Carbide grades for geological and mining tools GB 50202 Code for construction quality acceptance of building foundation engineering AQ2004-2005 Geological Exploration Safety Regulations DZ/T 0055 Carbide drill bit for hydrology well drilling DZ/T 0056 Drill Bits for Hydrological Well Drilling DZ/T 0106 casing for hydro-water well drilling, core tube, powder pipe thread DZ/T 0227 Geological Core Drilling Procedure

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Hydrological drilling hydro-geologicaldriling Drilling work for the purpose of hydrogeological surveys. [GB 9151-1988, definition 3.2] 3.2 Water well drilling waterweldriling Drilling work for the purpose of developing groundwater resources. [GB 9151-1988, definition 3.3] 3.3 Core drill into coredriling Drilling methods and processes for the purpose of taking cylindrical rock cores. Synonym. "core drilling". [GB 9151-1988, definition 2.2.1] 3.4 Fully drilled into non-coredriling Drilling method and process for comprehensively breaking the bottom rock (soil). Note. Rewrite GB 9151-1988, definition 2.2.2.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of DZ/T 0148-2014_English be delivered?

Answer: Upon your order, we will start to translate DZ/T 0148-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 9 ~ 13 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of DZ/T 0148-2014_English with my colleagues?

Answer: Yes. The purchased PDF of DZ/T 0148-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version DZ/T 0148-2014?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version DZ/T 0148-2014 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.