HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

DL/T 475-2017 English PDF

US$629.00 ยท In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
DL/T 475-2017: Guide for measurement of grounding connection parameters
Status: Valid

DL/T 475: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
DL/T 475-2017English629 Add to Cart 6 days [Need to translate] Guide for measurement of grounding connection parameters Valid DL/T 475-2017
DL/T 475-2006English719 Add to Cart 3 days [Need to translate] Guide for measurement of grounding connection parameters Obsolete DL/T 475-2006
DL 475-1992EnglishRFQ ASK 3 days [Need to translate] (Measuring guide grounding device parameters of the power frequency) Obsolete DL 475-1992

PDF similar to DL/T 475-2017


Standard similar to DL/T 475-2017

GB/T 7595   DL/T 911   DL/T 805.2   DL/T 309   DL/T 266   DL/T 467   

Basic data

Standard ID DL/T 475-2017 (DL/T475-2017)
Description (Translated English) Guide for measurement of grounding connection parameters
Sector / Industry Electricity & Power Industry Standard (Recommended)
Classification of Chinese Standard F24
Classification of International Standard 29.240.01
Word Count Estimation 27,262
Date of Issue 2017-08-02
Date of Implementation 2017-12-01
Older Standard (superseded by this standard) DL/T 475-2006
Quoted Standard GB/T 50065-2011; DL/T 253-2012; DL/T 741; DL/T 887-2004
Regulation (derived from) National Energy Board Notice 2017 No. 8; Industry Standard Filing Announcement 2017 No. 12 (Total No. 216)
Issuing agency(ies) National Energy Administration
Summary This standard specifies the general principles, contents, methods, criteria and cycles of grounding device characteristic parameters and soil resistivity testing. This standard is applicable to the handover acceptance of power plants, substations, converter stations and DC grounding poles, booster stations for wind power generation systems, and grounding devices such as wind turbines, photovoltaic power plants, energy storage power stations, electrified railway traction stations, and transmission line towers. Tests, condition assessments and preventive (routine) tests of grounded equipment have been carried out, and grounding device tests related to lightning protection. The characteristic parameter test of other grounding devices such as communication facilities and buildings can be referred to for execution.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of DL/T 475-2017_English be delivered?

Answer: Upon your order, we will start to translate DL/T 475-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of DL/T 475-2017_English with my colleagues?

Answer: Yes. The purchased PDF of DL/T 475-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version DL/T 475-2017?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version DL/T 475-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.