GB/T 45233-2025 English PDFUS$359.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 45233-2025: Guidelines for comprehensive safety risk assessment of chemical industry park Status: Valid
Basic dataStandard ID: GB/T 45233-2025 (GB/T45233-2025)Description (Translated English): Guidelines for comprehensive safety risk assessment of chemical industry park Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: G09 Classification of International Standard: 71.020 Word Count Estimation: 18,191 Date of Issue: 2025-01-24 Date of Implementation: 2025-05-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 45233-2025: Guidelines for comprehensive safety risk assessment of chemical industry park---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.National Standard of the People's Republic of China ICS 71.020CCS G 09 Guidelines for Safety Risk Assessment in Chemical Industrial Parks 2025-01-24 Release 2025-05-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of ContentsPreface Ⅲ Introduction Ⅳ 1 Scope...1 2 Normative references ...1 3 Terms and Definitions 2 4 General Principles 2 5 Evaluation Procedure 3 6 Security risk assessment content and methods ...5 7 Security Risk Assessment Report...6 Appendix A (Informative) List of Materials Required for Safety Risk Assessment of Chemical Parks 8 References ...10ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting is required. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the National Technical Committee on Hazardous Chemicals Management Standardization (SAC/TC 251). This document was drafted by. China Chemical Economic and Technological Development Center, Anyuan Technology Co., Ltd., Sinopec Safety Engineering Research Institute Co., Ltd., Sinopec Engineering Construction Co., Ltd., Anhui Xiangyuan Technology Co., Ltd., Dekaida Management Consulting (Shanghai) Co., Ltd., Shaanxi Jingcheng Security Technology Service Co., Ltd., Beijing Zhengyuan Digital Technology Co., Ltd., Jiangren Wisdom (Jiangsu) Technology Co., Ltd., Shanghai Dragon Industrial Engineering Co., Ltd., Beijing Chenan Technology Co., Ltd., Beijing Silu Zhiyuan Technology Co., Ltd., China Unicom Digital Technology Co., Ltd. Company, Shanghai Fuding Technology Co., Ltd., Guizhou Chemical Research Institute, Dongying Port Economic Development Zone Management Committee, Jiangsu Taixing Economic Development Zone Development Zone Management Committee, Yidu Youyuan Industrial Co., Ltd., Saifeite Engineering Technology Group Co., Ltd., Shandong Lixing New Materials Technology Co., Ltd. Co., Ltd., China Bluestar Changhua Engineering Technology Co., Ltd., Chongqing Chemical Industry Research Institute Co., Ltd., and Luxi Chemical Group Co., Ltd. The main drafters of this document are. Yang Ting, Wang Sanming, Xin Baoquan, Ma Congyue, Liu Houzhou, Li Shaopeng, Feng Yuanyuan, Wu Weiguo, Gao Tingting, Li An, Teng Jingbo, Zeng Xiaoming, Sun Bai, Chen Tao, Wei Jianshu, Xie Li, Zhang Wen, Wang Shuai, Xu Li, Tian Juan, Geng Lifang, Liu Yongqiang, Teng Xiaoxing, Lu Chunsheng, Xu Xiuming, Yao Shunli, Zhu Shengyong, Leng Qing, Li Kongfu, Li Di, Su Qiangde, Sun Chenggao, Fang Zhou, Li Gang.IntroductionThe chemical park safety risk assessment proposes scientific, reasonable and feasible regional safety risk control measures and regional emergency rescue system construction The activities of summarizing the evaluation results are necessary to reduce the risk level of new and existing chemical parks. The Office of the State Council’s Guiding Opinions on Further Strengthening Safety Management in Chemical Industrial Parks (No. 37 of the Office of the State Council’s Safety Committee [2012]) first proposed that chemical industrial parks should The State Council's Safety Committee, the Ministry of Emergency Management, and the Ministry of Industry and Information Technology issued a series of policies and measures to For example, the National Three-Year Action Plan for Special Rectification of Work Safety (Safety Committee [2020] No. 3), the Guiding Opinions” (Ministry of Industry and Information Technology [2015] No. 433), “Chemical Park Construction Standards and Certification Management Measures (Trial)” (Ministry of Industry and Information Technology [2021] 220) and the “Guidelines for the Investigation and Governance of Safety Risks in Chemical Parks” (Emergency [2023] No. 123), etc., provide guidance on the safety risk assessment of chemical parks. Make specific requirements. In order to implement the national policy requirements and standardize the safety risk assessment work of chemical parks, Jiangsu, Shaanxi, Ningxia, Sichuan, Henan, 10 provinces and autonomous regions, including Shandong, Shanxi, Hunan, Guangdong and Xinjiang, have formulated local standard documents. These local standard documents guide third-party units However, the safety risk assessment of chemical parks has not been carried out in a standardized manner at the national level. There is no unified standard. It is not clear how to carry out risk assessment in chemical parks in various regions. The assessment procedures, content, methods and reporting requirements are unclear. Indeed, the quality of the evaluation by the third-party unit cannot be judged. This has resulted in the chemical park safety risk assessment work failing to achieve its intended purpose. The work has no practical results and the country's policies are difficult to implement. The Guidelines for Risk Assessment of Chemical Industrial Parks stipulates the overall requirements, assessment procedures, assessment contents and methods of safety risk assessment of chemical industrial parks. The evaluation report fills the gap of the lack of safety risk assessment standards at the national level and plays an important role in the risk assessment work of chemical parks in various places. guiding significance. Guidelines for Safety Risk Assessment in Chemical Industrial Parks1 ScopeThis document provides the general principles, assessment procedures, assessment content and methods, and assessment report of chemical park safety risk assessment. guide. This document is applicable to safety risk assessment of chemical parks.2 Normative referencesThe contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB 18218 Identification of major hazard sources of hazardous chemicals GB 18265 Basic safety technology requirements for hazardous chemicals business enterprises GB/T 23694 Risk Management Terminology GB/T 27921 Risk management risk assessment technology GB/T 36762 Management regulations for public pipe corridors in chemical parks GB 36894 Risk benchmark for hazardous chemical production plants and storage facilities GB/T 37243-2019 Method for determining external safety protection distances for hazardous chemical production equipment and storage facilities GB/T 42078 Guidelines for the development and construction of chemical parks GB 50014 Outdoor drainage design standard GB 50016 Code for Fire Protection Design of Buildings GB 50052 Design specification for power supply and distribution systems GB 50074 Design specification for petroleum depots GB 50160 Fire protection design standard for petrochemical enterprises GB 50187 Specification for the general layout of industrial enterprises GB 50318 Urban drainage engineering planning specification GB 50489 Specification for general layout and transportation design of chemical enterprises GB 50805 Code for Design of Urban Flood Control Projects GB 51079 Urban flood control planning specifications GB 51283 Fire protection standard for engineering design of fine chemical enterprises GB 51428 Fire protection standard for coal chemical engineering design GB 55037 General code for fire protection of buildings AQ 8001 General principles for safety evaluation SH/T 3038 Petrochemical plant power design specification SH/T 3060 Design specification for power supply system in petrochemical enterprises SH/T 3226-2024 Petrochemical Process Risk Quantitative Analysis Standard ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 45233-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 45233-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 45233-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 45233-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |