Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 37006-2018 English PDF

US$519.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 37006-2018: Testing equipment for digital input electricity meters
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 37006-2018519 Add to Cart 5 days Testing equipment for digital input electricity meters Valid

Similar standards

GB/T 15284   GB/T 17215.321   GB/T 34067.2   GB/T 26862   GB/T 17215.241   

Basic data

Standard ID: GB/T 37006-2018 (GB/T37006-2018)
Description (Translated English): Testing equipment for digital input electricity meters
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: N22
Classification of International Standard: 17.220.20
Word Count Estimation: 26,291
Date of Issue: 2018-12-28
Date of Implementation: 2019-07-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 37006-2018: Testing equipment for digital input electricity meters

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Testing equipment for digital input electricity meters ICS 17.220.20 N22 National Standards of People's Republic of China Digital electric energy meter inspection device Published on.2018-12-28 2019-07-01 implementation State market supervision and administration China National Standardization Administration issued

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and definitions, abbreviations 1 3.1 Terms and Definitions 1 3.2 Abbreviations 2 4 standard quantified power value 3 4.1 Standard voltage value 3 4.2 Standard current value 3 4.3 Reference frequency 3 5 Mechanical requirements 3 5.1 General requirements 3 5.2 Source, working standards (tables) and network switches 3 5.3 wall rack 3 5.4 Interface 3 6 climatic conditions and temperature limit requirements 3 6.1 Normal climatic conditions 3 6.2 Surface temperature limit 4 7 Electrical requirements 4 7.1 Power supply 4 7.2 Insulation 4 8 Electromagnetic compatibility requirements 5 8.1 General requirements 5 8.2 Radio interference suppression 5 8.3 Electrostatic discharge immunity 5 9 Communication requirements 5 9.1 Protocol Consistency 5 9.2 Frame dispersion 5 9.3 Optical power 6 10 Accuracy requirements 6 10.1 Test Reference Condition 6 10.2 Basic error 7 10.3 Measurement repeatability 8 10.4 Impact Quantity 9 11 Main components of the inspection device Requirements 10 11.1 Source 10 11.2 Monitoring Instrumentation 12 11.3 Working Standards (Table) 13 11.4 Standard chronograph 13 11.5 Error calculation system 13 11.6 Network Switch 13 12 sample value message request 15 12.1 Parameter Configuration 15 12.2 Abnormal Event Output 15 12.3 Sample Value Message Loss Simulation 15 13 Stability requirements 15 14 Inspection rules 15 14.1 Type test 15 14.2 Acceptance test 15 15 Marking, packaging and storage 15 15.1 Sign 15 15.2 Packing 16 15.3 Storage 16 Appendix A (informative) Block diagram of the inspection device 17 Appendix B (Normative) Test item 19

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This standard was proposed by the China Machinery Industry Federation. This standard is under the jurisdiction of the National Electrotechnical Instrumentation Standardization Technical Committee (SAC/TC104). This standard was drafted. Harbin Electric Instrument Research Institute Co., Ltd., Guangdong Power Grid Corporation Electric Power Research Institute, Shenzhen Xinglong Branch Technology Co., Ltd., Shenzhen Kelu Electronic Technology Co., Ltd., China Southern Power Grid Science Research Institute Co., Ltd., Jiangxi Electric Power Institute of Science, China Electric Power Research Institute, China Institute of Metrology, State Grid Hubei Electric Power Company Electric Power Research Institute, Yantai East Fang Weisi Dun Electric Co., Ltd., State Grid Shandong Electric Power Company Electric Power Research Institute, Shenzhen Jiangji Industrial Co., Ltd., Guizhou Power Grid Limited liability company Electric Power Research Institute, Zhejiang Zhengtai Instrument and Meter Co., Ltd., Shenzhen Aerospace Tairuijie Electronics Co., Ltd., Weisheng Group Co., Ltd., Huali Technology Co., Ltd., Sichuan Electric Power Company Measurement Center, Zhejiang Wansheng Intelligent Technology Co., Ltd., Germany Lixi Group Instrument Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd. Electric Power Research Institute, State Grid Jilin Electric Power Company Power Science Research Institute, Harbin University of Science and Technology, Taiyuan Youte Aoke Electronic Technology Co., Ltd., Zhengzhou Sanhui Electric Co., Ltd., Jiangsu Linyangeng Source Co., Ltd., Heilongjiang Electrician Instrumentation Engineering Technology Research Center Co., Ltd., Ningxia Longji Ningguang Instrument Co., Ltd. Division, Nanjing Electric Power Automation Equipment Factory Co., Ltd., State Grid Hubei Electric Power Company, State Grid Xinjiang Electric Power Research Institute Metrology Center, Wuhan Zhongyuan Electronic Information Co., Ltd. Drafters of this standard. Pan Feng, Huang Jianzhong, Liu Xiancheng, Zhang Dengqing, Yuan Huizhen, Xiao Yong, Wang Wenguo, Lin Guoying, Shen Li, Zhao Zhenyu, Huang Hongtao, Bai Jingfen, Li Wei, Sun Shijie, Zhang Qiuyan, Jiang Zisong, Chen Wenxin, Hou Qingquan, Qi Shaoping, Zhao Yantao, Wang Xinjian, Luo Yurong, Ai Bing, Li Zhaogang, Yao Guojun, Luo Zhongming, Mu Xiaoxing, Yu Xu, Cao Rui, Yu Yizhou, Peng Jianzhong, Cao Xianyu, Jin Zaidong, Wang Yonghui, Lu Jin, Wang Xingang, Liu Jian, Xu Qing, Duan Meimei, Zhang Shuyuan. Digital electric energy meter inspection device

1 Scope

This standard specifies the technical requirements, test methods and inspections of fixed digital electric energy meter inspection devices (hereinafter referred to as "inspection devices"). rule. This standard applies to newly manufactured digital energy meter testing devices. This standard does not apply to portable digital energy meter testing devices.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2900.77-2008 Electrotechnical terminology - Electrotechnical measurement and instrumentation - Part 1 [IEC 60050 (300-311)..2001, IDT] GB/T 4798.1-2005 Environmental conditions for the application of electric and electronic products - Part 1. Storage (IEC 60721-3-1..1997, MOD) GB 4824-2013 Industrial, Scientific and Medical (ISM) Radio Frequency Equipment Harassment Characteristics Limits and Measurement Methods (IEC /CISPR11. 2010, IDT) GB/T 11150-2001 Electric energy meter inspection device (IEC 60736.1982, NEQ) GB/T 12325-2008 Power quality supply voltage deviation GB/T 13384-2008 General technical conditions for mechanical and electrical product packaging GB/T 16935.1-2008 Insulation of equipment in low-voltage systems - Part 1. Principles, requirements and tests (IEC 60664-1. 2007, IDT) GB/T 17045-2008 General part of electric shock protection devices and equipment (IEC 61140.2001, IDT) GB/T 17215.303-2013 Particular requirements for measuring equipment - Part 3. Digital energy meter GB/T 17215.321-2008 Particular requirements for measuring equipment - Part 21. Static active energy meter (1 Level 2) (IEC 62053-21..2003, IDT) GB/T 17626.2-2018 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test (IEC 61000-4-2.2008, IDT) GB/T 18268.1-2010 Electromagnetic compatibility requirements for electrical equipment - Part 1 . General requirements (IEC 61326-1.2005, IDT) DL/T 460-2005 AC power meter test device verification procedures DL/T 860.92-2016 Power automation communication networks and systems - Part 9-2. Specific communication service mapping (SCSM)--- Sampled values based on ISO /IEC 8802-3 (IEC 61850-9-2.2011, IDT) YD/T 1141-2007 Ethernet Switch Test Method 3 terms and definitions, abbreviations 3.1 Terms and definitions The following terms and definitions as defined in GB/T 2900.77-2008 and GB/T 17215.303-2013 apply to this document.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 37006-2018_English be delivered?

Answer: Upon your order, we will start to translate GB/T 37006-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 37006-2018_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 37006-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.