GB/T 25328-2010 English PDFUS$189.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 25328-2010: Monitoring and testing for energy saving of glass kiln Status: Valid
Basic dataStandard ID: GB/T 25328-2010 (GB/T25328-2010)Description (Translated English): Monitoring and testing for energy saving of glass kiln Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F01 Classification of International Standard: 27.010 Word Count Estimation: 8,854 Date of Issue: 2010-11-10 Date of Implementation: 2011-02-01 Quoted Standard: GB/T 4272 Regulation (derived from): Announcement of Newly Approved National Standards No. 8 of 2010 (total 163) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the glass furnace energy monitoring program, monitoring methods and assessment indicators. This standard applies to coal, oil and gas glass furnace. GB/T 25328-2010: Monitoring and testing for energy saving of glass kiln---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Monitoring and testing for energy saving of glass kiln ICS 27.010 F01 National Standards of People's Republic of China Glass furnace energy monitoring Issued on. 2010-11-10 2011-02-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordAppendix A of this standard is a normative appendix. This standard by the National Standardization Technical Committee for Energy Management and focal points. This standard was drafted. Tianjin energy monitoring four points, Tianjin Institute of Energy Technology, Industrial Furnace Co., Ltd. Tianjin Saiyo. The main drafters. Zhang review, Ren Changqing, Shangke Wu, Zhu Tianli, Wang Jinxiang, Jia Jun, Yang Ying, Liu Feng, Huoquan Lan, Chen Shan, Song Wei. Glass furnace energy monitoring1 ScopeThis standard specifies the glass furnace energy monitoring program, monitoring methods and assessment indicators. This standard applies to coal, oil and gas in the glass furnace.2 Normative referencesThe following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 4272 General technical equipment and pipeline insulation3 Terms and DefinitionsThe following terms and definitions apply to this standard. 3.1 Kiln surface temperature temperaturerisingofkilnsurface Glass furnace surface temperature and the difference between ambient temperature.4 glass furnace energy monitoring projectCheck item 4.1 4.1.1 The kiln should be tight, heat pipe network integrity, and in accordance with the relevant provisions of GB/T 4272's. 4.1.2 auxiliary combustion means and facilities configuration is reasonable, and complete. Fuel oil heating furnace temperature should be able to meet the requirements of good atomization. 4.1.3 measuring instruments is complete, reasonable, and in the test cycle. 4.1.4 exhaust flue system, flue gates, chimneys and other settings should be reasonable and work properly. 4.2 Test Project 4.2.1 exhaust gas temperature. 4.2.2 air factor. 4.2.3 kiln surface temperature. 4.2.4 Exhaust gas combustible components. CO, H2, CH4.5 energy monitoring method5.1 Conditions and Monitoring time Requirements and testing production equipment when operating normally, relatively stable thermal conditions, the molten glass inside the furnace temperature fluctuations of no more than ± 10 ℃, time monitoring Less than 2h. 5.2 Monitoring Instruments Monitoring instruments should be intact, the measurement range and resolution should be adapted to measure the project, its accuracy should not be less than the requirements of Table 1, And in the test cycle. Instrument accuracy not less than the value specified in Table 1 of the new instrument, applicable to this standard. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 25328-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 25328-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 25328-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 25328-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |