HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

DL/T 5453-2020 English PDF

US$1789.00 ยท In stock
Delivery: <= 9 days. True-PDF full-copy in English will be manually translated and delivered via email.
DL/T 5453-2020: Technical code for the design of series compensator station
Status: Valid

DL/T 5453: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
DL/T 5453-2020English1789 Add to Cart 9 days [Need to translate] Technical code for the design of series compensator station Valid DL/T 5453-2020
DL/T 5453-2012EnglishRFQ ASK 10 days [Need to translate] Technical code for design of series compensator station Obsolete DL/T 5453-2012

PDF similar to DL/T 5453-2020


Standard similar to DL/T 5453-2020

DL/T 5155   DL/T 5218   DB44/26   DL/T 5463   DL/T 5451   DL/T 5461.17   

Basic data

Standard ID DL/T 5453-2020 (DL/T5453-2020)
Description (Translated English) Technical code for the design of series compensator station
Sector / Industry Electricity & Power Industry Standard (Recommended)
Classification of Chinese Standard P62
Classification of International Standard 29.240
Word Count Estimation 83,878
Date of Issue 2020-10-23
Date of Implementation 2021-02-01
Older Standard (superseded by this standard) DL/T 5453-2012
Quoted Standard GB 50016; GB 50019; GB/T 50064; GB/T 50065; GB 50116; GB 50140; GB 50217; GB 50229; GB 50260; GB 50697; GB/T 51200; GB/T 311.1; GB/T 311.2; GB/T 1094.6; GB 3096; GB/T 6115.1; GB/T 6115.2; GB/T 6115.3; GB/T 6115.4; GB 12348; GB/T 14285; GB/T 28565; GB/T 34
Issuing agency(ies) National Energy Administration
Summary This standard is applicable to the design of series compensation station projects with voltage levels ranging from 220kV to 1000kV. The design of the series compensation station should implement the country's basic construction guidelines and technical and economic policies. The design of the series compensation station should be combined with the regional characteristics, and new technologies, new materials, and new processes should be actively and cautiously adopted. The design of the series compensation station must comply with the relevant national laws and regulations, adhere to the principle of saving land, and adopt effective environmental protection and water and soil conservation prevention and control measures. Engineering facilities for environmental protection and soil and water conservation must be designed, constructed and put into production at the same time as the main project. When the series compensation station is adjacent to the existing substation construction, the

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of DL/T 5453-2020_English be delivered?

Answer: Upon your order, we will start to translate DL/T 5453-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of DL/T 5453-2020_English with my colleagues?

Answer: Yes. The purchased PDF of DL/T 5453-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version DL/T 5453-2020?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version DL/T 5453-2020 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.