US$449.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 26688-2023: Automatic test systems for battery powered emergency escape lighting
Status: Valid
GB/T 26688: Historical versions
| Standard ID | USD | BUY PDF | Lead-Days | Standard Title (Description) | Status |
| GB/T 26688-2023 | 449 |
Add to Cart
|
4 days
|
Automatic test systems for battery powered emergency escape lighting
| Valid |
| GB 26688-2011 | 799 |
Add to Cart
|
4 days
|
[GB/T 26688-2011] Automatic test systems for battery powered emergency escape lighting
| Obsolete |
Basic data
Standard ID: GB/T 26688-2023 (GB/T26688-2023)
Description (Translated English): Automatic test systems for battery powered emergency escape lighting
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K70
Classification of International Standard: 29.140.50
Word Count Estimation: 22,277
Date of Issue: 2023-12-28
Date of Implementation: 2024-07-01
Older Standard (superseded by this standard): GB/T 26688-2011
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration
GB/T 26688-2023: Automatic test systems for battery powered emergency escape lighting
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29:140:50
CCSK70
National Standards of People's Republic of China
Replace GB/T 26688-2011
Battery-powered emergency evacuation lighting automatic test system
(IEC 62034:2012,MOD)
Published on 2023-12-28
2024-07-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration Committee
Table of contents
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 request 2
5 Test duration and intervals 5
6 Protection of buildings during testing and subsequent recharging of emergency lighting systems 6
7 Labeling and recording of test results of testing equipment 9
Appendix A (informative) Examples of typical automatic test systems 10
Appendix B (Normative) Classification of ATS 15
Appendix C (informative) ATS User Guide 16
Reference 17
Foreword
This document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents"
Drafting:
This document replaces GB/T 26688-2011 "Battery-powered emergency evacuation lighting automatic test system" and is consistent with GB/T 26688-2011
In comparison, in addition to structural adjustments and editorial changes, the main technical changes are as follows:
a) Changed the requirements for monitoring of timing circuits (see 4:2, 4:2 of the:2011 edition);
b) Changed the requirements for automatic test systems (ATS) (see 4:3:1, 4:3:1 of the:2011 version);
c) Changed the requirements for internal communication failure (see 4:4:2, 4:4:2 of the:2011 version);
d) Changed the requirements for component failure (see 4:4:4, 4:4:4 of the:2011 edition);
e) Changed the requirements for software failure (see 4:4:7, 4:4:7 of the:2011 version);
f) The requirements for functional testing have been changed (see 5:1, 5:1 of the:2011 version);
g) The requirements for continuous testing have been changed (see 5:2, 5:2 of the:2011 version);
h) Changed the requirements for timer accuracy (see 6:2:2, 6:2:2 of the:2011 version);
i) Changed the requirements for interactive lamp testing (see 6:3:2:2, 6:3:2:2 of the:2011 edition);
j) The requirements for limited continuous testing have been changed (see 6:3:3:4, 6:3:3:4 of the:2011 edition);
k) Changed general requirements (see 7:1,:2011 version of 7:1):
This document is modified to adopt IEC 62034:2012 "Battery-powered automatic test system for emergency evacuation lighting":
The technical differences between this document and IEC 62034:2012 and their reasons are as follows:
---Replaced IEC 60598-1 with normative reference GB/T 7000:1, and GB/T 7000:222 replaced IEC 60598-2-
22, to facilitate the application of series standards:
Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents:
This document is proposed by China Light Industry Federation:
This document is under the jurisdiction of the National Lighting Appliances Standardization Technical Committee (SAC/TC224):
This document was drafted by: Shanghai Quality Supervision and Inspection Technology Research Institute, Xiamen Lidaxin Lighting Co:, Ltd:, National Semiconductor and Display
Product Quality Inspection Center (Shandong), Huarong Lighting Co:, Ltd:, Shanghai Times Lighting Electrical Inspection Co:, Ltd:
The main drafters of this document: Zhao Zhubo, Li Mei, Xu Jianxing, Song Peng, Li Miaohua, Jiang Lili, Shi Xiaohong, Yang Yue:
The previous versions of this document and the documents it replaces are as follows:
---First published as GB/T 26688-2011 in:2011;
---This is the first revision:
Introduction
The emergency lighting system is a safety-related product, and the correctness of its performance needs to be guaranteed through system testing and maintenance: traditional detection techniques
The technique relies on manual detection procedures and is susceptible to oversight: Automated detection procedures can overcome the limitations of traditional technologies: important
Yes, the automatic test system for emergency lighting can reliably arrange testing and provide real-time reminders of performance failure and performance degradation:
When a fault is discovered, the automatic test system (ATS) will still require manual intervention to correct the fault and set procedures for such intervention: This series
The system provides information and supports users in risk management at the place of use:
ATS for emergency evacuation lighting displays test results at predetermined intervals without cutting off any other electrical equipment to help
Building managers: In order to restore the emergency evacuation system to full operation, provide early notification of performance failures and degradations that occur
is very important: ATS provides information for emergency lighting facilities to ensure that the installed luminaires can function properly when needed:
ATS is part of the building management system (BMS) for emergency lighting inspection; this document only applies to emergency lighting in the BMS:
Ming detection part:
Visual inspection of system components and indicators is a routine part of the safety officer's job: This inspection needs to be carried out on a daily basis to ensure that the emergency lighting fixtures
Ready to use and complete, with lights and indicators functioning properly and clearly visible, i:e: not obscured, obscured or altered:
Battery-powered emergency evacuation lighting automatic test system
1 Scope
This document specifies the automatic testing of independent products and combinations used with emergency lighting systems with a power supply voltage not exceeding 1000V:
Basic performance and safety requirements for components within the system:
This document also specifies the functional requirements for a complete automatic test system for emergency lighting systems:
This document applies to test systems containing self-contained emergency lighting fixtures or a central battery associated with an emergency lighting fixture:
NOTE: Manual test equipment that relies on manual initialization and/or visual inspection of lamp status is outside the scope of this document:
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations
For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to
this document:
GB/T 7000:1 Luminaires Part 1: General requirements and tests (GB/T 7000:1-2023, IEC 60598-1:2020, MOD)
GB/T 7000:222 Luminaires Part 2-22: Emergency lighting fixtures with special requirements (GB/T 7000:222-2023,
IEC 60598-2-22:2021, MOD)
IEC 60073 Basic and safety rules for the marking of human-machine interface signs Coding rules for indicators and operating devices (Basicand
torsandactuators)
Note: GB/T 4025-2010 Basic and safety rules for human-machine interface sign identification Coding rules for indicators and operating devices (IEC 60073:
2002,IDT)
IEC 61347-1 Lamp control gear Part 1: General and safety requirements (Lampcontrolgear-Part 1:
Note: GB/T 19510:1-2023 Light source control device Part 1: General requirements and safety requirements (IEC 61347-1:2017, MOD)
Note: GB/T 18595-2014 Electromagnetic compatibility and immunity requirements for general lighting equipment (IEC 61547:2009, IDT)
3 Terms and definitions
The terms and definitions defined in IEC 7000:222 and the following apply to this document:
3:1
Automatic test system automatictestsystem;ATS
An automatic test system that can be initialized manually: When connected together to form a system, it can perform routine testing requirements and standardize emergency lighting fixtures:
It consists of components that display test results (such as timers, current probes, light probes, and transfer switches):
3:2
An emergency lighting fixture with a built-in test device for conducting tests and marking the test results:
Note: Examples of self-contained luminaires are given in Appendix A:
......
Tips & Frequently Asked Questions:
Question 1: How long will the true-PDF of GB/T 26688-2023_English be delivered?
Answer: Upon your order, we will start to translate GB/T 26688-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.
Question 2: Can I share the purchased PDF of GB/T 26688-2023_English with my colleagues?
Answer: Yes. The purchased PDF of GB/T 26688-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.
Question 3: Does the price include tax/VAT?
Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):
List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?
Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
Question 5: Should I purchase the latest version GB/T 26688-2023?
Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 26688-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.