YS/T 497-2005 PDF English
Price & Delivery
US$1669.00 · In stock · Download in 9 secondsYS/T 497-2005: Business accounting specification for the service of metrology and servomechanism in the non-ferrous industry
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| YS/T 497-2005 | English | 1669 | Add to Cart | 8 days [Need to translate] | Business accounting specification for the service of metrology and servomechanism in the non-ferrous industry |
Click to Preview a similar PDF
Basic data
| Standard ID | YS/T 497-2005 (YS/T497-2005) |
| Description (Translated English) | Business accounting specification for the service of metrology and servomechanism in the non-ferrous industry |
| Sector / Industry | Nonferrous Metallurgy Industry Standard (Recommended) |
| Classification of Chinese Standard | H02 |
| Classification of International Standard | 77.010 |
| Word Count Estimation | 52,546 |
| Date of Issue | 2005-09-23 |
| Date of Implementation | 2006-02-01 |
| Regulation (derived from) | Development and Reform Commission Notice (2005/ 61) |
| Issuing agency(ies) | National Development and Reform Commission |
| Summary | This standard applies to non-ferrous metals business measurement and automation equipment service billing accounting. This standard specifies the length, thermal, mechanical, electrical, chemical, nondestructive testing instruments test, repair, installation, commissioning and seized pounds measurement, metal production, complete sets of distributed computer systems and networks such as billing accounting. Billing accounts include: verification, calibration, testing, repair, installation, manufacture, testing, inspection pounds and other expenses. Each fee includes labor costs, machinery costs, management fees, and other accessories scattered materials. According to the cumulative work content. Excluding depreciation of fixed assets and renovation costs, but also contain the main material and spare parts costs. |