GB/T 42440-2023 English PDFUS$199.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 42440-2023: Shale gas - The technical requirements for water supply and transportation system of industrial fracturing Status: Valid
Basic dataStandard ID: GB/T 42440-2023 (GB/T42440-2023)Description (Translated English): Shale gas - The technical requirements for water supply and transportation system of industrial fracturing Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: E16 Classification of International Standard: 75.020 Word Count Estimation: 9,921 Date of Issue: 2023-05-23 Date of Implementation: 2023-09-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 42440-2023: Shale gas - The technical requirements for water supply and transportation system of industrial fracturing---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS 75:020 CCSE16 National Standards of People's Republic of China Shale gas industrial fracturing water delivery system skills requirement Released on 2023-05-23 2023-09-01 implementation State Administration for Market Regulation Released by the National Standardization Management Committee table of contentsPreface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Basic Requirements 1 5 Design water volume 2 6 fetch water 2 7 Water supply to water 3 8 Health, safety, environmental protection (HSE) and energy saving, water saving 4 Appendix A (informative) Example of shale gas industrial fracturing water delivery system 5forewordThis document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting: Please note that some contents of this document may refer to patents: The issuing agency of this document assumes no responsibility for identifying patents: This document is proposed and managed by the National Natural Gas Standardization Technical Committee (SAC/TC244): This document was drafted by: PetroChina Southwest Oil and Gas Field Branch Natural Gas Research Institute, PetroChina Co:, Ltd: Southwest Oil and Gas Field Branch, China Petroleum Engineering Construction Co:, Ltd: Southwest Branch, Sichuan Kehong Petroleum and Natural Gas Engineering Co:, Ltd: Co:, Ltd:, Sinopec Chongqing Fuling Shale Gas Exploration and Development Co:, Ltd:, CNPC Chuanqing Drilling Engineering Co:, Ltd: Development Project Manager Department, Daqing Oilfield Co:, Ltd: Downhole Operation Branch: The main drafters of this document: Song Bin, Shan Congxin, Le Hong, Yang Minghua, Chen Guoping, Zhuang Qingwu, Lian Wei, Tang Xin, Tong Fuliang, Ji Wei'an, Li Linyu, Wang Feng, Luo Yong, Xiong Ying, Wang Heng, Wang Zhi, Xiao Fang, Jiang Xuemei, Xu Hongguo, He Na, Luo Qin, Yang Changping, Song Jinsheng: Shale gas industrial fracturing water delivery system skills requirement1 ScopeThis document specifies the design water volume, water intake, water supply and transfer of water delivery system for industrial fracturing of shale gas, as well as health, safety and environmental protection: (HSE) and energy-saving, water-saving and other technical requirements: This document is applicable to the surface engineering design of the factory fracturing water delivery system for newly built, expanded and reconstructed onshore shale gas fields:2 Normative referencesThe contents of the following documents constitute the essential provisions of this document through normative references in the text: Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document: GB 50013 Outdoor Water Supply Design Standards GB 50265 Code for Design of Pumping Stations NB/T 14002:3 Shale Gas Reservoir Stimulation Part 3: Fracturing Flowback Fluid Recovery and Treatment Methods SY/T 6331 Technical Code for Energy Conservation in Gas Field Surface Engineering Design3 Terms and DefinitionsThe following terms and definitions apply to this document: 3:1 reuse water After the fracturing flowback fluid is treated, it is used to prepare water for shale gas fracturing fluid: 3:2 Water supply systemwatersupplysystem The general term for various facilities used for industrial fracturing of shale gas to transport clean water: Note: Including water supply pumping station, water supply pipe network, water supply and storage facilities and ancillary facilities: 3:3 Water transfer system watertransfersystem The general term for various facilities that transfer fracturing flowback fluid, reused water, clean water and their mixed fluids through factory fracturing of shale gas: Note: Including water transfer pumping station, water transfer pipe network, water transfer and storage facilities and ancillary facilities:4 Basic requirements4:1 The shale gas industrial fracturing water delivery system includes water intake, water supply system and water transfer system, see Appendix A for examples: 4:2 The shale gas industrial fracturing water delivery system should be based on urban planning, platform deployment, drilling test progress, natural and geological conditions, water supply and transfer The scale and other conditions, combined with the gas reservoir and drilling and production projects of the development plan, are comprehensively determined through technical and economic comparison: 4:3 The design of the shale gas industrial fracturing water delivery system should be based on the principle of combining short-term and long-term and focusing on the short-term, with overall planning and phased implementation ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 42440-2023_English be delivered?Answer: Upon your order, we will start to translate GB/T 42440-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 42440-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 42440-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |