|
US$469.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. CJ/T 300-2013: Water hammer arrestor for water supply systems of buildings Status: Valid CJ/T 300: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| CJ/T 300-2013 | English | 469 |
Add to Cart
|
3 days [Need to translate]
|
Water hammer arrestor for water supply systems of buildings
| Valid |
CJ/T 300-2013
|
| CJ/T 300-2008 | English | 799 |
Add to Cart
|
5 days [Need to translate]
|
Water hammer arrestor for water supply systems of buildings
| Obsolete |
CJ/T 300-2008
|
PDF similar to CJ/T 300-2013
Basic data | Standard ID | CJ/T 300-2013 (CJ/T300-2013) | | Description (Translated English) | Water hammer arrestor for water supply systems of buildings | | Sector / Industry | Urban Construction Industry Standard (Recommended) | | Classification of Chinese Standard | P41 | | Classification of International Standard | 91.140.01 | | Word Count Estimation | 18,183 | | Older Standard (superseded by this standard) | CJ/T 300-2008 | | Quoted Standard | GB 150.1; GB 150.2; GB 150.3; GB 150.4; GB/T 196; GB/T 197; GB/T 1047; GB/T 1048; GB/T 3098.1; GB/T 3098.2; GB/T 3098.3; GB/T 3098.4; GB/T 3098.5; GB/T 3098.6; GB/T 3098.7; GB/T 3098.8; GB/T 3098.9; GB/T 3098.10; GB/T 3098.11; GB/T 3098.12; GB/T 3098.13; | | Regulation (derived from) | Department of Housing and Urban-Rural Development Bulletin No. 21; industry standard filing Notice 2013 No. 7 (No. 163 overall) | | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China | | Summary | This standard specifies: Construction to absorb water of the hammer (hereinafter referred to absorb device) Terminology and definitions, structure type, product type, materials, requirements, test methods, inspection rules, marking and product specificati |
CJ/T 300-2013: Water hammer arrestor for water supply systems of buildings---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Water hammer arrestor for water supply systems of buildings
ICS 91.140.01
P41
People's Republic of China urban construction industry standards
Replacing CJ/T 300-2008
Construction water hammer absorbers
2013-04-27 released
2013-10-01 Implementation
Ministry of Housing and Urban-Rural Development, People's Republic of China released
Directory
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 structure type 2
5 Product Model 2
6 material 2
7 Requirements 3
8 Test Method 4
9 inspection rules 5
10 logo and product manual 6
11 Packaging and storage 7
Appendix A (informative) structure type diagram 8
Appendix B (informative) model number 12
Appendix C (Informative) Absorber performance test equipment and test procedures 13
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is CJ/T 300-2008 "building water hammer absorbers," the amendment. This standard compared with CJ/T 300-2008, the main
To technical changes are as follows.
--- Removed the original preamble equivalent to the use of the American Society of Sanitation Engineering ASSE1010-2004 "water hammer absorbers performance requirements"
Expression
--- Modify the scope of application of nominal pressure;
--- Modify the normative references in the introductory language and normative references made changes;
--- Modify the definition of buffer pressure chamber and buffer pressure chamber volume;
--- Modify the term "maximum working pressure" as "system pressure" and redefine;
--- Modify the "preset inflation pressure" and "pressure relief buffer chamber" definition;
--- Increased copper alloy shell material;
--- Modify the structure of the absorber type of classification;
--- Removed the "Materials" section of the original table 2 and Table 3;
--- Modify the water hammer maximum allowable peak pressure calculation. P2 = 1.3P1;
--- Modify the absorption capacity of water hammer absorbers should be less than 1.3 times the system pressure;
--- Increased the appearance of inspection as a factory inspection project;
--- Removed the "Sampling" chapter of the original table 5;
--- Modify the original 9.2.1d) medium-sized inspection of the inspection period (from five years to three years);
--- Deleted Appendix A screwdriver gut-type water hammer absorber Original Figure A.2, flange-mounted gutter type water hammer absorber Figure A.5
And Gall bladder buffer gas pressure chamber without pre-pressure water hammer absorber original A.8, and modify the terms of the statement;
--- Modify and complete Appendix B model structure of the type of formulation;
--- Removed the original Appendix C;
--- Modify the original appendix D close the valve to close the entire time T of the formula (D.1) for the type (C.1) (Inequality in the parent bracket
Add a sum of factor U) and change Appendix D to Appendix C.
This standard in the revision process, the buffer pressure chamber is not filled with pre-pressure water hammer absorbers structure type, working conditions, and its corresponding
Buffer pressure chamber volume, absorption performance and other parameters are equivalent to the United States Water Supply and Drainage Association PDI-WH201-2010 "water hammer absorber."
This standard proposed by the Ministry of Housing and Urban Standard and Design Institute.
This standard by the Ministry of Housing and Urban Water Supply and Drainage Municipal Standardization Technical Committee centralized.
This standard was drafted. Guangdong Yongquan Valve Technology Co., Ltd., Guangdong Cast Tak Industrial Co., Ltd., Beijing Yongquan Tengda valve technology
Limited company.
The main drafters of this standard. Chen Jianming, Liang Jianlin, Wu Bai Min, Cheng Yuanjun, Pan Qingxiang, Chen Yanming.
This standard replaces the standards previously issued as follows.
--- CJ/T 300-2008.
Construction water hammer absorbers
1 Scope
This standard specifies the construction of water hammer absorbers (hereinafter referred to as absorbers) terms and definitions, structure type, product type, material, to
Requirements, test methods, inspection rules, signs and product specifications and packaging and storage.
This standard applies to the nominal size of DN15 ~ DN400, the nominal pressure is not greater than PN50, temperature 0 ℃ ~ 70 ℃ of building water supply
Hammer absorber.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB 150 (all parts) pressure vessels
GB/T 196 ordinary thread basic size
GB/T 197 ordinary thread tolerances
GB/T 1047 pipe element DN (nominal size) of the definition and selection
GB/T 1048 pipe element PN (nominal pressure) definition and selection
GB/T 3098 (all parts) Fastener mechanical properties
GB/T 7306.2 55 ° sealing pipe threads - Part 2. Female and female conical taper threads
GB/T 9112 steel pipe flange type and parameters
GB/T 9124 steel pipe flanges technical conditions
GB/T 9969 Industrial Products Manual General
GB/T 12220 common valve logo
GB/T 12225 common valve copper alloy castings technical conditions
GB/T 12230 general valve stainless steel castings technical conditions
GB/T 13927 industrial valve pressure test
GB/T 20878 stainless steel and heat-resistant steel grades and chemical composition
GB/T 21873 rubber seal to the drain pipe and sewer pipe interface seal material specifications
JB/T 308 valve model preparation methods
JB/T 7928 general valve supply requirements
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Waterhammer for building water hammer absorbers waterhammerarrestorforwatersupplysystemofbuildings
Water barriers are dampened by a sealed buffer plenum to prevent water mains and facilities from being damaged by water hammer.
3.2
Cushioning pressure chamber cushioningairpressurechamber
According to the different absorber structure, are defined as.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of CJ/T 300-2013_English be delivered?Answer: Upon your order, we will start to translate CJ/T 300-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of CJ/T 300-2013_English with my colleagues?Answer: Yes. The purchased PDF of CJ/T 300-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version CJ/T 300-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version CJ/T 300-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|