GB/T 5095.2503-2021 English PDFUS$264.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 5095.2503-2021: Electromechanical components for electronic equipment - Basic testing procedures and measuring methods - Part 25-3: Test 25c: Rise time degradation Status: Valid
Basic dataStandard ID: GB/T 5095.2503-2021 (GB/T5095.2503-2021)Description (Translated English): Electromechanical components for electronic equipment - Basic testing procedures and measuring methods - Part 25-3: Test 25c: Rise time degradation Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: L23 Word Count Estimation: 14,146 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 5095.2503-2021: Electromechanical components for electronic equipment - Basic testing procedures and measuring methods - Part 25-3: Test 25c: Rise time degradation---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Electromechanical components for electronic equipment - Basic testing procedures and measuring methods - Part 25-3.Test 25c. Rise time degradation ICS 31.220.10 L23 National Standards of People's Republic of China Electromechanical components for electronic equipment Basic test procedures and measurement methods Part 25-3.Test 25c. Rise time decay (IEC 60512-25-3.2001,Connectorsforelectronicequipment- Released on 2021-03-09 Implemented on 2021-10-01 State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee Table of contentsForeword Ⅲ 1 General 1 1.1 Scope and purpose 1 1.2 Terms and definitions 1 2 Test facility 1 2.1 Equipment 1 2.2 Device 2 3 Test sample 2 3.1 Description 2 4 Test procedure 3 4.1 Insertion method 3 4.2 Standard Device Method 3 4.3 Rise time decay calculation 3 5 Rules to be stipulated by relevant standards 3 6 Test record file 3 Appendix A (Normative Appendix) Schematic Diagram of Installation and Equipment 5 Appendix B (informative appendix) Practical Guide 8ForewordGB/T 5095 "Basic test procedures and measurement methods for electromechanical components for electronic equipment" is divided into several parts according to the test methods. Part 25 of GB/T 5095 is a signal integrity test. The parts that have been released or planned to be released are as follows. ---Part 25-1.Test 25a. Crosstalk ratio; ---Part 25-2.Test 25b. Attenuation (insertion loss); ---Part 25-3.Test 25c. Rise time decay; ---Part 25-4.Test 25d. Transmission delay; ---Part 25-5.Test 25e. Return loss; ---Part 25-6.Test 25f. Eye diagram and jitter; ---Part 25-7.Test 25g. impedance, reflection coefficient and voltage standing wave ratio (VSWR); --- Part 25-9.Signal Integrity Test Test 25i. Alien Crosstalk. This part is part 25-3 of GB/T 5095. This section was drafted in accordance with the rules given in GB/T 1.1-2009. The translation method used in this part is equivalent to the use of IEC 60512-25-3.2001 "Connector Test and Measurement for Electronic Equipment Part 25-3" Minutes. Test 25c. Rise time decay". This section has made the following editorial changes. ---The name of the standard is revised from "Test and Measurement of Connectors for Electronic Equipment Part 25-3.Test 25c. Rise Time Decay" to "Basic test procedures and measurement methods for electromechanical components for electronic equipment-Part 25-3.Test 25c. Rise time decay". Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents. This part was proposed by the Ministry of Industry and Information Technology of the People's Republic of China. This part is under the jurisdiction of the National Standardization Technical Committee of Electromechanical Components for Electronic Equipment (SAC/TC166). Drafting organizations of this section. Sichuan Huafeng Enterprise Group Co., Ltd., China Electronics Standardization Institute. The main drafters of this section. Pang Bin, Zhu Ming, Xiao Miao, Liu Jun, Wang Qilong. Electromechanical components for electronic equipment Basic test procedures and measurement methods Part 25-3.Test 25c. Rise time decay1 General1.1 Scope and purpose This part of GB/T 5095 applies to electrical connectors, sockets, cable assemblies or interconnecting systems. This section describes how to measure the influence of a sample on the rise time of a signal passing through it. 1.2 Terms and definitions The following terms and definitions apply to this document. 1.2.1 Rise time degradation When the sample is inserted into the transmission channel, it reaches the theoretically ideal (zero rise time) voltage step rise time increment (see Figure 1). use The calculation formula for the attenuation of the Gaussian signal from 10% to 90% of the rise time is shown in equation (1). Tr,d= (Tr)2-(Tr,m)2 (1) Where. Tr,d ---rise time decay; Tr --- the rise time of the measurement; Tr,m---measurement system rise time. 1.2.2 Measurement system rise time measurement system rise time Rise time measured by a device with no sample installed and with filtering (or normalization) function. Usually, the measurement is from 10% to 90% The rise time of the level (see Figure 1). 1.2.3 Sampleenvironmentimpedance The impedance caused by the device on the sample signal wire. The impedance is determined by the transmission line, terminal resistance, attached receiver and signal source. And the parasitic effects of the device. 1.2.4 Rise time The time required for a voltage step to occur is usually measured from the initial value and the final value of the 10% to 90% level rise time.2 Test facility2.1 Equipment Pulse generator and oscilloscope, time domain reflectometer (TDR) or with a measurement system whose rise time is less than or equal to the measured rise time 70% of other suitable equipment. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 5095.2503-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 5095.2503-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 5095.2503-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 5095.2503-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |