Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 39206-2020 English PDF

US$559.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 39206-2020: Code of practice for installation and commissioning of fixed azimuth thruster
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 39206-2020559 Add to Cart 5 days Code of practice for installation and commissioning of fixed azimuth thruster Valid

Similar standards

JT/T 258   GB/T 37335   GB/T 37348   GB/T 39208   GB/T 39207   

Basic data

Standard ID: GB/T 39206-2020 (GB/T39206-2020)
Description (Translated English): Code of practice for installation and commissioning of fixed azimuth thruster
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: U16
Classification of International Standard: 47.020.99
Word Count Estimation: 30,350
Date of Issue: 2020-10-11
Date of Implementation: 2021-05-01
Regulation (derived from): National Standard Announcement No. 21 of 2020
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 39206-2020: Code of practice for installation and commissioning of fixed azimuth thruster

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Code of practice for installation and commissioning of fixed azimuth thruster ICS 47.020.99 U16 National Standards of People's Republic of China Fixed full-rotation rudder propeller device Installation and commissioning procedures 2020-10-11 released 2021-05-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee

Table of contents

Preface Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Preparation before installation 3 4.1 File 3 4.2 Personnel 3 4.3 Tooling, tools and equipment 3 4.4 Environmental conditions 3 4.5 Installation conditions 3 5 Installation quality requirements 4 5.1 Installation accuracy requirements 4 5.2 Completeness 4 5.3 Weld quality 4 5.4 Tightness 4 5.5 Fastness 4 6 Installation procedure 5 6.1 Installation flowchart 5 6.2 Determine the reference point and the positioning mark of the rudder propeller device 5 6.3 Opening mounting holes 5 6.4 Hoisting of rudder propeller 5 6.5 Fixing the rudder propeller device 6 6.6 Intermediate shaft alignment 6 6.7 Promote motor alignment and installation 6 7 Installation inspection 7 8 Debug 7 8.1 General requirements 7 8.2 Mooring commissioning 8 8.2.1 Purpose of debugging 8 8.2.2 Debugging files 8 8.2.3 Instruments, instruments and tools for debugging 8 8.2.4 Debugger 8 8.2.5 Debugging environment 8 8.2.6 Debugging conditions 8 8.2.7 Debug 9 8.3 Navigation Commissioning 12 8.3.1 Purpose of debugging 12 8.3.2 Debugging files 12 8.3.3 Instruments, instruments and tools for debugging 12 8.3.4 Debugger 12 8.3.5 Debugging environment 12 8.3.6 Debugging conditions 12 8.3.7 Debugging 12 Appendix A (Informative Appendix) Mooring Commissioning Record Form 15 Appendix B (Informative Appendix) Voyage Commissioning Record Form 21

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed and managed by the National Ocean Shipping Standardization Technical Committee (SAC/TC12). Drafting organizations of this standard. CSSC Huangpu Wenchong Shipbuilding Co., Ltd., China State Shipbuilding Industry Technical and Economic Research Institute, Guangzhou Shipyard International Co., Ltd. the company. The main drafters of this standard. Jiang Benjian, Fu Yongli, Nie Lijun, Wu Demei, Zheng Dengyong, Zhuo Ningning, Liu Wei, Cui Changyi, Ma Qiang, Yang Guanjun, Wan Chao, Xu Yangyi, Pan Xichun. Fixed full-rotation rudder propeller device Installation and commissioning procedures

1 Scope

This standard specifies the pre-installation preparation, installation quality requirements, and installation procedures for fixed azimuth rudder propeller devices (hereinafter referred to as rudder propeller devices). Sequence, installation inspection and debugging requirements. This standard applies to the installation and commissioning of electric propulsion gear-driven fixed azimuth rudder propellers. Conventional power propulsion and integral pod The installation and commissioning regulations for the full-rotation rudder propeller device can be implemented by reference.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 3471 Sea-going ship mooring and navigation test general rules GB/T 34000-2016 China Shipbuilding Quality Standard CB/T 3190-2019 Steel hull structure welding groove type and size CB/T 3558 Radiographic inspection process and quality classification of ship steel welds CB/T 3559 Ultrasonic testing process and quality classification of ship steel welds CB/T 3802 Requirements for surface quality inspection of ship hull welds CB/T 3909-2019 Ship electrical equipment installation process CB20112 Shipment equipment protection requirements

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Fixed full-rotation rudder propeller device It is welded or bolted to install a propeller or duct propeller that can rotate 360° around a vertical axis and can provide a full range of thrust. Note. Electric propulsion fixed azimuth rudder propeller devices can be divided into the following two types according to the layout. a) Type L. The propulsion motor and the azimuth rudder propeller device are L-shaped power transmission methods. The four parts of the gearbox and the underwater part are shown in Figure 1. b) Type Z. The propulsion motor and the azimuth rudder propeller device are Z-shaped power transmission methods. The four components of the gearbox and the underwater part are shown in Figure 2.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 39206-2020_English be delivered?

Answer: Upon your order, we will start to translate GB/T 39206-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 39206-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 39206-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.