GB/T 29168.4-2024 English PDFUS$759.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 29168.4-2024: Petroleum and natural gas industries - Bends, fittings and flanges for pipeline transportation systems - Part 4: Cold bends Status: Valid
Basic dataStandard ID: GB/T 29168.4-2024 (GB/T29168.4-2024)Description (Translated English): Petroleum and natural gas industries - Bends, fittings and flanges for pipeline transportation systems - Part 4: Cold bends Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: E16 Classification of International Standard: 75.200 Word Count Estimation: 38,321 Date of Issue: 2024-09-29 Date of Implementation: 2025-01-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 29168.4-2024: Petroleum and natural gas industries - Bends, fittings and flanges for pipeline transportation systems - Part 4: Cold bends---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS 75.200 CCSE16 National Standard of the People's Republic of China Bend pipes for oil and gas industry pipeline transportation systems, Pipe fittings and flanges Part 4.Cold-bent pipes Part 4.Factory cold branches,MOD) Released on 2024-09-29 2025-01-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of ContentsPreface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Symbols and abbreviations 3 4.1 Symbols 3 4.2 Abbreviations 4 5 Cold-bent pipe code 5 6 Design 5 6.1 Load 5 6.2 Design Method 5 6.3 Bend wall thickness 5 7 Information provided by the purchaser 5 7.1 General Information 5 7.2 Additional Information 6 7.3 Main tube information 6 8 Manufacturing 7 8.1 General requirements 7 8.2 Mother pipe 7 8.3 Manufacturing process specifications 7 8.4 Bends for evaluation tests 7 8.5 Cold pipe bending 8 8.6 Heat treatment after bending 8 8.7 Forming and sizing after bending 8 8.8 Butt-jointed steel pipes 9 8.9 Pipe end treatment 9 9 Tests, inspections and technical requirements 9 9.1 General 9 9.2 Test and inspection requirements 9 9.3 Chemical composition 12 9.4 Mechanical test 12 9.5 Nondestructive Testing 17 9.6 Size 19 9.7 Anti-corrosion layer detection 21 9.8 Measurement 21 9.9 Hydrostatic test 21 10 Sign 21 Appendix A (informative) Structural changes of this document compared with ISO 15590-4.2019 23 Appendix B (Informative) Technical differences between this document and ISO 15590-4.2019 and their causes 25 Appendix C (Normative) Cold-bent pipes for acid service environments 28 Appendix D (Normative) Manufacturing Process Specifications 31 Reference 32ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 4 of GB/T 29168 "Pipe elbows, fittings and flanges for pipeline transportation systems in the petroleum and natural gas industry". GB/T 29168 has published the following parts. --- Part 1.Induction heating pipe bending; --- Part 2.Pipe fittings; --- Part 3.Flanges; --- Part 4.Cold-bent pipes. This document is modified to adopt ISO 15590-4.2019 "Factory elbows, fittings and flanges for pipeline transportation systems in the petroleum and natural gas industry Part 4 Part. Factory Cold-Bent Pipes. This document has more structural adjustments compared to ISO 15590-4.2019.Here is a comparison of the structural number changes between the two documents. See Appendix A for the table. This document has many technical differences compared to ISO 15590-4.2019. A single vertical line (丨) is used to indicate these technical differences. A list of these technical differences and their reasons is given in Appendix B. The following editorial changes were made to this document. --- In order to coordinate with the existing standards, the name of the standard will be changed to "Bends, pipe fittings and flanges for pipeline transportation systems in the petroleum and natural gas industry Part 4.Cold-bent pipes. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Petroleum and Natural Gas Standardization Technical Committee (SAC/TC355). This document was drafted by. China National Petroleum Corporation Engineering Materials Research Institute Co., Ltd., China Petroleum Materials Co., Ltd., Julong Steel Pipe Co., Ltd. Company, Baoji Petroleum Steel Pipe Co., Ltd., National Pipeline Network Group United Pipeline Co., Ltd. Western Branch, Shaanxi Natural Gas Co., Ltd. Co., Ltd., Hebei Huizhong Pipeline Equipment Co., Ltd., and Xi'an Sanhuan Oil Pipe Technology Co., Ltd. The main drafters of this document are. Chi Qiang, Wang Peng, Zhao Zhiwei, Guo Jianguang, Gao Qi, Huang Chengshuai, Xie Ping, Jia Haidong, Li Weiwei, Fang Wei, Niu Hui, Chen Yuefeng, Huang Duo, Ding Kuang, Guo Jianlong, Zhang Yanyan, and Wang Yu.IntroductionBends, pipe fittings and flanges are important and indispensable structural parts for the construction of long-distance pipelines and valve chambers at stations. The procurement and application of pipes for industrial pipeline transportation systems have been formulated for induction heating bends, pipe fittings, This document is based on ISO 15590-4, and refers to relevant domestic and foreign standards. The research results and practical experience of the application basic research and technical standards of cold-bent pipes for oil and gas pipeline construction. GB/T 29168 "Bends, fittings and flanges for pipeline transportation systems in the petroleum and natural gas industry" is planned to consist of four parts. --- Part 1.Induction heating pipe bending. The purpose is to specify the application of carbon steel or low alloy steel seamless steel pipe, high frequency welded pipe and straight seam buried pipe Technical requirements for the design, manufacture and inspection of induction heating bends made from arc-welded steel pipe as parent pipe. --- Part 2.Pipe fittings. The purpose is to specify the pipe fittings applicable to the use of carbon steel or low alloy steel plates, seamless steel pipes and welded steel pipes. Technical requirements for the manufacture and inspection of welded pipe fittings. --- Part 3.Flanges. The purpose is to specify neck welding flanges and blind flanges suitable for carbon steel or low alloy steel forgings, as well as anchoring Technical requirements for the manufacture and inspection of flanges, slip-on flanges and orifice flanges. --- Part 4.Cold-bent pipes. The purpose is to specify the radius of application of low-carbon low-alloy seamless and welded steel pipes not less than 5OD, Technical requirements for the design, manufacture and inspection of cold-bent pipe produced by cold bending in factories and on site. During the construction of pipeline engineering, in order to meet the needs of medium diversion, diversion and relief, and improve the main steel pipe in the pipeline system under harsh loads, Due to the abnormal external loads, a large number of pipeline structures are often required in the construction of pipeline laying, valve rooms, stations and booster stations. Pipeline structural parts can be divided into elbows, pipe fittings and flanges according to their geometric shapes and application environments. Different, pipe bending can be divided into induction heating pipe bending and cold bending, tees can be divided into welding tees, hot extrusion tees, cold pressing tees, etc. Based on factors such as type, geometry, production and processing technology, and inspection requirements, GB/T 29168 is based on different bending processes. GB/T 29168 divides pipe bending into Part 1.induction heating pipe bending and Part 4.cold bending; Part 2.carbon steel or low alloy pipe bending. Technical requirements for pipe fittings made of seamless steel pipes and welded steel pipes, such as elbows, caps, tees, reducers, etc.; Part 3 is carbon steel And technical requirements for low alloy steel forged flanges. Bend pipes for oil and gas industry pipeline transportation systems, Pipe fittings and flanges Part 4.Cold-bent pipes1 ScopeThis document specifies the design, manufacture, testing and maintenance of cold-bent pipes for pipeline transportation systems designed in accordance with GB 50251, GB 50253 and GB/T 24259. Inspection and testing, technical requirements and marking. This document applies to cold-bent pipes with a radius of not less than 5OD, which are cold-bent in factories and on-site for use in pipeline transportation systems in the petroleum and natural gas industries. manufacturing and inspection. This document applies to cold-bent pipes made of low carbon low alloy seamless and welded steel pipes. Note. These materials are typical C-Mn steel or low alloy steel, which are consistent with the strength level of pipeline steel pipes in GB/T 9711. This document does not apply to pipe bends produced using other manufacturing processes.2 Normative referencesThe contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the latest version (including all amendments) applies to this document. This document. GB/T 228.1 Tensile tests on metallic materials - Part 1.Test methods at room temperature (GB/T 228.1-2021, ISO 6892-1. 2019,MOD) GB/T 228.2 Tensile tests on metallic materials Part 2.High temperature test methods (GB/T 228.2-2015, ISO 6892-2. 2011,MOD) GB/T 229 Charpy pendulum impact test method for metallic materials (GB/T 229-2020, ISO 148-1.2016, MOD) GB/T 230.1 Rockwell hardness test for metallic materials Part 1.Test method (GB/T 230.1-2018, ISO 6508-1. 2016,MOD) GB/T 232 Metallic materials bending test method (GB/T 232-2024, ISO 7438.2020, MOD) GB/T 2970 Ultrasonic testing method for thick steel plates GB/T 4157-2017 Laboratory test method for resistance of metals to sulfide stress cracking and stress corrosion cracking in hydrogen sulfide environments GB/T 4340.1 Metallic materials Vickers hardness test Part 1.Test method (GB/T 4340.1-2024, ISO 6507-1. 2023,MOD) GB/T 5777-2019 Full circumferential automatic ultrasonic testing of seamless and welded (except submerged arc welded) steel tubes for longitudinal and/or transverse imperfections (ISO 10893-10.2011,MOD) GB/T 6394 Determination of average grain size of metals GB/T 8650-2015 Method for evaluating the resistance of pipeline steel and pressure vessel steel to hydrogen induced cracking GB/T 8923.1-2011 Surface preparation of steel substrates before coating - Visual assessment of surface cleanliness - Part 1.Uncoated Rust level and treatment level of steel surface and steel surface after complete removal of original coating (GB/T 8923.1-2011, ISO 8501-1. 2007, IDT) GB/T 9445 Qualification and certification of nondestructive testing personnel (GB/T 9445-2024, ISO 9712.2021, IDT) GB/T 9711 Steel pipes for pipeline transportation systems in the petroleum and natural gas industries (GB/T 9711-2023, ISO 3183.2019, MOD) GB/T 11344 Nondestructive testing - Ultrasonic thickness measurement ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29168.4-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 29168.4-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 29168.4-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29168.4-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |