Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 34148-2017 English PDF

US$179.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 34148-2017: Guide for calculation of water saved by projects
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 34148-2017179 Add to Cart 3 days Guide for calculation of water saved by projects Valid

Similar standards

GB/T 35073   GB 35971   GB/T 35071   GB/T 34149   GB/T 34147   

Basic data

Standard ID: GB/T 34148-2017 (GB/T34148-2017)
Description (Translated English): Guide for calculation of water saved by projects
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F04
Word Count Estimation: 9,999
Date of Issue: 2017-09-07
Date of Implementation: 2018-04-01
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 34148-2017: Guide for calculation of water saved by projects

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide for calculation of water saved by projects ICS 13.060.25 F04 National Standards of People's Republic of China Project water-saving calculation guide 2017-09-07 Posted 2018-04-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard proposed by the Ministry of Water Resources, National Development and Reform Commission. This standard by the National Water Standardization Technical Committee (SAC/TC442) centralized. This standard drafting unit. China National Institute of Standardization, China Institute of Water Resources and Hydropower Research, Water Resources Water Resources Management Center, Beijing Xinhua Water-saving Products Certification Co., Ltd. The main drafters of this standard. Zhang Jiqun, Wu Yihong, Xu Feng Ran, Zhu Chunyan, Luo Lin, Zhang Shuling, Baiyin package Rigao, Yin Chunxia, Hu Mengting, Mu Xiangpeng, Chen Xingru, Liu Hui, Feng Zhixiang, Chen Yucan, Xiong Yisong, Li Sinuo, Liu Jing. Project water-saving calculation guide

1 Scope

This standard specifies the project terms and definitions of water-saving calculation, the general requirements and methods. This standard applies to water-saving technological transformation projects (hereinafter referred to as "project") calculation of water-saving, new projects, water-saving management projects The calculation can be used for reference.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 12452 business water balance test rules GB/T 21534 industrial water-saving terms GB 24789 water units of water measuring instruments and management of general rules GB/T 26719 General rules of business water use

3 Terms and definitions

GB/T 12452, GB/T 21534 and GB/T 26719 and defined by the following terms and definitions apply to this document. 3.1 Project water saving watersavedbyprojects To meet the same needs or to achieve the same purpose, through the implementation of the project, the amount of water taken by the water unit relative to the reduction of unimplemented projects A small amount. 3.2 Baseline baselineperiod To compare and determine the amount of water-saving, water-saving measures before the implementation of a certain period of time. 3.3 Statistical report period To compare and determine the amount of water-saving, water-saving measures after the implementation of a certain period of time. 3.4 Adjust water withdrawal Water use units (enterprises), systems and equipment within the boundary of the project will be used to take water before the project is implemented, and after the conditions are calibrated according to the statistical reporting period Get the amount of water.

4 General requirements

4.1 The calculation and statistics of water withdrawal shall comply with the requirements of GB/T 12452 and GB/T 26719. 4.2 water measuring instruments and management should be equipped with GB 24789 requirements. 4.3 According to project requirements and site conditions to determine the project boundary, all affected by water-saving measures of water units, equipment, systems (including subsidiary,
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 34148-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 34148-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 34148-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 34148-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.