Path:
Home >
GB/T >
Page456 > GB/T 32973-2016
Price & Delivery
US$139.00 · In stock · Download in 9 secondsGB/T 32973-2016: Technical specification for hot charging and hot delivery of semi-closed arc furnace
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 32973-2016 | English | 139 |
Add to Cart
|
3 days [Need to translate]
|
Technical specification for hot charging and hot delivery of semi-closed arc furnace
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 32973-2016 (GB/T32973-2016) |
| Description (Translated English) | Technical specification for hot charging and hot delivery of semi-closed arc furnace |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | H04 |
| Classification of International Standard | 77.010 |
| Word Count Estimation | 7,798 |
| Date of Issue | 2016-08-29 |
| Date of Implementation | 2017-07-01 |
| Regulation (derived from) | National Standard Announcement 2016 No.14 |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 32973-2016: Technical specification for hot charging and hot delivery of semi-closed arc furnace
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for hot charging and hot delivery of semi-closed arc furnace
ICS 77.010
H04
National Standards of People's Republic of China
Technical specification for hot - charging of semi - enclosed submerged arc furnace
2016-08-29 released
2017-07-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by China Iron and Steel Industry Association.
This standard is under the jurisdiction of the National Steel Standardization Technical Committee (SAC/TC183).
The drafting of this standard. Wuxi Top Bang Metallurgical Technology Co., Ltd., Metallurgical Industry Information Standards Institute, Beijing Matt Leji Engineering Technology
Co., Ltd., Yunnan Jianshui Manganese Mine Co., Ltd.
The main drafters of this standard. Qiu Jinhui, Yan Qinglin, Gao Deyun, Wang Jiangwei, Xu Xiufei, Ji Aimin, Jiao Peng.
Technical specification for hot - charging of semi - enclosed submerged arc furnace
1 Scope
This standard specifies the terminology and definition, principles and processes of semi-enclosed submerged arc furnace hot charging technology. Generally, the system technology
Technical indicators, operation and maintenance, inspection and acceptance.
This standard applies to semi-enclosed submerged furnaces.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
Test method for thermal test of GB/T 10863 flue - type waste heat boiler
Code for design of small thermal power plant GB 50049
3 terms and definitions
The following terms and definitions apply to this document.
3.1
Waste heat using wasteheatrecovery
Based on the ambient temperature, the use of recoverable heat energy in the high temperature flue gas produced by the production process of the submerged arc furnace.
3.2
Preheating equipment
The use of flue gas waste heat or other heat source to preheat the raw materials.
3.3
Hot charging technology hotcharging andhotdeliverytechnology
Furnace raw materials or with the ratio of the charge through the flue gas waste heat or other heat preheating equipment, reducing the charge moisture content, at higher temperatures
The process of loading into the submerged arc furnace.
Principle and Process
The use of charge preheating device (heat exchange hopper, rotary kiln, etc.), the smelting furnace generated by the flue gas waste heat or other heat sources (such as sintering smoke
Gas waste heat, cooling water vaporization waste heat, etc.) on the ratio of the completion of the charge by the preheating equipment for heating, the material will be installed in the hot material into the submerged arc furnace,
Reduce the moisture content of raw materials into the furnace, to improve the temperature of the furnace into the raw materials. The process is shown in Figure 1.
...