GB/T 34473-2017 English PDFUS$519.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34473-2017: Methods of determination and calculation of heat balance for sintering machine Status: Valid
Basic dataStandard ID: GB/T 34473-2017 (GB/T34473-2017)Description (Translated English): Methods of determination and calculation of heat balance for sintering machine Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: H04 Classification of International Standard: 77-010 Word Count Estimation: 26,222 Date of Issue: 2017-10-14 Date of Implementation: 2018-07-01 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 34473-2017: Methods of determination and calculation of heat balance for sintering machine---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Methods of determination and calculation of heat balance for sintering machine ICS 77-010 H04 National Standards of People's Republic of China Heat Balance Test and Calculation Method of Sintering Machine 2017-10-14 Published 2018-07-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed by China Iron and Steel Association. This standard by the National Standardization Technical Committee Steel (SAC/TC183) centralized. This standard was drafted by. Shougang Corporation, Metallurgical Industry Information Standards Institute, Beijing University of Science and Technology, Anshan Iron and Steel Group Mining Co., Ltd. The main drafters of this standard. Peiyuan Dong, Qi Chenglin, Wang Jiangwei, Zhang Xiaopeng, Anyang, Qiu Jinhui, Chen Shaoguo, Shi Fengkui, Zhao Zhixing, Ma Huaiying, Gao Jingjun, Pan Wen, Shi Jiangshan, Feng Gensheng, Cheng Zhengming, Zhao Yong, Kang Haijun, Luo Yaosheng, Huang Donghui, Shi Chunli, Gao Junchi. Heat Balance Test and Calculation Method of Sintering Machine1 ScopeThis standard specifies the sintering machine heat balance test terms and definitions, heat balance test and calculation of benchmarks, equipment profiles and the main technical parameters Number, test preparation, test steps, test content and methods, material balance calculation, thermal balance calculation, analysis of measurement results and suggestions for improvement, Heat Balance Test Report. This standard applies to the steel industry sintering machine heat balance test and calculation.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 476 Determination of carbon and hydrogen in coal GB 50408 Sinter plant design specifications3 Terms and definitionsGB 50408 defined terms and definitions apply to this document.4 heat balance test and calculation basis4.1 Baseline temperature and pressure The reference temperature is the ambient temperature at 1m from the plant where the sintering machine system is located. Pressure is based on one atmosphere. 4.2 fuel heat Use received base low (bit) heat. 4.3 test range Test range for the sintering machine (not including the ring cooler), sintering flue gas test until the end of waste heat utilization. 4.4 test time and frequency In the same variety of materials and specifications, the case of stable system conditions for continuous testing; thermal balance test should be continuous operation of the sintering machine system 8h to complete, the number of tests per day can not be less than 2 times, continuous testing for 3 days. 4.5 Calculation Unit Material balance and thermal balance of the unit of calculation are unit weight of finished ore ore required amount of material kg/t and the required heat kJ/t.5 equipment overview and main technical parametersRefer to Appendix A for the performance and general information of the equipment and the main technical parameters. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34473-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34473-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 34473-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34473-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |