GB/T 39673.6-2024 English PDFUS$754.00 ยท In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 39673.6-2024: Home and building electronic systems(HBES) and building automation and control systems(BACS) - Part 6: Requirements for planning and installation Status: Valid
Basic dataStandard ID: GB/T 39673.6-2024 (GB/T39673.6-2024)Description (Translated English): Home and building electronic systems(HBES) and building automation and control systems(BACS) - Part 6: Requirements for planning and installation Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K60 Classification of International Standard: 29.120.01 Word Count Estimation: 38,335 Date of Issue: 2024-09-29 Date of Implementation: 2025-04-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 39673.6-2024: Home and building electronic systems(HBES) and building automation and control systems(BACS) - Part 6: Requirements for planning and installation---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS 29.120.01 CCSK60 National Standard of the People's Republic of China Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) Part 6.Planning and installation requirements (IEC 63044-6.2021, IDT) Released on 2024-09-29 2025-04-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of ContentsPreface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms, definitions and abbreviations 2 4 Residential/Building Networks 3 5 Residential/Building Network Model and General Requirements 4 6 Infrastructure Requirements 5 7 HBES/BACS cable 15 8 Electrical safety and functional safety15 9 EMC 16 10 Grounding and Shielding 16 11 Fire prevention and fire resistance requirements 16 12 Environmental aspects16 13 Installation Files 16 Appendix A (Informative) Guidance for the installation of HBES/BACS in existing buildings 17 Appendix B (Informative) Installation Guidelines for Typical HBES/BACS Applications 18 Appendix C (Informative) Management and Documentation 26 Appendix D (Informative) Inspection and Test 27 Appendix E (Informative) HBES/BACS Application and Service Cluster 30 Reference 31 Figure 1 General topology of residential/building network for ICT, BCT, HBES/BACS network 5 Figure 2 Installation space 6 Figure 3 Building infrastructure 7 Figure 4 Horizontal infrastructure (floor distribution) 8 Figure 5 Example of ICT and BCT cabling infrastructure in a unit room 9 Figure 6 Example of infrastructure for a unit HBES network 9 Figure 7 Example of installation space allocation (IS5, IS6) 10 Figure 8 Indicative installation heights of common HBES/BACS equipment 11 Figure 9 Underground passage 13 Figure 10 Depth of underground passage 13 Figure 11 Example of channel planning to ensure a minimum bending radius (R). 0.5 m if the cable manufacturer does not provide relevant information14 Figure 12 Example of RF HBES/BACS, components can be powered by power cables and batteries or energy harvesting15 Figure B.1 Zone temperature control concept 19 Figure B.2 Temperature sensor positioning recommendations 19 Figure B.3 Example of a residential heating flow control valve main cabinet 20 Figure B.4 Example of external detection sensor 20 Figure B.5 Internal detection sensor example and basic installation rules 22 Figure B.6 Common examples of errors in internal sensor positioning 24 Figure B.7 Example of a water detector 25 Table 1 EMC requirements for coexistence of HBES/BACS and power cables 12 Table 2 Distance between tension wire boxes and cable type 13 Table E.1 HBES/BACS application and service clusters 30ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 6 of GB/T 39673 "Residential and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS)" GB/T 39673 has published the following parts. --- Part 1.General requirements; --- Part 3.Electrical safety requirements; --- Part 51.EMC requirements, conditions and test arrangements; --- Part 52.EMC requirements for HBES and BACS for residential, commercial and light industrial environments; --- Part 53.EMC requirements for HBES and BACS for use in industrial environments; --- Part 6.Planning and installation requirements. This document is equivalent to IEC 63044-6.2021 "Housing and building electronic systems (HBES) and building automation and control systems (BACS) Part 6.Planning and installation requirements. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electrical Equipment Industry Association. This document is under the jurisdiction of the National Technical Committee for Standardization of Electrical Accessories (SAC/TC67). This document was drafted by. Weikai Testing Technology Co., Ltd., Wenzhou Chint Smart Home Technology Co., Ltd., Jiangsu Tongling Technology Co., Ltd. Company, Zhejiang Zhilun Home Furnishing Technology Co., Ltd., Xiamen Tengshengxing Electronic Technology Co., Ltd., Guangdong Haobote Technology Co., Ltd., Zhejiang Delixi International Electric Co., Ltd., Guangdong Midea HVAC Equipment Co., Ltd., China Electric Power Research Institute Co., Ltd., Legrand Energy Electric (Huizhou) Co., Ltd., Guangdong Open University, Hangzhou Hongshi Electric Co., Ltd., Qingdao Haier Smart Building Technology Co., Ltd., Weihai Honglin Electric Power Technology Co., Ltd., Weikai (Shenzhen) Testing Technology Co., Ltd., Zhejiang Institute of Metrology, Beijing ABB Low Voltage Electrical Equipment Co., Ltd., Guangdong Jingcheng Electric Power Equipment Co., Ltd., Guangzhou Chuangbo Mechanical and Electrical Equipment Installation Co., Ltd., Shenzhen Senwei Qingdao Hisense Hitachi Air Conditioning System Co., Ltd., Shandong Dechang Electronic Technology Co., Ltd., Zhejiang Yuehua Electronic Technology Co., Ltd. Co., Ltd., Shandong Yaosi Intelligent Technology Co., Ltd., Guangdong Zhongren South China Testing Technology Co., Ltd., Hangzhou Ruili Acoustic Technology Co., Ltd. Company, Foshan New Infrastructure Technology Co., Ltd., China Southern Power Grid Big Data Service Co., Ltd., Guangdong Limai Testing Technology Co., Ltd., Zhejiang Xiemei Technology Technology Co., Ltd., Motor (Guangzhou) New Energy Technology Co., Ltd. The main drafters of this document are. Sun Ting, Xiang Peiwei, Jin Xiaoshi, Chen Heng, Yu Yegang, Zhong Yixiong, Liu Jian, Ke Hanwen, Li Yuanyang, Cai Jun, Liu Kaixi, Wang A-Lin, Yang Bao-Lin, Liu Xiao-Dong, Jing Yi-Xin, Guo Xiao-Wei, Chen Xu-Jiao, Yu Hai-Tao, Yan Hua, Zhou Xian-Cai, Huang Cheng-Zhang, Li Wen-Ping, Dai Bing, Zhang Wen-Qiang, Song Guangxi, Wang Sheng, Wang Zhewei, Liu Yue, Zhu Liangjun, Fan Zhiyong, Liu Ruiping, Ni Liaoyong, Hu Zhuohuai, Zheng Decan, Wang Tao.IntroductionHome and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) networks are part of home/building networks. ISO /IEC 14763-2 is a standard for cabling used in information and communication technology (ICT) and broadcasting and communication technology (BCT) applications. Specific standards for ICT and BCT cabling installation and planning. This document covers the installation of HBES/BACS networks in addition to the safety requirements for electrical installations specified in the IEC 60364 series of standards. and planning requirements. Specific requirements for installation and planning include. --- Cabling infrastructure; ---Coexist with power wiring; ---Sensor recommendations. This document also considers wireless systems. The planning of the cable backbone for wireless systems is not as complex as planning a complete wired network path and power cabling. This document also provides additional clauses to ensure coverage and reliability. GB/T 39673 "Residential and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS)" aims to standardize To meet the requirements of HBES/BACS and ensure the safety and reliability of the system, it is planned to consist of the following parts. --- Part 1.General requirements. The purpose is to standardize residential and building electronic systems (HBES) and building automation and control systems General requirements such as general requirements of (BACS), application and cluster overview. --- Part 3.Electrical safety requirements. The purpose is to standardize residential and building electronic systems (HBES) and building automation and control Technical requirements for overvoltage category, pollution degree, electrical safety, installation, etc. of the system (BACS). --- Part 51.EMC requirements, conditions and test arrangements. The purpose is to standardize residential and building electronic systems (HBES) and buildings Technical requirements such as EMC requirements, conditions and test arrangements for BACS. --- Part 52.EMC requirements for HBES and BACS for residential, commercial and light industrial environments. The purpose is to standardize General requirements, performance criteria, standard tests for EMC of HBES and BACS for residential, commercial and light industrial environments Conditions and EMC requirements and other technical requirements. --- Part 53.EMC requirements for HBES and BACS used in industrial environments. The purpose is to standardize the EMC requirements for HBES and BACS used in industrial environments. Technical requirements for EMC of HBES and BACS, including general requirements, performance criteria, standard test conditions and EMC requirements. --- Part 6.Planning and installation requirements. The purpose is to standardize residential and building electronic systems (HBES) and building automation and control Residential/building network models and general requirements, infrastructure requirements, cabling requirements, Technical requirements such as electrical safety and functional safety, electromagnetic compatibility (EMC) requirements, grounding and shielding requirements, fire prevention and fire resistance requirements, etc. This document will help regulate the planning and installation of Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS). to meet the installation requirements, promote the implementation of residential and building electronic systems (HBES) and building automation and control systems (BACS), and improve the The technology level of the Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) industries. Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) Part 6.Planning and installation requirements1 ScopeThis document specifies Home and Building Electronic Systems (HBES) and Building Automation and Control Systems (BACS) and their supporting infrastructure. planning and installation requirements. This document also considers HBES/BACS for radio frequency (RF). Safety requirements for home and building electronic systems (HBES) and building automation and control systems (BACS) and their supporting infrastructure Specified by IEC 60364 (all parts). Network equipment of Information and Communication Technology (ICT) and Broadcasting and Communication Technology (BCT) are typical interfaces of HBES/BACS. ISO /IEC 14763-2 covers the requirements for ICT and BCT network installations. This document does not include support for HBES/BACS, including. ---optical fiber; ---Power lines; ---Power over Ethernet (PoE).2 Normative referencesThe contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. Note. GB/T 18233.1-2022 Information technology user building common cabling Part 1.General requirements (ISO /IEC 11801-1.2017, MOD) ISO /IEC 14763-2 Information technology - Implementation and operation of cabling in user buildings - Part 2.Planning and installation Ningand installation) Note. GB/T 34961.2-2017 Information technology user building cabling implementation and operation Part 2.Planning and installation (ISO /IEC 14763-2. 2012, IDT) IEC 60364-4-41 Low-voltage electrical installations Part 4-41.Safety protection against electric shock (Low-voltage electrical in- Note. GB/T 16895.21-2020 Low voltage electrical installations Part 4-41.Safety protection Protection against electric shock (IEC 60364-4-41.2017, IDT) IEC 60364-4-44 Low voltage electrical installations Part 4-44.Protection against voltage disturbances and electromagnetic disturbances (Low- voltage electrical installations-Part 4-44.Protection for safety-Protection against voltage Note. GB/T 16895.10-2021 Low voltage electrical installations Part 4-44.Safety protection against voltage disturbances and electromagnetic disturbances (IEC 60364-4-44. 2018, IDT) IEC 60364-5-54 Low-voltage electrical installations Part 5-54.Selection and installation of earthing arrangements and protective conductors for electrical equipment ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 39673.6-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 39673.6-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 39673.6-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 39673.6-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |