GB/T 32594-2016 English PDFUS$239.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32594-2016: Guide of emergency power supply for pumped storage power plant Status: Valid
Basic dataStandard ID: GB/T 32594-2016 (GB/T32594-2016)Description (Translated English): Guide of emergency power supply for pumped storage power plant Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: P63 Classification of International Standard: 91.140.50 Word Count Estimation: 12,130 Date of Issue: 2016-04-25 Date of Implementation: 2016-11-01 Regulation (derived from): National Standard Announcement No Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 32594-2016: Guide of emergency power supply for pumped storage power plant---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Guide of emergency power supply for pumped storage power plant ICS 91.140.50 P63 National Standards of People's Republic of China Technical Guidelines for Safety Power Supply of Pumped Storage Power Station 2016-04-25 released 2016-11-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released ForewordThis standard is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The release of this document The Agency does not assume responsibility for identifying these patents. This standard is proposed by the China Electricity Council and centralized. The drafting unit of this standard. State Grid New Source Holdings Limited, Zhejiang Xianju Pumped Storage Co., Ltd. The main drafters of this standard. Huang Yuezhao, Wang Hongyu, Zhang Quansheng, Jiang Chenghai, Luo Chengzong, Zhao Zheng, Li Jingyan, Ding Guang, Wei Chunlei, Song Ruifeng, Ge Junqiang, Wang Xiaojun, Hao Feng, Hu Qingjuan. Technical Guidelines for Safety Power Supply of Pumped Storage Power Station1 ScopeThis standard specifies the set principles and technical requirements of the safety power supply for the pumped storage power station. This standard applies to installed capacity of 250MW and above pumped storage power station security power supply configuration, 250MW following pumped storage power Station can refer to the implementation.2 normative reference documentsThe following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. Code for design of plant power consumption of AB/T 35044 hydroelectric power plant3 terms and definitionsThe following terms and definitions apply to this document. The terms and definitions not specified in this standard shall be in accordance with NB/T 35044. 3.1 Factory power supply normalservicepowersupply Pumped storage power station in the normal operation of the operation of the plant power supply. 3.2 Standby power supply standbyservicepowersupply Pumped storage power station to work after the power out of the supplementary power supply. 3.3 Security load In the case of loss of power supply and standby power supply, the protection of personal safety and power station safety of the necessary load. 3.4 Power supply security power supply emergencypowersupply Power supply for the safety load when the utility power supply and the standby power supply are lost. 3.5 Black boot power black startpowersupply The power station lost the power supply and standby power supply, power plant unit is not by the station or connected to the power system power supply, and Is powered by another set of power supply, this power supply is black boot power.4 set the principle4.1 Pumped storage power station should be set up security power, capacity configuration and power quality should meet the security load requirements. 4.2 pumped storage unit to bear the black start function, the security power should also serve as a black start power, its capacity should ensure that the black start unit safety Kai Required for ancillary and auxiliary equipment Power load requirements. 4.3 security power supply and power supply power should be independent, and should have to prevent the two power supply side by side operation of the measures. 4.4 security power should be able to automatically start running. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32594-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 32594-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 32594-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32594-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |