Path:
Home >
GB/T >
Page299 > GB/T 2900.52-2008
Price & Delivery
US$509.00 · In stock · Download in 9 secondsGB/T 2900.52-2008: Electrotechnical terminology -- Generation, transmission and distribution of electricity -- Generation
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
GB/T 2900.52: Historical versions
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 2900.52-2008 | English | 509 |
Add to Cart
|
4 days [Need to translate]
|
Electrotechnical terminology -- Generation, transmission and distribution of electricity -- Generation
|
| GB/T 2900.52-2000 | English | 719 |
Add to Cart
|
5 days [Need to translate]
|
Electrician term power generation, transmission and distribution of electricity generation
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 2900.52-2008 (GB/T2900.52-2008) |
| Description (Translated English) | Electrotechnical terminology -- Generation, transmission and distribution of electricity -- Generation |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | K04 |
| Classification of International Standard | 01.040.29 |
| Word Count Estimation | 22,243 |
| Date of Issue | 2008-06-18 |
| Date of Implementation | 2009-05-01 |
| Older Standard (superseded by this standard) | GB/T 2900.52-2000 |
| Adopted Standard | IEC 60050-602-1983, MOD |
| Regulation (derived from) | Announcement of Newly Approved National Standards No. 10 of 2008 (total 123) |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
| Summary | This standard specifies the generation, transmission and distribution areas related to power generation part of the terminology. This section applies to power system planning, management, design, power generation, transmission and distribution and other fields. |
GB/T 2900.52-2008: Electrotechnical terminology -- Generation, transmission and distribution of electricity -- Generation
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electrotechnical terminology. Generation, transmission and distribution of electricity. Generation
ICS 01.040.29
K04
National Standards of People's Republic of China
Replacing GB/T 2900.52-2000
Electrotechnical terminology
Power generation, transmission and distribution of electricity
(IEC 60050-602. 1983, MOD)
Posted 2008-06-18
2009-05-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Terms and definitions 1
2.1 Plant [plant] 1
2.2 Equipment and Facilities 3
2.3 Plant [plant] Run 8
Chinese index 11
English 13 Index
Foreword
This is Part 52 GB/T 2900's.
The partial modification of the use of IEC 60050-602. 1983 "International Electrotechnical Vocabulary - Part 602. Generation, transmission and distribution of electricity," and
Reference 2003 International Electrotechnical Commission document (1/1903/CD), modify some of the definitions of terms.
This part of IEC 60050-602. Compared to 1983, there is a technical difference.
--- 602-02-32 [33], 602-03-08 [09], 602-03-11 [12], 602-03-19 [20], 602-03-21 [22], 602- 03-25 [26]
They were changed to separate two;
--- 602-02-38 [39] [40] to separate the three.
This Part replaces GB/T 2900.52-2000 "Electrotechnical terminology Generation, transmission and distribution of electricity."
This section compared with the GB/T 2900.52-2000 main changes are as follows.
--- Modify the term entry number;
Chinese terminology --- 602-03-16 and 602-03-17 increase "[power system]," explained;
--- Modified 602-01-05,602-02-04 such definitions;
--- 602-02-32 [33], 602-03-08 [09], 602-03-11 [12], 602-03-19 [20], 602-03-21 [22], 602- 03-25 [26]
They were changed to separate two;
--- 602-02-38 [39] [40] to separate the three.
This part of the National Electrotechnical Terminology Standardization Technical Committee (SAC/TC232) and focal points.
This in part by China Electric Power Research Institute, Chinese Academy of Sciences and the China Electricity Council machinery responsible for drafting.
The main drafters of this section. Xinde Pei, Xu Ying, Yang Fu.
This part of the standard replaces the previous editions. GB/T 2900.52-2000.
Electrotechnical terminology
Power generation, transmission and distribution of electricity
1 Scope
This section provides the terms of generation, transmission and distribution related to the field of power generation portion.
This section applies to the planning, management, design, power generation, transmission and distribution and other areas of power system.
2 Terms and definitions
2.1 Plant [plant]
602-01-01
Power Plant [Station]
Production of electricity from the plant building, energy conversion equipment and all the necessary auxiliary equipment thereof.
602-01-02
Power system all power generation equipment.
Note. it may consist of some of them, such as thermodynamic system.
602-01-03
Convert water energy into electricity various engineering and construction, a combination of machinery and apparatus.
602-01-04
The flow of energy is converted to electrical energy power plant.
602-01-05
River flows directly into the power station hydropower generation, in its runoff into the reservoir water storage capacity is negligible.
602-01-06
Runoff water from the reservoir to the maximum time of no more than a few weeks hydroelectric [plant].
Note. Especially during low load, runoff accumulated in the reservoir, so that the turbine can be run during periods of high load, or the next few days in the future.
602-01-07
Runoff water from the reservoir to the station for more than several weeks.
Note. usually adequate water runoff during the accumulation in the reservoir, so that the turbine running during future high load.
602-01-08
Tidal power station water level difference.
602-01-09
The water pump upgrade storage facilities for hydroelectric power generation.
...