Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 39207-2020 English PDF

US$339.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 39207-2020: Code of practice for installation and commissioning of anchor handling system
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 39207-2020339 Add to Cart 4 days Code of practice for installation and commissioning of anchor handling system Valid

Similar standards

JT/T 258   GB/T 37335   GB/T 37348   GB/T 39208   GB/T 39206   

Basic data

Standard ID: GB/T 39207-2020 (GB/T39207-2020)
Description (Translated English): Code of practice for installation and commissioning of anchor handling system
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: U16
Classification of International Standard: 47.020.99
Word Count Estimation: 18,179
Date of Issue: 2020-10-11
Date of Implementation: 2021-05-01
Regulation (derived from): National Standard Announcement No. 21 of 2020
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 39207-2020: Code of practice for installation and commissioning of anchor handling system

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Code of practice for installation and commissioning of anchor handling system ICS 47.020.99 U16 National Standards of People's Republic of China Anchor handling system installation and commissioning regulations 2020-10-11 released 2021-05-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee

Table of contents

Foreword Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Preparation before installation 2 4.1 File 2 4.2 Personnel 2 4.3 Tooling, tools and equipment 2 4.4 Installation conditions 3 5 Installation quality 3 5.1 Installation accuracy 3 5.2 Completeness 3 5.3 Weld quality 3 5.4 Fastness 4 5.5 Tightness 4 6 Installation procedure 4 6.1 Anchor handling winch installation 4 6.2 Installation of chain guide 5 6.3 Installation of guide chain groove 5 6.4 Installation of tail drum 5 6.5 Installation of shark pliers and bollards 5 6.6 Installation of Anchor Chain Transfer Winch 5 6.7 Installation of hydraulic equipment, electrical equipment, pipelines, etc. 5 7 Installation inspection 6 8 Debug 6 8.1 Purpose of debugging 6 8.2 Debugging files 6 8.3 Instruments, instruments and tools for debugging 6 8.4 Debugger 6 8.5 Debugging environment 6 8.6 Debugging conditions 7 8.7 Debugging 7 8.8 Debugging data collation and report submission 9 Appendix A (informative appendix) bolt torque reference table 10 Appendix B (informative appendix) Commissioning record table 11

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed and managed by the National Ocean Shipping Standardization Technical Committee (SAC/TC12). Drafting organizations of this standard. CSSC Huangpu Wenchong Shipbuilding Co., Ltd., China State Shipbuilding Industry Technical and Economic Research Institute, Guangzhou Huangchuan Ocean Shipping Engineering Co., Ltd. The main drafters of this standard. Chen Xiangrong, Chen Zunqing, Nie Lijun, Lian Boqiang, Liu Wei, Huang Jiayong, Luo Jiutian, He Jin, Jiang Wei, Sun Zhongliang, Liang Yujian, Huang Jianjun, Song Yibin. Anchor handling system installation and commissioning regulations

1 Scope

This standard specifies the pre-installation preparation, installation quality, installation procedures, installation inspection and commissioning requirements of the anchor handling system. This standard applies to the installation and commissioning of anchor handling systems.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 34000 China Shipbuilding Quality Standard GB 50661 Specification for Welding of Steel Structures CB/T 3190-2019 Steel hull structure welding groove type and size CB/T 3619 Ship system and power pipeline installation and tightness test quality requirements CB/T 3802 Requirements for surface quality inspection of ship hull welds

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Anchor handling system A system for other ships/platforms to perform anchoring and anchoring operations. Note. The anchor handling system is composed of anchor handling winches, tail drums, shark clamps, bollards, chain guides, chain guide grooves, anchor chain transfer winches and other equipment. See the layout diagram figure 1. 3.2 Anchor handling winch A winch that provides pulling force for other ships/platforms for anchoring and anchoring operations. 3.3 Shark pliers Hold the wire rope or anchor chain tightly to the clamped equipment.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 39207-2020_English be delivered?

Answer: Upon your order, we will start to translate GB/T 39207-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 39207-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 39207-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.