Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 3048.13-2025 English PDF

US$359.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 3048.13-2025: Test methods for electrical properties of electric cables and wires - Part 13: Impulse voltage test
Status: Valid

GB/T 3048.13: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 3048.13-2025359 Add to Cart 4 days Test methods for electrical properties of electric cables and wires - Part 13: Impulse voltage test Valid
GB/T 3048.13-2007369 Add to Cart 3 days Test methods for electrical properties of electric cables and wires -- Part 13: Impulse voltage test Valid
GB/T 3048.13-1992279 Add to Cart 3 days Electric cables and wires--Method for impulse ovtage test Obsolete

Similar standards

GB/T 3048.4   GB/T 3048.11   GB/T 3048.12   

Basic data

Standard ID: GB/T 3048.13-2025 (GB/T3048.13-2025)
Description (Translated English): Test methods for electrical properties of electric cables and wires - Part 13: Impulse voltage test
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K13
Classification of International Standard: 29.060.20
Word Count Estimation: 18,115
Date of Issue: 2025-10-05
Date of Implementation: 2026-05-01
Older Standard (superseded by this standard): GB/T 3048.13-2007
Issuing agency(ies): State Administration for Market Regulation and Standardization Administration of China

GB/T 3048.13-2025: Test methods for electrical properties of electric cables and wires - Part 13: Impulse voltage test


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29.060.20 CCSK13 National Standards of the People's Republic of China Replaces GB/T 3048.13-2007 Electrical performance test methods for wires and cables Part 13.Impulse Voltage Test Part 13.Impulse Voltage Test Implemented on May 1, 2026 State Administration for Market Regulation The State Administration for Standardization issued a statement.

Table of contents

Preface III Introduction V 1.Scope 1 2 Normative References 1 3.Terms and Definitions 1 4.Measurement of test voltage 1 5.Sample Preparation 6.Lightning Impulse Voltage Test 5 7.Switching impulse voltage test 6. 8.Superimposed impulse voltage test 6 9.Experimental Procedure 7 10.Test Results and Evaluation 9 11.Precautions 9. 12.Experimental Records 9

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents". Drafting. This document is Part 13 of GB/T 3048 "Test Methods for Electrical Properties of Wires and Cables". GB/T 3048 has published the following... part. ---Part 1.General Provisions; ---Part 2.Resistivity Testing of Metallic Materials; ---Part 3.Volume Resistivity Test of Semiconducting Rubber and Plastic Materials; ---Part 4.Conductor DC Resistance Test; ---Part 5.Insulation Resistance Test; ---Part 7.Tracking Resistance Test; ---Part 8.AC Voltage Test; ---Part 9.Spark Test of Insulated Wire Cores; ---Part 10.Spark Test for Extruded Sheaths; ---Part 11.Dielectric Loss Tangent Test; ---Part 12.Partial Discharge Tests; ---Part 13.Impulse Voltage Test; ---Part 14.DC Voltage Test; ---Part 16.Surface Resistance Test. This document replaces GB/T 3048.13-2007 "Test Methods for Electrical Properties of Wires and Cables - Part 13.Impulse Voltage Test", and is consistent with... Compared with GB/T 3048.13-2007, apart from structural adjustments and editorial changes, the main technical changes are as follows. ---The peak oscillation and overshoot requirements have been modified (see 4.1.1.1,.2007 version 4.1.1.1); ---Added graphical illustrations of the test voltage waveform (see 4.1.2.1 and 4.1.2.2); ---The operating impulse voltage waveform has been modified (see 4.1.2.2,.2007 version 4.1.2.2); ---Added requirements for stacked impact tests (see 4.1.1.3, 4.1.2.3, 4.3.1.3, and 9.1.5); ---A superimposed impulse voltage test has been added (see Chapter 8); ---The description of the validity of the experimental data has been revised (see 9.3.1 and 9.3.2, 6.3 in the.2007 edition); ---The description of the impulse voltage margin test has been revised (see 9.4, 6.4 in the.2007 edition); ---The description of the fast overcurrent protection device for the impulse voltage generator in the precautions has been deleted (see section 8.1 of the.2007 edition); ---The description of atmospheric calibration has been revised (see 11.4, 8.5 in the.2007 edition); ---The requirements for test records have been changed (see Chapter 12, Chapter 9 of the.2007 edition). Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents. This document was proposed by the China Electrical Equipment Industry Association. This document is under the jurisdiction of the National Technical Committee on Standardization of Wires and Cables (SAC/TC213). This document was drafted by. Shanghai Guolan Testing Co., Ltd., Shanghai Cable Research Institute Co., Ltd., and Guangdong Power Grid Co., Ltd. Guangzhou Power Supply Bureau, Baosheng High Voltage Cable Co., Ltd., Guangzhou Cable Co., Ltd., Fujian Nanping Taiyang Cable Co., Ltd., Guangzhou Nanyang Electric Cable Group Co., Ltd. The main drafters of this document are. Li Chuang, Li Xingchen, Huang Yang, Huang Jiasheng, Ma Guofeng, Lu Rilin, Fan Defa, Wang Zhihui, and Guo Rongrong. The release history of this document and the document it replaces is as follows. ---First published in.1992 as GB/T 3048.13-1992, and first revised in.2007 as GB/T 3048.13-2007; ---This is the second revision.

Introduction

Wires and cables are widely used in power transmission and signal transmission, and various types of products are available depending on the application scenario. Electrical performance is a key evaluation criterion. GB/T 3048 is an important general indicator of the performance of electrical wires and cables, and is of great significance for ensuring the design and use objectives of electrical wires and cables. GB/T 3048 establishes universal fundamental test methods applicable to the electrical performance testing of different types of wires and cables. It is proposed that these methods be developed by the following 14 departments. Composition. ---Part 1.General Provisions. This document aims to define the terminology, definitions, and general provisions for testing the electrical properties of wires and cables. ---Part 2.Resistivity Testing of Metallic Materials. The purpose is to specify the testing methods and requirements for the resistivity of metallic materials in wires and cables. ---Part 3.Volume Resistivity Test for Semiconducting Rubber and Plastic Materials. The purpose is to determine the volume resistivity of semiconducting rubber and plastic materials used in wires and cables. Test methods and requirements for resistivity. ---Part 4.DC Resistance Test for Conductors. The purpose is to specify the test methods and requirements for the DC resistance of conductors in wires and cables. ---Part 5.Insulation Resistance Test. The purpose is to specify the test methods and requirements for the insulation resistance of wires and cables. ---Part 7.Tracking Resistance Test. The purpose is to specify the test methods and requirements for the tracking resistance of wires and cables. ---Part 8.AC Voltage Test. The purpose is to specify the test methods and requirements for AC voltage of wires and cables. ---Part 9.Spark Test of Insulated Cores. The purpose is to specify the test methods and requirements for spark testing of insulated cores in electrical wires and cables. ---Part 10.Spark Test for Extruded Sheaths. The purpose is to specify the test method and procedures for the spark test when extruding the corrosion-resistant sheath of wires and cables. Require. ---Part 11.Dielectric Loss Tangent Test. The purpose is to specify the test method for the dielectric loss tangent of wires and cables. Require. ---Part 12.Partial Discharge Tests. The purpose is to specify the test methods and requirements for partial discharge in wires and cables. ---Part 13.Impulse Voltage Test. The purpose is to specify the test methods and requirements for impulse voltage of wires and cables. ---Part 14.DC Voltage Test. The purpose is to specify the test methods and requirements for DC voltage of wires and cables. ---Part 16.Surface Resistance Test. The purpose is to specify the test methods and requirements for the surface resistance of wires and cables. Note. The original GB/T 3048 standard system had 16 parts, but GB/T 3048.5-2007 replaced GB/T 3048.5-1994 and GB/T 3048.6- GB/T 3048.9-2007 replaced GB/T 3048.9-1994 and GB/T 3048.15-1994, therefore the current GB/T 3048 standard system has fewer standards. Parts 6 and 15. Test methods for electrical properties of wires and cables Part 13.Impulse Voltage Test

1 Scope

This document describes the test method for impulse voltage of wires and cables, including sample preparation, test procedure, test results and evaluation, and precautions. Items and test records. This document applies to impulse voltage tests on various types of power cables and their accessories with a maximum rated voltage Um of 1kV and above.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included. For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies. This document. GB/T 311.6 Standard air gap for high voltage measurement GB/T 2900.19 Electrical Terminology. High Voltage Testing Techniques and Insulation Coordination GB/T 3048.1 Test methods for electrical properties of wires and cables - Part 1.General principles GB/T 16927.1-2011 High Voltage Testing Techniques – Part 1.General Definitions and Test Requirements GB/T 16927.2 High Voltage Testing Techniques – Part 2.Measurement Systems

3 Terms and Definitions

The terms and definitions defined in GB/T 2900.19 and GB/T 3048.1, as well as the following terms and definitions, apply to this document. 3.1 The test sample is subjected to a DC voltage while an impulse voltage is applied. Note. The superimposed impulse voltage test is a composite voltage test specified in GB/T 16927.1-2011. 4.Measurement of test voltage 4.1 Requirements for test voltage 4.1.1 Test voltage value 4.1.1.1 Test voltage value for lightning impulse voltage test For smooth lightning impulse waves, the test voltage value is the peak value of the impulse voltage wave. For some test circuits, the peak value of the impulse voltage wave is... Oscillations or overshoots may occur at the value. Overshoot and oscillations near the peak are permissible, and the maximum allowable relative overshoot should not exceed 10%. The calculation of standard lightning impulse parameters with superimposed overshoot or oscillation should be carried out in accordance with Appendix B of GB/T 16927.1-2011.(The relevant information regarding oscillations is not provided in the original text.) The requirements should comply with the provisions of 7.2.2 in GB/T 16927.1-2011. 4.1.1.2 Test voltage value for the switching impulse voltage test For the operational shock wave, the test voltage value is the peak value.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 3048.13-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 3048.13-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 3048.13-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 3048.13-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 3048.13-2025?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 3048.13-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.


Refund Policy     Privacy Policy     Terms of Service