GB/T 24737.8-2009 English PDFUS$139.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 24737.8-2009: Guide for technological management -- Part 8: Process verification Status: Valid
Basic dataStandard ID: GB/T 24737.8-2009 (GB/T24737.8-2009)Description (Translated English): Guide for technological management -- Part 8: Process verification Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: J30 Classification of International Standard: 25.020 Word Count Estimation: 6,611 Date of Issue: 2009-11-30 Date of Implementation: 2010-09-01 Regulation (derived from): National Standard Approval Announcement 2009 No.14 (Total No.154) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the scope of the validation process, basic tasks, main content validation and verification procedures. This section applies to the process validation of mechanical products. GB/T 24737.8-2009: Guide for technological management -- Part 8: Process verification---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Guide for technological management Part 8. Process verification ICS 25.020 J30 National Standards of People's Republic of China Technological management Part 8. Process Validation Posted 2009-11-30 2010-09-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordGB/T 24737 "technological management" is divided into nine sections. --- Part 1. General; --- Part 2. Product craft work program; --- Part 3. Product Structure Process review; --- Part 4. Process design; --- Part 5. Process Planning; --- Part 6. process optimization and technology assessment; --- Part 7. Process Quota; --- Part 8. Process Validation; --- Part 9. production site process management. This section GB/T Part of 824,737. Appendix A of this section is an informative annex. This part of the National Technical product documentation Standardization Technical Committee (SAC/TC146) and focal points. This section is drafted. the machine Productivity Promotion Center, Chongqing Dajiang Xinda Vehicles Co., Ltd., advanced technology and equipment Forming States Key laboratories. The main drafters of this section. Xidao Yun, Ding Hongyu, Jiang Shiqing, ZHANG Xiu-fen, single Zhongde, Liu Meng, Hanlin Lin, Xiao Chengxiang. Technological management Part 8. Process Validation1 ScopeThis section GB/T 24737 specifies the scope of the validation process, the basic tasks, the main content verification and validation procedures. This section applies to process validation of mechanical products.2 scope of the validation processIf students mass production of new products, after the prototype trial identification before mass production, process validation should be carried out by a small group of trial. Basic Task 3 Process Validation By a small group of trial production and reasonable assessment process design, adaptability, to ensure product quality and stability in mass production, low cost, and Compliance with safety and environmental protection requirements.4 Verify the contents of the mainRouting technology and process requirements --- key member and an important member is reasonable and feasible; --- The choice of equipment and process equipment whether it can meet the technical requirements; --- Test means meets the requirements; --- Assembly and assembly line methods can ensure technical requirements; --- Process Meets labor safety, green manufacturing requirements.5 Process Validation Program5.1 verify the implementation plan developed Content Verification implementation plan should include. verification major project, proven technology, organizational measures, schedule, budget and so on. 5.2 preparation before verification Before verifying all relevant departments should verify implementation plan to do the following preparations. --- Issued a verification plan; --- To prepare the verification process documents and related information required; --- Provide all the necessary technology and equipment; --- Prepare all the materials required for authentication; --- Do test preparation; --- Do pre-production preparation. 5.3 to perform verification Must be in strict accordance with the requirements of pre-production process documents 5.3.1 verification. 5.3.2 verification process, the relevant processes and tooling design must often track visits to the production site, identify problems in a timely manner Solve and cause of the problem and measures to resolve detailed records. 5.3.3 verification process, the process of production personnel should listen carefully to the operator's rationalization proposals, to help improve technology, tooling recommendations to Actively adopt. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 24737.8-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 24737.8-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 24737.8-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 24737.8-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |