Home Cart Quotation Policy About-Us
www.ChineseStandard.net
Database: 221887 (14 Apr 2026)
SEARCH
Path: Home > MISC > Page349 > WS/T 395-2012

WS/T 395-2012 PDF English

Std IDVersionUSDBuyDeliver [PDF] inTitle (Description)
WS/T 395-2012English399 Add to Cart 3 days [Need to translate] Hygienic evaluation specification of central air conditioning ventilation system in public buildings

Click to Preview a similar PDF

Basic data

Standard ID WS/T 395-2012 (WS/T395-2012)
Description (Translated English) Hygienic evaluation specification of central air conditioning ventilation system in public buildings
Sector / Industry Health Industry Standard (Recommended)
Classification of Chinese Standard C51
Classification of International Standard 91.140.30
Word Count Estimation 10,174
Quoted Standard WS 394; WS/T 396; implementing rules MOH health regulations in public places
Regulation (derived from) ?Health-Communication (2012) 16; Industry Standard Filing Announcement 2012 No.10 (Total No.154)
Issuing agency(ies) National Health and Family Planning Commission of the People's Republic of China
Summary This standard specifies the new, alteration, expansion of public places, technical requirements, design and final acceptance hygienic evaluation of air conditioning and ventilation systems. This standard applies to public places has been put into operatio

WS/T 395-2012: Hygienic evaluation specification of central air conditioning ventilation system in public buildings




---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Hygienic evaluation specification of central air conditioning ventilation system in public buildings ICS 91.140.30 C51 People's Republic of China health industry standards Central air conditioning and ventilation system in public places Hygiene evaluation criteria Posted on.2012-09-19 2013-04-01 implementation Ministry of Health of People's Republic of China released

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard proposed by the Ministry of Health Environmental Health Standards Committee. This standard is approved by the Ministry of Health of the People's Republic of China. This standard is drafted by. Jiangsu Provincial Center for Disease Control and Prevention, China Center for Disease Control and Prevention Environment and Health-related product safety The Shenzhen Center for Disease Control and Prevention. The main drafters of this standard. Zhang Xiuzhen, Yao Xiaoyuan, gold and silver dragon, Liu Fan, Wang Junqi, Dai Zizhu, Chen Liansheng, Chen Xiaodong, Zhou Lian, Yu Shu Court. Central air conditioning and ventilation system in public places Hygiene evaluation criteria

1 Scope

This standard specifies the design, construction and completion of centralized air conditioning and ventilation systems (hereinafter referred to as centralized air conditioning systems) in public places newly built, reconstructed and expanded Technical requirements for laboratory acceptance hygiene evaluation. This standard applies to central air conditioning system has been put into operation in public places, other places centralized air conditioning system hygiene evaluation reference carried out.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this document Pieces. For undated references, the latest edition (including all amendments) applies to this document. WS 394 public places central air conditioning and ventilation system hygiene specification WS/T 396 public places central air conditioning and ventilation system cleaning and disinfection specifications Public places health regulations implementation details Ministry of Health

3 health evaluation agencies

3.1 basic requirements 3.1.1 has an independent legal personality. 3.1.2 have a fixed office space and the corresponding laboratory. 3.1.3 test items should be at the provincial level laboratory accreditation. 3.2 Personnel requirements 3.2.1 The person in charge of technology shall have the professional and technical title of associate senior or above and be engaged in relevant professional work for more than 5 years. 3.2.2 Professional and technical personnel should have not less than 5 centralized health assessment of air conditioning systems to adapt to public health, health testing Professionals, and have the appropriate professional and technical capabilities, including mid-level professional and technical titles more than 40% of the total number of professionals. 3.2.3 professionals should be trained and passed the examination. 3.3 Quality Management System Requirements Should set up a special quality management department, and have a perfect air conditioning system in line with the health evaluation quality management system. 3.4 Equipment Requirements 3.4.1 possession of accurate and reliable value, good performance, and central air conditioning system health evaluation projects supporting equipment, basic equipment See Appendix A. 3.4.2 Equipment The equipment shall be configured to meet the needs of the work and to function well.
...

Refund Policy Privacy Policy Terms of Service