GBZ17799.6-2017 English PDFUS$419.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ17799.6-2017: Electromagnetic compatibility -- Generic standards -- Immunity for power station and substation environments Status: Valid
Basic dataStandard ID: GB/Z 17799.6-2017 (GB/Z17799.6-2017)Description (Translated English): Electromagnetic compatibility -- Generic standards -- Immunity for power station and substation environments Sector / Industry: National Standard Classification of Chinese Standard: L06 Classification of International Standard: 33.100.20 Word Count Estimation: 21,243 Date of Issue: 2017-07-12 Date of Implementation: 2018-02-01 Quoted Standard: GB/T 4365; GB/T 7251.1; GB/T 17618; GB/T 17626.1; GB/T 17626.2; GB/T 17626.3; GB/T 17626.4; GB/T 17626.5; GB/T 17626.6; GB/T 17626.8; GB/T 17626.9; GB/T 17626.10; GB/T 17626.11; GB/T 17626.12; GB/T 17626.13; GB/T 17626.16; GB/T 17626.17; GB/T 17626.29 Adopted Standard: IEC/TS 61000-6-5-2001, NEQ Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard applies to the power system power generation, transmission, power distribution equipment and related communication system immunity requirements. Applicable places for power systems to install equipment for power plants and substations. The immunity requirements given in this standard apply to electromagnetic phenomena of the frequency range of 0 Hz to 400 GHz. The test methods and test equipment and configurations involved are based on GB / T 17626. The immunity requirements of this standard apply to meet the specific requirements of the equipment and system in the realization of functions and tasks to ensure reliable operation in the actual electromagnetic environment and gives the basis for the evaluation of the performance of the immunity test for different functions The This standard specifies the different immunity test requirements installed in power plants and substation equipment. Under special conditions, the level of electromagnetic disturbance may be GBZ17799.6-2017: Electromagnetic compatibility -- Generic standards -- Immunity for power station and substation environments---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Electromagnetic compatibility. Generic standards. Immunity for power station and substation environments ICS 33.100.20 L06 People's Republic of China national standardization of technical guidance documents Common standards for electromagnetic compatibility Immunity in power plant and substation environments (IEC /T S61000-6-5.2001, Electromagneticcompatibility (EMC) - Part 6-5.Genericstandards-Immunityforpowerstationand substationenvironments, NEQ) 2017-07-12 Posted 2018-02-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Overview 2 4 Terms and definitions 2 5 electromagnetic environment 4 6 immunity requirements and type test 4 7 Test conditions 10 8 Performance Criteria 10 Compliance document Appendix A (informative) on electromagnetic phenomena and their typical sources and causes 13 Appendix B (Informative) Electromagnetic disturbance of equipment and system functions Overview 14 References 18 ForewordThe Common Criteria for Electromagnetic Compatibility now includes the following sections. --- Common standard electromagnetic compatibility residential, commercial and light industrial environments immunity test; --- EMC common standard industrial environment immunity test; --- Electromagnetic compatibility common standard residential, commercial and light industrial environment in the launch; --- EMC common standard industrial environment launch; --- General electromagnetic compatibility standard indoor equipment high altitude electromagnetic pulse (HEMP) immunity; --- EMC common standard power plant and substation environment immunity. This section is "General Standard Electromagnetic Compatibility" Part 6, this section is the guiding technical documents. This section drafted in accordance with GB/T 1.1-2009 given rules. This section uses the redrafted Law Reference IEC /T S61000-6-5.2001 "Electromagnetic Compatibility Part 6-5. General Standard Power Plant And substation environment immunity "compilation, and IEC /T S61000-6-5.2001 consistency is not equivalent. This part of the IEC /T S61000-6-5.2001 technical differences and the reasons are as follows. --- Shell port immunity test items increased pulsed magnetic field and damping oscillation magnetic field immunity test; low-voltage AC input/output power Source port immunity test adds low frequency immunity test of AC power port harmonics, inter-harmonics and power network signals. The above increase Canada's projects are currently the actual electromagnetic compatibility pilot project. --- Pulsed magnetic field and damped Oscillatory magnetic field immunity test level to take five, according to GB/T 17626.9 and GB/T 17626.10 Medium Harsh industrial environment requirements; AC power port harmonics, inter-harmonics and power network signal low frequency immunity test level Level 2, according to GB/T 17626.13 in the public connection point (PCC) and the internal connection point (IPC) requirements. This section made the following editorial changes. --- Remove the IEC /T S61000-6-5.2001 English original introduction and introduction; --- Adjust the IEC /T S61000-6-5.2001 in the chart and table location. This part of the National Electromagnetic Compatibility Standardization Technical Committee (SAC/TC246) and focal point. This section drafted unit. China Electric Power Research Institute, North China Electric Power University, State Grid Electric Power Research Institute, Beijing Sifang Automation Automation Co., Ltd., Schneider Electric China Limited. The main drafters of this section. Zhang Jiangong, Zhao Jun, Zhao Zhibin, Xiao Bao Ming, Jia Gang, Li Fu Tong, Qian Yuan, Li Ni, Lu Yao, Ni Park. Common standards for electromagnetic compatibility Immunity in power plant and substation environments1 ScopeThis section applies to the power system power generation, transmission, distribution equipment and related communications systems with immunity requirements. Suitable places for the power system installation of power plants and substations. The immunity requirements given in this section apply to the electromagnetic phenomena of interest in the frequency range 0 Hz to 400 GHz. The tests involved Methods, test equipment and configuration to GB/T 17626 as the basis. The immunity requirements set forth in this standard apply to the specific needs of equipment and systems in implementing functions and fulfilling tasks to ensure that The actual electromagnetic environment, reliable operation, and given different functions of immunity test performance evaluation basis. This section gives different immunity test requirements for installation in power plants and substation equipment. Under special conditions, electromagnetic disturbance level May exceed the immunity test specified in this standard level, then in this case should take appropriate mitigation measures. High-voltage and high-power devices without electronic circuitry (primary system) are not covered by this standard. This section does not address the safety requirements of the equipment, such as shock protection, insulation and pressure test conducted prior to the immunity test. This section does not involve electromagnetic emission requirements. Electromagnetic emission requirements, please refer to other relevant standards (such as GB 7251.1, GB/T 18657.1 Wait). If there is no dedicated product and product class standard exists, the common standard is GB 17799.4.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 4365 Electrotechnical terminology Electromagnetic compatibility (GB/T 4365-2003, IEC 60050 (161) .1990, IDT) GB/T 7251.1 Low-voltage switchgear and controlgear - Part 1. Type test and part type test equipment (GB 7251.1-2005, IEC 61439-1.1999, IDT) GB/T 17618 Information technology equipment immunity limits and measurement methods (GB/T 17618-2015, CISPR24.2010, IDT) GB/T 17626.1 electromagnetic compatibility test and measurement techniques Immunity Test Summary (GB/T 17626.1-2006, IEC 61000-4-1.2000, IDT) GB/T 17626.2 Electromagnetic compatibility test and measurement techniques Electrostatic discharge immunity test (GB/T 17626.2-2006, IEC 61000-4-2.2001, IDT) GB/T 17626.3 Electromagnetic compatibility test and measurement techniques RF electromagnetic radiation immunity test (GB/T 17626.3- 2006, IEC 61000-4-3.2002, IDT) GB/T 17626.4 Electromagnetic compatibility test and measurement techniques Electrical fast transient burst immunity test (GB/T 17626.4- 2008, IEC 61000-4-4.2004, IDT) GB/T 17626.5 electromagnetic compatibility test and measurement technology surge (impact) immunity test (GB/T 17626.5-2008, IEC 61000-4-5.2005, IDT) GB/T 17626.6 Electromagnetic compatibility-Testing and measurement techniques Immunity to conducted disturbances induced by radio-frequency fields (GB/T 17626.6- 2008, IEC 61000-4-6.2006, IDT) GB/T 17626.8 Electromagnetic compatibility test and measurement techniques Frequency magnetic field immunity test (GB/T 17626.8-2006, IEC 61000-4-8.2001, IDT) ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ17799.6-2017_English be delivered?Answer: Upon your order, we will start to translate GBZ17799.6-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GBZ17799.6-2017_English with my colleagues?Answer: Yes. The purchased PDF of GBZ17799.6-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |